Layout & language BEN
Sign in
Posted date: 25-Nov-2025 7:33:06 PM VN
Some amends and supplements of the

Circular No. 09/2025/TT-BCT⚠️ - Method of determining the electricity generation price bracket and electricity import price bracket from February 1, 2025

within:
  • Circular No. 54/2025/TT-BCT - Amendments to regulations on electricity generation price framework and electricity generation price calculation method
  • Circular No. 25/2025/TT-BCT - Supplementing regulations on building a power generation price bracket for wind power and solar power
  • Effected from: 21-Nov-2025
    Below is a detailed analysis of the amendments and supplements of Circulars 25/2025/TT-BCT and 54/2025/TT-BCT to Circular 09/2025/TT-BCT, focusing on the contents related to the original Circular.
    ### New additions
    ◦ Circular 25/2025/TT-BCT:
    ◦ Article 1: Add clauses 7 and 8 to Article 3 of Circular 09/2025/TT-BCT, detailing the development of a power generation price framework for wind power by region and sea area, as well as the basis for determining regions for solar power and onshore wind power.
    ◦ Circular 54/2025/TT-BCT:
    ◦ Article 1.1: Add point c to Clause 1, Article 1 of Circular 09/2025/TT-BCT, expanding the scope of regulation to include small renewable energy power plants whose avoided cost price schedule expires, power plants whose power purchase or BOT contracts expire.
    ◦ Article 1.4: Add clause 7 after clause 6, Article 2 of Circular 09/2025/TT-BCT, defining "Flexible power plant".
    ◦ Article 1.8: Add Article 8a after Article 8 of Circular 09/2025/TT-BCT, regulating the method of determining the electricity generation price framework for types of "other power plants" such as small-capacity coal-fired thermal power plants, coal-fired thermal power plants using state capital, coal-fired thermal power plants borrowing domestic currency capital, and small renewable power plants that have lost their price incentives.
    ### Changes
    FocusOld (Circular 09/2025/TT-BCT)New (Amended Circular)
    Scope of application (Article 1.2.a)Exclusion of "independently invested energy storage battery systems"Addition of exclusion of "independently invested energy storage battery systems"
    Definition of pumped storage hydropower plant (Article 2.3)"A pumped storage hydropower plant is a hydropower plant that uses a water storage system at different elevations to store energy and generate electricity, in which water is pumped from a low-elevation water storage area to a higher-elevation water storage area during non-generation times to store energy.""A pumped storage hydropower plant is a hydropower plant that uses a water storage system at different elevations to store hydropower and generate electricity, in which water is pumped from a low-elevation water storage area to a higher-elevation water storage area during non-generation times to store hydropower and discharge it through a turbine to generate electricity when the power system needs it." Replace "energy" with "hydropower"
    Formula for calculating investment cost (Article 5.2)Original formula, definition of components (DF, re, rd, tax rate T)Modified formula (In terms of mathematical notation).
    Formula for calculating financial discount rate (Article 5.5)Original formula, definition of components (DF, re, rd, tax rate T)Modified formula (In terms of mathematical notation).
    Loan interest calculation formula (Article 5.5.a)Original formula, definition of components (DF, rd,F, DD, rd,D)Modified formula (In terms of mathematical notation).
