Posted date: 24-Jun-2026 9:00:02 AM VN
Some amends and supplements of the

Decree No. 178/2025/NĐ-CP⚠️ - New regulations on the formulation of types of planning

within:
  • Decree No. 217/2026/NĐ-CPstatus2 - New regulations on licensing and management of construction projects
  • Decree No. 212/2026/NĐ-CP - New regulations on conditions for capacity for construction activities
  • Decree No. 34/2026/NĐ-CP - Supplementing regulations on zoning planning and urban planning
  • Effected from: 01-Jul-2026
    New additions
    ◦ Article 1, Clause 2, Point k1 (Decree No. 34/2026/ND-CP): Supplementing regulations on the scope of general urban planning in provinces and cities based on conditions regarding area, population density, and the proportion of non-agricultural labor.
    ◦ Article 1, Clause 2, Point o (Decree No. 34/2026/ND-CP): Supplements regulations on the continued preparation, appraisal, and approval of zoning plans for urban areas, economic zones, and national tourist zones that already have approved general plans before July 1, 2025.
    ◦ Article 3 (Decree No. 34/2026/ND-CP): Amend Clause 1 of Article 3 to clarify that "The agency responsible for preparing the planning is the agency, organization, or investor responsible for preparing the planning task, urban and rural planning."
    ◦ Article 4 (Decree No. 34/2026/ND-CP): Amends the entirety of Article 7 regarding cases for establishing urban master plans, adds regulations on provinces where cities or special zones are planned, city master plans, and adjusts population density criteria for existing and expanded urban areas.
    ◦ Article 5 (Decree No. 34/2026/ND-CP): Amends the entirety of Article 8 regarding the cases for establishing zoning plans, and adds regulations on approved urban master plans, economic zone master plans, national tourism zone master plans, special zones, and provincial plans.
    ◦ Article 6 (Decree No. 34/2026/ND-CP): Amends point c, clause 1 and clause 2 of Article 9 regarding cases for preparing detailed planning, and adds regulations on functional areas with a size determined by the competent authority approving the detailed planning according to the provincial plan or the city's general plan.
    ◦ Article 7 (Decree No. 34/2026/ND-CP): Amends point a, clause 3 and point c, clause 6 of Article 10 on overall site planning, adds regulations on project types for investment projects to build factories, enterprises, industrial production facilities, educational and training facilities, and adjusts the time for approving overall site planning.
    ◦ Article 8 (Decree No. 34/2026/ND-CP): Amends Clause 1 of Article 12 regarding the submission of planning tasks for appraisal, and adds a provision on submitting documents through the national database information system on construction activities.
    ◦ Article 9 (Decree No. 34/2026/ND-CP): Amends Clause 1 of Article 14 on planning, clarifying the responsibilities of the planning organization.
    ◦ Article 10 (Decree No. 34/2026/ND-CP): Amends Clause 1 of Article 15 regarding the submission of planning appraisal, and adds a provision on submitting documents through the national database information system on construction activities.
    ◦ Article 11 (Decree No. 34/2026/ND-CP): Amends Clause 2 of Article 18 regarding maps for planning tasks, urban and rural planning, emphasizing the need for supplementary surveys of the current situation.
    ◦ Article 12 (Decree No. 34/2026/ND-CP): Amends, supplements, and repeals certain provisions of Article 21 on the management of funds for urban and rural planning activities, clarifying the responsibilities of provincial People's Committees and planning approval authorities.
    ◦ Article 13 (Decree No. 34/2026/ND-CP): Amend the title of Article 25 to “Regulations on continuing the preparation, appraisal, and approval of zoning plans for urban areas, economic zones, and national tourist zones that already have approved general plans before July 1, 2025”.
    ◦ Article 14 (Decree No. 34/2026/ND-CP): Replace the phrase “city directly under the central government” with the phrase “city” in some articles.
    ◦ Article 1 (Decree No. 212/2026/ND-CP): The scope of application is expanded to provide detailed regulations for Clause 3, Article 14 and Clause 7, Article 88 of the Construction Law No. 135/2025/QH15, including the construction, management, operation, exploitation, and use of the National Information System and Database on Construction Activities.
