Please sign in or register an account to view the full version.
Regulations on contractor capacity when implementing special construction projects
Decision No. 10/2008/QD-BXD⛔ dated June 25, 2008 of the Ministry of Construction promulgating the Regulation on contractors capability conditions for executing construction jobs, work items or works subject to special requirements
Posted: 5/8/2008 11:33:00 PM | Latest updated: 26/8/2013 8:40:06 PM (GMT+7) | Newsletter #:2029
Effective: 26-Jul-2008
Status: Expired on: 20-Aug-2009
A job, work item or construction project is considered to have special requirements when such work or work has complex techniques that are likely to cause unsafe incidents in construction. Jobs, work items and construction works with special requirements under this Regulation include: foundation treatment works using barret piles and bored piles, demolition of works with a height of 10 meters or more, installation of super-long and super-heavy equipment; work items are basements of high-rise buildings, underground parking lots, irrigation dams, hydropower plants with a height of over 25 meters, storage tanks, storage tanks, petrol, oil and gas pipelines; works that are buildings with a height of 20 floors or more or works with an aperture of 36 meters or more, tower works with a height of 50 meters or more, bridges with a main span length of 100 meters or more, arch bridges with a height of 50 meters or more, etc bridges with piers of 30 meters or more, underground works, works on the sea such as sea breakwaters, offshore drilling rigs. The decision takes effect 15 days after publication in the Official Gazette
Effective notes
This Circular shall be expired from August 20, 2009, replaced by Circular No. 22/2009/TT-BXD⛔ of 6/7/2009
Related document |
|
| Please sign in or register an account to view this information | |
Files attachment |