    Dossier for approval of electricity generation price framework (Article 12.1.b)"Parameter table and documents for calculating electricity generation price framework as prescribed in Articles 4, 5, 6, 7 and 8 of this Circular;""Parameter table and documents for calculating electricity generation price framework as prescribed in Articles 4, 5, 6, 7, 8 and Article 8a of this Circular;" (Add Article 8a)
    Circular 54/2025/TT-BCT (Article 2) amends and supplements a number of articles of Circular No. 12/2025/TT-BCT:
    ◦ Article 2.1: Amending and supplementing Clause 3, Article 1 of Circular No. 12/2025/TT-BCT, adding the following non-applicable subjects: "Pumped storage hydropower plants; independently invested energy storage battery systems; power plants applying the electricity purchase price mechanism in documents of competent authorities."
    ◦ Article 2.2: Add clause 16 after clause 15, Article 2 of Circular No. 12/2025/TT-BCT, defining "P50 Expectation Level".
    ◦ Article 2.3: Amending and supplementing points b and c, Clause 2, Article 5 of Circular No. 12/2025/TT-BCT, related to the economic life of power plants and the method of calculating average electricity generation over many years.
    ◦ Article 2.4: Amending and supplementing Clause 2, Article 10 of Circular No. 12/2025/TT-BCT, related to determining the average annual delivered electricity and total project investment.
    ◦ Article 2.5: Supplement Clause 3, Article 22 of Circular No. 12/2025/TT-BCT, related to the construction of major repair cost ratios, other costs and labor costs for types of power plants that have not been regulated.
    ◦ Article 2.6: Amend the title of Table 2 in Appendix I of Circular No. 12/2025/TT-BCT, related to the ratio of operation and maintenance costs of solar and wind power plants.
    ### Repealed or expired
    There is no information about repeal or expiration in the "Amendments" provided.
    ### Overview of the impact of the difference
    ◦ Circular 25/2025/TT-BCT focuses on clarifying regulations on wind power price frameworks by region and area, in order to create more favorable conditions for the development of this type of energy.
    ◦ Circular 54/2025/TT-BCT has a broader scope of regulation, adding regulations related to flexible power plants, other power plants (such as small-capacity coal-fired thermal power plants or those using state capital), as well as adjusting definitions and calculation formulas. This addition helps the electricity generation price framework become more flexible and suitable for many different types of power plants, while solving problems arising in actual implementation.
    ◦ The amendment and supplementation of calculation formulas in Article 5 (Circular 54/2025/TT-BCT) may affect the calculation results of the electricity generation price framework, thereby affecting the revenue and profits of power plants.
    ◦ Clarifying the definition and scope of application (e.g. pumped storage hydropower plants, energy storage battery systems) helps avoid disputes and misunderstandings during implementation.
    ◦ Adding regulations on "other power plants" (Article 8a - Circular 54/2025/TT-BCT) can create more favorable conditions for these plants to participate in the electricity market, especially plants whose incentives or BOT contracts have expired.
    ◦ Amendments and supplements to Circular No. 12/2025/TT-BCT (related to the method of determining electricity generation service prices and electricity purchase contracts) also have an indirect impact on the electricity generation price framework, as this price framework is the basis for negotiating electricity prices in electricity purchase contracts.
    Posted date: 25-Nov-2025 25 2025 7:31PM VN
    Some amends and supplements of the

