Posted date: 25-Nov-2025 7:33:06 PM VN
Some amends and supplements of the

Circular No. 09/2025/TT-BCT⚠️ - Method of determining the electricity generation price bracket and electricity import price bracket from February 1, 2025

within:
  • Circular No. 54/2025/TT-BCT - Amendments to regulations on electricity generation price framework and electricity generation price calculation method
  • Circular No. 25/2025/TT-BCT - Supplementing regulations on building a power generation price bracket for wind power and solar power
  • Effected from: 21-Nov-2025
    Below is a detailed analysis of the amendments and supplements of Circulars 25/2025/TT-BCT and 54/2025/TT-BCT to Circular 09/2025/TT-BCT, focusing on the contents related to the original Circular.
    ### New additions
    ◦ Circular 25/2025/TT-BCT:
    ◦ Article 1: Add clauses 7 and 8 to Article 3 of Circular 09/2025/TT-BCT, detailing the development of a power generation price framework for wind power by region and sea area, as well as the basis for determining regions for solar power and onshore wind power.
    ◦ Circular 54/2025/TT-BCT:
    ◦ Article 1.1: Add point c to Clause 1, Article 1 of Circular 09/2025/TT-BCT, expanding the scope of regulation to include small renewable energy power plants whose avoided cost price schedule expires, power plants whose power purchase or BOT contracts expire.
    ◦ Article 1.4: Add clause 7 after clause 6, Article 2 of Circular 09/2025/TT-BCT, defining "Flexible power plant".
    ◦ Article 1.8: Add Article 8a after Article 8 of Circular 09/2025/TT-BCT, regulating the method of determining the electricity generation price framework for types of "other power plants" such as small-capacity coal-fired thermal power plants, coal-fired thermal power plants using state capital, coal-fired thermal power plants borrowing domestic currency capital, and small renewable power plants that have lost their price incentives.
    ### Changes
    FocusOld (Circular 09/2025/TT-BCT)New (Amended Circular)
    Scope of application (Article 1.2.a)Exclusion of "independently invested energy storage battery systems"Addition of exclusion of "independently invested energy storage battery systems"
    Definition of pumped storage hydropower plant (Article 2.3)"A pumped storage hydropower plant is a hydropower plant that uses a water storage system at different elevations to store energy and generate electricity, in which water is pumped from a low-elevation water storage area to a higher-elevation water storage area during non-generation times to store energy.""A pumped storage hydropower plant is a hydropower plant that uses a water storage system at different elevations to store hydropower and generate electricity, in which water is pumped from a low-elevation water storage area to a higher-elevation water storage area during non-generation times to store hydropower and discharge it through a turbine to generate electricity when the power system needs it." Replace "energy" with "hydropower"
    Formula for calculating investment cost (Article 5.2)Original formula, definition of components (DF, re, rd, tax rate T)Modified formula (In terms of mathematical notation).
    Formula for calculating financial discount rate (Article 5.5)Original formula, definition of components (DF, re, rd, tax rate T)Modified formula (In terms of mathematical notation).
    Loan interest calculation formula (Article 5.5.a)Original formula, definition of components (DF, rd,F, DD, rd,D)Modified formula (In terms of mathematical notation).
    Dossier for approval of electricity generation price framework (Article 12.1.b)"Parameter table and documents for calculating electricity generation price framework as prescribed in Articles 4, 5, 6, 7 and 8 of this Circular;""Parameter table and documents for calculating electricity generation price framework as prescribed in Articles 4, 5, 6, 7, 8 and Article 8a of this Circular;" (Add Article 8a)
    Circular 54/2025/TT-BCT (Article 2) amends and supplements a number of articles of Circular No. 12/2025/TT-BCT:
    ◦ Article 2.1: Amending and supplementing Clause 3, Article 1 of Circular No. 12/2025/TT-BCT, adding the following non-applicable subjects: "Pumped storage hydropower plants; independently invested energy storage battery systems; power plants applying the electricity purchase price mechanism in documents of competent authorities."
    ◦ Article 2.2: Add clause 16 after clause 15, Article 2 of Circular No. 12/2025/TT-BCT, defining "P50 Expectation Level".
    ◦ Article 2.3: Amending and supplementing points b and c, Clause 2, Article 5 of Circular No. 12/2025/TT-BCT, related to the economic life of power plants and the method of calculating average electricity generation over many years.
    ◦ Article 2.4: Amending and supplementing Clause 2, Article 10 of Circular No. 12/2025/TT-BCT, related to determining the average annual delivered electricity and total project investment.
    ◦ Article 2.5: Supplement Clause 3, Article 22 of Circular No. 12/2025/TT-BCT, related to the construction of major repair cost ratios, other costs and labor costs for types of power plants that have not been regulated.
    ◦ Article 2.6: Amend the title of Table 2 in Appendix I of Circular No. 12/2025/TT-BCT, related to the ratio of operation and maintenance costs of solar and wind power plants.
    ### Repealed or expired
    There is no information about repeal or expiration in the "Amendments" provided.
    ### Overview of the impact of the difference
    ◦ Circular 25/2025/TT-BCT focuses on clarifying regulations on wind power price frameworks by region and area, in order to create more favorable conditions for the development of this type of energy.
    ◦ Circular 54/2025/TT-BCT has a broader scope of regulation, adding regulations related to flexible power plants, other power plants (such as small-capacity coal-fired thermal power plants or those using state capital), as well as adjusting definitions and calculation formulas. This addition helps the electricity generation price framework become more flexible and suitable for many different types of power plants, while solving problems arising in actual implementation.
    ◦ The amendment and supplementation of calculation formulas in Article 5 (Circular 54/2025/TT-BCT) may affect the calculation results of the electricity generation price framework, thereby affecting the revenue and profits of power plants.
    ◦ Clarifying the definition and scope of application (e.g. pumped storage hydropower plants, energy storage battery systems) helps avoid disputes and misunderstandings during implementation.
    ◦ Adding regulations on "other power plants" (Article 8a - Circular 54/2025/TT-BCT) can create more favorable conditions for these plants to participate in the electricity market, especially plants whose incentives or BOT contracts have expired.
    ◦ Amendments and supplements to Circular No. 12/2025/TT-BCT (related to the method of determining electricity generation service prices and electricity purchase contracts) also have an indirect impact on the electricity generation price framework, as this price framework is the basis for negotiating electricity prices in electricity purchase contracts.
    Posted date: 25-Nov-2025 25 2025 7:34PM VN
    Some new points of the:

    Circular No. 09/2025/TT-BCT⚠️ - Method of determining the electricity generation price bracket and electricity import price bracket from February 1, 2025

    on replacing of:
    • Circular No. 20/2024/TT-BCT⛔ - New method for establishing the generation price framework
    Effective date: 01-Feb-2025
    What's new
    ◦ Expanded scope of regulation (Article 1): Circular 09/2025/TT-BCT expands the scope of regulation, including:
    ◦ Detailed regulations on documents, procedures, and processes for developing and approving the electricity import price framework and methods for developing the electricity import price framework according to Clause 5, Article 46 of the Electricity Law No. 61/2024/QH15.
    ◦ Applicable to domestic organizations that import electricity from Laos and China.
    ◦ Explanation of new terms (Article 2): Circular 09/2025/TT-BCT adds explanations for new terms, reflecting the development of the electricity industry:
    ◦ Calculation parameters set.
    ◦ Power system and electricity market operator.
    ◦ Pumped storage hydroelectric power plant.
    ◦ Floating solar power plant.
    ◦ Ground-mounted solar power plant.
    ◦ Onshore wind power plant.
    ◦ Principles for establishing electricity generation price framework for solar power plants by region (Article 3.4): The Circular stipulates that the electricity generation price framework for solar power plants is built based on the average annual radiation intensity of 03 (three) regions: the North, the Central and the South.
    ◦ Regulations on renewable energy power plants with electricity storage systems (Article 3.6): The Circular clearly stipulates how to calculate the total investment level when calculating the electricity generation price frame for renewable energy power plants that use combined electricity storage systems.
    ◦ Variable price for pumped storage hydropower plants (Article 6.4): The Circular stipulates that the variable price is a component to recover water storage costs determined by the electricity output consumed during the water storage cycle, the off-peak electricity retail price applied to manufacturing industries as prescribed and the cost of purchasing reactive power.
    ◦ Method for determining electricity import price framework (Article 9): The Circular specifically stipulates the method for determining electricity import price framework from Laos and China, including the following cases:
    ◦ As stipulated in international treaties.
    ◦ Import electricity from power plants.
    ◦ Import electricity through the national grid.
    ◦ Documents, order and procedures for approving the electricity import price framework (Article 11): The Circular clearly stipulates the steps, time and responsibilities of relevant parties in establishing, appraising and approving the electricity import price framework.
    ### Changes
    FocusOldNew
    Subjects of application (Article 1)Circular 57/2014/TT-BCT: "Power generation units owning power plants connected to the national power system with a total installed capacity of over 30MW..."Circular 09/2025/TT-BCT: "Agencies, organizations and individuals owning power plants operating in the territory of the Socialist Republic of Vietnam connected to the national power system, except for multi-purpose strategic hydropower plants, small renewable energy plants applying the avoided cost price list, power plants and generators providing ancillary services; power plants applying the electricity purchase price mechanism in documents of competent authorities..."
    Calculation parameters (Article 5.4)There are no specific regulations on the basis for determining the calculated investment rate.Circular 09/2025/TT-BCT: The calculated investment rate is determined according to one of the following bases: the investment rate of the power plant with the selected calculated capacity value; the average investment rate of power plants with the same technology type; actual data on power purchase contract negotiations; or reference data from consulting organizations.
