Limits and regulations must know within the

Decree No. 35/2023/NĐ-CPstatus2 - Amendments to regulations on construction

Effective date: 20-Jun-2023
Limitations
These are regulations that set limits, thresholds or conditions that must not be exceeded to ensure compliance with the law in planning and construction.
The first is limiting the size of land lots to be applied to the simplified process, whereby, in order to be made a master plan instead of a detailed plan, the land plots must be less than 2 hectares for apartment projects, less than 10 hectares for factory projects, etc enterprises and industrial production establishments, or less than 5 hectares for the remaining cases.

Article 1, Clause 4b and Article 2, Clause 5b
Next, the document clearly stipulates the construction contract advance limit, clearly stating that the advance level must not exceed 30% of the contract value at the time of signing. If a higher advance is required, this case must be permitted by the investment decider.

Article 9, Clause 2
For confidential projects, there are regulations on the time for giving opinions for state secret projects, specifically the time for competent agencies to give written opinions must not exceed 15 days from the receipt of complete and valid dossiers.

Article 1, Clause 4b and Article 2, Clause 5b
Finally, an important limitation related to urban development is the regulation on areas not allowed to be subdivided and sold plots. Areas with high requirements for landscape architecture management, frontages of regional or higher roads, main landscape routes, central areas and around architectural highlights in urban areas will not be allowed to transfer land use rights in this form.

Article 4, Clause 4
Need to know
These are mandatory regulations, clearly stating the responsibilities, conditions and processes that must be followed in the process of carrying out activities related to planning and construction.
One of the foundation requirements is mandatory detailed planning before investment. All areas within the scope of urban development or functional zones must make detailed plans to concretize general planning and zoning planning, serve as a basis for project formulation, construction licensing and related works.

Article 1, Clause 3 and Article 2, Clause 4
However, for small-scale land lots, a simplified process can be applied, but the conditions for applying the master plan process must be met. These conditions include: the land plot is implemented by an investor, has a size within the permitted limits, and must be located in an area with an approved zoning plan or general plan.

Article 1, Clause 4 and Article 2, Clause 5
When making a plan according to the simplified process, the contents of a master plan must include the drawing of the general site plan and the architectural plan, clearly showing the location, scale of the work, the height of the foundation, construction boundaries, colors, land use norms in accordance with the regulations, etc at the same time, it ensures the connection of technical infrastructure and harmony with the surrounding space.

Article 1, Clause 4a and Article 2, Clause 5a
Regarding personal capacity, the document also clearly states regulations on the examination for the issuance of architectural practice certificates. Accordingly, individuals must take the test consisting of two parts, multiple-choice and multiple-choice tests, which can be conducted in person or online, and must comply with the technical and management requirements issued by the testing agency.

Article 3, Clause 1
In investment management, a core principle is to ensure conformity and compliance with planning levels. All urban development investment activities must ensure conformity with national, regional and provincial plannings, and strictly comply with the approved construction planning, urban planning as well as related programs and plans.

Article 4, Clause 2
In terms of post-investment management, it is necessary to master responsibility for handover and management in urban areas. The investor is responsible for handing over the infrastructure works and management rights to the recipient (usually the provincial People's Committee or an authorized unit), and at the same time is responsible for the quality, warranty and maintenance of the works that have not been handed over.

Article 4, Clause 8
Finally, in order for a building to be put into use, it is necessary to comply with the conditions for putting the building into use. The investor must complete the construction of technical and social infrastructure works in accordance with the approved plan, and at the same time must comply with regulations on fire prevention and fighting and environmental protection, including having an environmental license or having environmental registration if it is required.

Article 11, Clauses 5 and 7