    ◦ Article 3 (Decree No. 212/2026/ND-CP): Supplements and clarifies in detail the titles related to construction activities such as Project Manager, Project Leader, Project Commander, Project Management Director, and administrative procedures.
    ◦ Article 4 (Decree No. 212/2026/ND-CP): Provides detailed regulations on the construction of the National Information System and Database on Construction Activities, including its components, operating address, and application platform.
    ◦ Article 6 (Decree No. 212/2026/ND-CP): Stipulates the principles for collecting and updating data to create a national database on construction activities, including data on urban and rural planning, construction investment projects, construction works, norms, construction prices, construction price index, and construction activity capacity.
    ◦ Article 9 (Decree No. 212/2026/ND-CP): Provides detailed regulations on urban and rural planning databases, including classification, general data, and detailed data.
    ◦ Article 10 (Decree No. 212/2026/ND-CP): Stipulates the identification codes for urban and rural planning.
    ◦ Article 11 (Decree No. 212/2026/ND-CP): Stipulates regulations on open data and master data of the Urban and Rural Planning Database.
    ◦ Article 12 (Decree No. 212/2026/ND-CP): Procedures for creating identification codes and establishing and updating data in the Urban and Rural Planning Database.
    ◦ Article 18 (Decree No. 212/2026/ND-CP): Stipulates the data on construction capacity of organizations and individuals participating in construction activities.
    ◦ Article 19 (Decree No. 212/2026/ND-CP): Stipulates the identification code for construction activity capacity.
    ◦ Article 20 (Decree No. 212/2026/ND-CP): Stipulates regulations on open data and master data of the Construction Activity Capacity Database.
    ◦ Article 21 (Decree No. 212/2026/ND-CP): Procedures for creating identification codes, establishing and updating the database of construction activity capacity.
    ◦ Article 27 (Decree No. 212/2026/ND-CP): Provides detailed regulations on construction practice certificates, including validity, specifications, and codes.
    ◦ Article 28 (Decree No. 212/2026/ND-CP): Stipulates the fields for granting professional practice certificates and the scope of operation.
    ◦ Article 29 (Decree No. 212/2026/ND-CP): Stipulates the issuance and revocation of professional practice certificates.
    ◦ Article 30 (Decree No. 212/2026/ND-CP): Stipulates the procedures for granting and revoking professional practice certificates.
    ◦ Article 31 (Decree No. 212/2026/ND-CP): Stipulates the authority to issue and revoke professional practice certificates.
    ◦ Article 33 (Decree No. 212/2026/ND-CP): Stipulates the general conditions for obtaining a professional practice certificate.
    ◦ Article 34 (Decree No. 212/2026/ND-CP): Stipulates the professional experience requirements for obtaining a construction survey practice certificate.
    ◦ Article 35 (Decree No. 212/2026/ND-CP): Stipulates the professional experience requirements for obtaining a certificate of practice in urban and rural planning.
    ◦ Article 36 (Decree No. 212/2026/ND-CP): Stipulates the professional experience requirements for obtaining a construction design practice certificate.
    ◦ Article 37 (Decree No. 212/2026/ND-CP): Stipulates the professional experience requirements for obtaining a construction supervision practice certificate.
    ◦ Article 38 (Decree No. 212/2026/ND-CP): Stipulates the professional experience requirements for practicing as a project management director for construction investment projects and a site manager.
    ◦ Article 39 (Decree No. 212/2026/ND-CP): Provides detailed regulations on the application dossier for professional practice certificates.
    ◦ Article 40 (Decree No. 212/2026/ND-CP): Stipulates the Council for the Examination and Granting of Professional Practice Certificates.
    ◦ Article 41 (Decree No. 212/2026/ND-CP): Stipulates the public disclosure of information on the construction capacity of organizations participating in construction activities.
    ◦ Article 42 (Decree No. 212/2026/ND-CP): Stipulates the principles for managing the activities of foreign contractors.
    ◦ Article 43 (Decree No. 212/2026/ND-CP): Stipulates the conditions for granting construction activity licenses to foreign contractors.
    ◦ Article 44 (Decree No. 212/2026/ND-CP): Provides detailed regulations on application dossiers and authority for granting construction activity licenses to foreign contractors.