    Average delivered power (Article 5.6)For solar and wind power plants in Circular 15/2022/TT-BCT, the average delivered power is determined based on specific parameters such as total area of photovoltaic panel installation, average annual radiation intensity, photovoltaic panel conversion efficiency, solar power plant efficiency, and wind power plant capacity factor.Circular 09/2025/TT-BCT provides more detailed regulations on how to determine the H parameter (average annual radiation intensity) for solar power plants in the North, Central, and South regions, based on information on basic surveys of renewable energy resources announced by competent authorities. At the same time, the circular supplements regulations on how to determine the average delivered power for pumped storage hydropower plants based on the power system demand and the amount of water pumped into the reservoir in the Feasibility Study Report.
    Main fuel price (Article 6.2)Circular 31/2022/TT-BCT stipulates the main fuel price (Pnlc) for coal-fired thermal power plants and combined-cycle gas turbine plants using natural gas and LNG.Circular 09/2025/TT-BCT supplements regulations on main fuel prices for waste-to-energy power plants (electricity produced from waste), in which Pnlc takes into account subsidies from fuel collection, transportation and treatment in accordance with the law on environmental protection.
    Document for approval (Article 12)Circular 57/2014/TT-BCT provides general regulations on documents for approval of electricity generation prices.Circular 09/2025/TT-BCT provides more detailed regulations on documents for approval of electricity generation price framework, including submission form, parameter table, calculation documents, and requires direct submission of 01 set of documents in the form of data message and direct submission of 01 set of documents in paper form (if necessary).
    ### Removal points
    ◦ Specific regulations on Standard Power Plants according to capacity ranges (Article 4 of Circular 57/2014/TT-BCT): Circular 09/2025/TT-BCT no longer specifically regulates Standard Power Plants according to capacity ranges as Circular 57/2014/TT-BCT. Instead, Circular 09/2025/TT-BCT only mentions Standard Power Plants as a general concept for calculating the electricity generation price framework.
    ◦ Specific parameters in the Appendix of Circular 57/2014/TT-BCT: Circular 09/2025/TT-BCT no longer stipulates specific parameters (such as Tmax, loan ratio, operating and maintenance cost ratio, fuel consumption rate...) in the Appendixes like Circular 57/2014/TT-BCT. Instead, Circular 09/2025/TT-BCT stipulates that these parameters are determined on the basis of the Feasibility Study Report, basic design, or referencing data from consulting organizations.
    ◦ Regulations on average avoidable cost prices of the North, Central and South regions according to Circular 32/2014/TT-BCT (Article 9 of Circular 57/2014/TT-BCT): The method of determining the ceiling price of hydropower plants based on the average avoidable cost prices of the regions according to Circular 32/2014/TT-BCT has been eliminated. Instead, Circular 09/2025/TT-BCT stipulates that the maximum price is built on the basis of the annual avoidable cost price schedule according to the method prescribed in Article 8 of Circular 09/2025/TT-BCT.
    ◦ Regulations on the ratio of electricity produced by season and by hour during the year (Appendix 1 of Circular 57/2014/TT-BCT): Circular 09/2025/TT-BCT no longer specifically regulates the ratio of electricity produced by season and by hour during the year to determine the ceiling price of hydropower plants.
    ◦ Concept of "Refined capacity" (Article 2 of Circular 57/2014/TT-BCT): The concept of "Refined capacity" is no longer used and explained in Circular 09/2025/TT-BCT.
    This analysis helps clarify changes in regulations on electricity generation price framework, showing updates and adjustments to suit the development situation of Vietnam's electricity industry.

    ai-luatvietnam-icon-24 Change analysis