Posted date: 25-Nov-2025 7:34:36 PM VN
Limits and regulations must know within the

Circular No. 09/2025/TT-BCT⚠️ - Method of determining the electricity generation price bracket and electricity import price bracket from February 1, 2025

Effective date: 01-Feb-2025
Limitations
◦ Maximum Electricity Generation Price (Article 3): The electricity generation price range is from 0 VND/kWh to the maximum price specified for each type of power plant (except hydropower), which must not be exceeded. For hydropower, the maximum price is based on the annual avoided cost tariff.
◦ Electricity Import Price Ceiling (Article 9): Electricity import price must not exceed the maximum price (ceiling price) converted according to the foreign exchange rate in the year of price framework development and applied separately for each country. This price is determined based on international agreements, avoided cost price list or marginal cost according to average electricity, depending on the import source.
### Need to know
◦ Providing Feasibility Study Report (Article 10): The power plant investor is responsible for providing the Feasibility Study Report on construction investment and basic design to Vietnam Electricity Group within 15 days after these documents are approved/appraised.
◦ Proposed Parameters and Price Calculation (Article 10): Before November 1 of each year, Vietnam Electricity Group must propose sets of parameters and calculate the maximum price for the electricity generation price frame of power plant types according to regulations.
◦ Establishing a dossier for calculating the electricity generation price framework (Article 10): Vietnam Electricity Group must prepare a dossier for calculating the electricity generation price framework according to the provisions of Article 12 and submit it to the state electricity management agency for appraisal.
◦ Checking the Approval Documents (Article 10): The state management agency of electricity is responsible for checking the completeness and validity of the application documents for approval of the electricity generation price framework within 5 working days from the date of receipt.
◦ Appraisal and Approval of Price Framework (Article 10): The state management agency of electricity at the Ministry of Industry and Trade is responsible for appraising and submitting to the Minister of Industry and Trade for approval of the electricity generation price framework within 25 days from the date of receiving valid documents.
◦ Establishing Avoidable Cost Tariffs (Article 11): The national electricity system and electricity market operator must establish an annual avoidable cost tariff and submit it to the state electricity management agency for appraisal.
◦ Request for Approval (Article 12): The request for approval of the price framework must include a presentation, parameter table, calculation documents and other relevant documents.
◦ Responsibilities of the Parties (Article 13): The State management agency of electricity, Vietnam Electricity Group and the National Electricity System and Market Operator all have specific responsibilities in implementing the provisions of the Circular.