    ◦ Article 45 (Decree No. 212/2026/ND-CP): Stipulates regulations on adjusting construction operating licenses for foreign contractors.
    ◦ Article 46 (Decree No. 212/2026/ND-CP): Stipulates the time limit and fees for granting and adjusting construction activity licenses for foreign contractors.
    ◦ Article 47 (Decree No. 212/2026/ND-CP): Stipulates the revocation of construction activity licenses.
    ◦ Article 48 (Decree No. 212/2026/ND-CP): Stipulates the rights and obligations of foreign contractors.
    ◦ Article 49 (Decree No. 212/2026/ND-CP): Stipulates the responsibilities of the investor or project owner or main contractor towards foreign contractors.
    ◦ Article 50 (Decree No. 212/2026/ND-CP): Stipulates the responsibilities of the Ministry of Construction in building and managing the Information System on Construction Activities.
    ◦ Article 51 (Decree No. 212/2026/ND-CP): Stipulates the responsibilities of the Ministry of Science and Technology in connecting the Information System on Construction Activities.
    ◦ Article 52 (Decree No. 212/2026/ND-CP): Stipulates the responsibilities of the Ministry of Public Security in ensuring data security and safety.
    ◦ Article 53 (Decree No. 212/2026/ND-CP): Stipulates the responsibility of the Ministry of Finance in determining the expenditure level for financial support activities.
    ◦ Article 54 (Decree No. 212/2026/ND-CP): Stipulates the responsibilities of ministries, ministerial-level agencies, People's Committees at all levels, and relevant agencies and units in providing, updating, connecting, and sharing construction activity data.
    ◦ Article 55 (Decree No. 212/2026/ND-CP): Stipulates transitional provisions related to the application of new regulations on the National Information System and Database on Construction Activities.
    ◦ Article 56 (Decree No. 212/2026/ND-CP): Stipulates regulations on handling violations, rewards, disciplinary actions, and related responsibilities when building and updating data into the National Database on Construction Activities.
    ◦ Article 1 (Decree No. 217/2026/ND-CP): The scope of application is expanded to provide detailed regulations on several articles of the Construction Law No. 135/2025/QH15, including regulations on technical standards and regulations, BIM application, assignment of investors, incentive policies, construction investment procedures, project classification, construction design, construction survey, project appraisal, investment decisions, project management organization, construction permits, and construction order management.
    ◦ Article 3 (Decree No. 217/2026/ND-CP): Provides more detailed explanations of terms related to construction investment projects, main works, works with significant impact on public safety and interests, linear construction works, central agencies, project preparation agencies, and project implementation time.
    ◦ Article 4 (Decree No. 217/2026/ND-CP): Specifies detailed regulations on the investment and construction procedures for projects, including the preparation, implementation, and completion phases, as well as cases where separate procedures apply to urgent, emergency, temporary, PPP projects, and turnkey contract projects.
    ◦ Article 5 (Decree No. 217/2026/ND-CP): Classification of construction investment projects according to purpose, function, and specialized nature of the works.
    ◦ Article 6 (Decree No. 217/2026/ND-CP): Stipulates the assignment of the investor and the conditions for agencies and organizations assigned to act as the investor.
    ◦ Article 7 (Decree No. 217/2026/ND-CP): Stipulates the principles for implementing administrative procedures in construction activities, including the use of electronic data and the requirement that state agencies do not request information already available in the national database.
    ◦ Article 8 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the application of Building Information Modeling (BIM) in construction activities and digital technology solutions, including the use of BIM in state management.
    ◦ Article 9 (Decree No. 217/2026/ND-CP): Stipulates the principles for applying standards in construction activities, including international, regional, foreign standards and basic standards.
    ◦ Article 10 (Decree No. 217/2026/ND-CP): Stipulates the procedures for conducting construction surveys.
    ◦ Article 11 (Decree No. 217/2026/ND-CP): Provides detailed regulations on construction survey tasks, including content and approval authority.
    ◦ Article 12 (Decree No. 217/2026/ND-CP): Provides detailed regulations on technical survey methods for construction.
    ◦ Article 13 (Decree No. 217/2026/ND-CP): Stipulates regulations on the management of construction survey work, including the responsibilities of contractors, investors, and the authority to suspend survey work.