    Circular No. 54/2025/TT-BCT - Amendments to regulations on electricity generation price framework and electricity generation price calculation method

    within:
  • Circular No. 12/2025/TT-BCT⚠️ - New regulations on determining electricity price and model power purchase agreement
  • Effected from: 21-Nov-2025
    New additions
    ◦ Article 1.1 (Circular 54/2025/TT-BCT): Add point c after point b, Clause 1, Article 1 of Circular 09/2025/TT-BCT, clearly stating the application of the electricity generation price framework for small renewable energy power plants whose avoided cost price schedule has expired; power plants that have entered commercial operation and have expired the power purchase contract price; power plants whose BOT contract has expired and are handed over to the Government.
    ◦ Article 1.4 (Circular 54/2025/TT-BCT): Add clause 7 after clause 6, Article 2 of Circular 09/2025/TT-BCT, defining "Flexible power plant" (using RICE piston internal combustion engine or Aero-GT aerodynamic turbine).
    ◦ Article 1.8 (Circular 54/2025/TT-BCT): Add Article 8a after Article 8 of Circular 09/2025/TT-BCT, stipulating "Method of determining the electricity generation price framework applicable to other types of power plants", including small capacity coal-fired thermal power plants, coal-fired thermal power plants using 100% state capital, coal-fired thermal power plants using 100% domestic currency loans and small renewable energy power plants whose avoided cost price schedule has expired; power plants that have been commercially operated and whose power purchase contract price has expired; power plants whose BOT contract has expired and are handed over to the Government.
    ◦ Article 2.2 (Circular 54/2025/TT-BCT): Add clause 16 after clause 15, Article 2 of Circular 12/2025/TT-BCT, defining "Expected level P50" (average multi-year delivered electricity value of the power plant, with the probability that 50% of the actual delivered electricity of the power plant over many years will reach or be higher than this value).
    ◦ Article 2.5 (Circular 54/2025/TT-BCT): Supplementing Clause 3, Article 22 of Circular 12/2025/TT-BCT, stipulating that EVN shall develop or hire consultants to develop the ratio of major repair costs and other costs, the ratio of labor costs for types of power plants not specified in Appendix I of this Circular, proposing that the Ministry of Industry and Trade consider supplementing regulations accordingly.
    ### Changes
    FocusOld (Circular 12/2025/TT-BCT)New (Circular 54/2025/TT-BCT)
    Subjects not applicable (Article 2.1)"...small renewable energy plants applying the avoided cost tariff mechanism, power plants and generators providing ancillary services, power plants applying the electricity purchase price mechanism...""...small renewable energy plants applying the avoided cost tariff mechanism, power plants and generators providing ancillary services, independently invested energy storage battery systems, pumped storage hydropower plants; power plants applying the electricity purchase price mechanism..."
    Economic life (Article 2.3)Economic life is determined according to Annex I.Economic life is determined according to Annex I. For offshore wind power plants and flexible power plants, there are separate regulations.
    Average power generation (Article 2.3)Average power generation over many years is calculated according to the formula.Average power generation over many years is calculated according to the formula. For renewable energy power plants that use a combined energy storage battery system, and power plant projects that do not use public investment capital or foreign capital for public investment, there are specific regulations
    Average delivered electricity (Article 2.4)The seller and the buyer agreeThere is a specific division of determining the average delivered electricity and total investment according to public investment capital, foreign capital for public investment and other capital
    Title of Table 2 (Article 2.6)Does not refer to Article 10"... as prescribed in Article 10 of this Circular"
    Formula for Converted Capital Investment Cost (Article 1.5)No formulaAdd formula for calculating converted capital investment cost annually TC
    Formula for Financial Discount Rate i (Article 1.6)No formulaAdd formula for calculating Financial Discount Rate i
    Formula for Loan Interest Rate rd (Article 1.7)No formulaAdd formula for calculating Loan Interest Rate rd
    ### Abolished or expired
    There is no information on the abolition or expiration of the provisions in Circular 12/2025/TT-BCT by Circular 54/2025/TT-BCT.
    ### General comments
    Circular 54/2025/TT-BCT is an important amendment and supplement to Circular 12/2025/TT-BCT. It focuses on the following points:
    1. Clarifying the scope of regulation: Excluding some types of power plants from the scope of application of Circular 12/2025/TT-BCT, especially independent energy storage battery systems and pumped storage hydropower plants.
    2. Additional definitions: Added definitions of "Flexible Power Plant" and "P50 Expectation Level", clarifying the concepts in the electricity sector.
    3. Method of determining electricity prices: More specific regulations on the method of determining electricity price frameworks for different types of power plants, especially small renewable energy plants, power plants whose power purchase contracts have expired, and BOT power plants.
    4. Calculation formula adjustment: Add calculation formulas for converted investment cost, financial discount rate and loan interest rate, creating favorable conditions for determining electricity prices more accurately and transparently.
    5. State capital: Clearer regulations in determining average electricity based on capital sources (public investment capital, foreign capital outside public investment and other capital)
    Affect:
    ◦ For investors: The new regulations may affect the profitability of power projects, especially small renewable energy projects and BOT projects after the contract expires.
    ◦ For EVN: EVN will have additional legal basis to negotiate electricity prices with power plants, ensuring reasonable electricity prices in accordance with legal regulations.
    ◦ For consumers: Adjusting electricity prices may affect retail electricity prices for consumers, however, the ultimate goal is to ensure stable electricity supply and reasonable electricity prices.
    In summary, Circular 54/2025/TT-BCT is an important step in perfecting the legal framework on electricity prices, contributing to promoting the sustainable development of Vietnam's electricity industry.

    ai-luatvietnam-icon-24 Change analysis

    Found 644 posts Export list to Excel