    ◦ Article 14 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the content of the Construction Survey Report.
    ◦ Article 15 (Decree No. 217/2026/ND-CP): Stipulates the authority and responsibility for approving the Construction Survey Results Report.
    ◦ Article 16 (Decree No. 217/2026/ND-CP): General regulations on construction design, including types of design, number of design steps, content of each design step, and regulations on design adjustments.
    ◦ Article 17 (Decree No. 217/2026/ND-CP): Provides detailed regulations on construction design tasks, including content and approval authority.
    ◦ Article 18 (Decree No. 217/2026/ND-CP): Specifies detailed regulations on the format of construction design documents, including electronic documents.
    ◦ Article 19 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the content of preliminary design.
    ◦ Article 20 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the content of the basic design.
    ◦ Article 21 (Decree No. 217/2026/ND-CP): Specifies detailed regulations on the content of FEED design.
    ◦ Article 22 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the content of technical design.
    ◦ Article 23 (Decree No. 217/2026/ND-CP): Specifies detailed regulations on the content of construction drawings.
    ◦ Article 24 (Decree No. 217/2026/ND-CP): Provides detailed regulations on technical specifications.
    ◦ Article 25 (Decree No. 217/2026/ND-CP): Stipulates regulations on the management of construction design work.
    ◦ Article 26 (Decree No. 217/2026/ND-CP): Stipulates land use planning as a basis for preparing Feasibility Study Reports and Economic-Technical Reports.
    ◦ Article 27 (Decree No. 217/2026/ND-CP): Stipulates the preparation of Feasibility Study Reports and Economic-Technical Reports, including cases where only an Economic-Technical Report is required.
    ◦ Article 28 (Decree No. 217/2026/ND-CP): Stipulates the separation of project components and investment phasing.
    ◦ Article 29 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the content of the Feasibility Study Report.
    ◦ Article 30 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the content of the Economic-Technical Report.
    ◦ Article 31 (Decree No. 217/2026/ND-CP): Stipulates the appraisal of feasibility study reports and economic-technical reports by the investment decision-maker.
    ◦ Article 32 (Decree No. 217/2026/ND-CP): Stipulates the authority of specialized construction agencies to appraise feasibility study reports.
    ◦ Article 33 (Decree No. 217/2026/ND-CP): Stipulates other regulations on the authority of specialized construction agencies to appraise feasibility study reports.
    ◦ Article 34 (Decree No. 217/2026/ND-CP): Stipulates the establishment and operation of the Appraisal Council.
    ◦ Article 35 (Decree No. 217/2026/ND-CP): Specifies the detailed requirements for submitting the Feasibility Study Report for appraisal to the specialized construction agency and the Appraisal Council.
    ◦ Article 36 (Decree No. 217/2026/ND-CP): Stipulates detailed procedures for appraising feasibility study reports by specialized construction agencies and appraisal councils.
    ◦ Article 37 (Decree No. 217/2026/ND-CP): Stipulates the time frame for appraising the Feasibility Study Report by specialized construction agencies and the Appraisal Council.
    ◦ Article 38 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the content and results of the appraisal of the Feasibility Study Report by specialized agencies on construction and the Appraisal Council.
    ◦ Article 39 (Decree No. 217/2026/ND-CP): Provides detailed regulations on project approval and investment decisions for construction projects.
    ◦ Article 40 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the adjustment of construction investment projects.
    ◦ Article 41 (Decree No. 217/2026/ND-CP): Stipulates the appraisal of construction design implemented after the project has been approved.
    ◦ Article 42 (Decree No. 217/2026/ND-CP): Stipulates the approval of construction design to be implemented after the project has been approved.
    ◦ Article 43 (Decree No. 217/2026/ND-CP): Stipulates regulations on adjusting construction design implemented after the project has been approved.
    ◦ Article 44 (Decree No. 217/2026/ND-CP): Stipulates the forms of management for construction investment projects.
    ◦ Article 45 (Decree No. 217/2026/ND-CP): Stipulates the organization and operation of the Investment and Construction Project Management Board.
    ◦ Article 46 (Decree No. 217/2026/ND-CP): Stipulates the hiring of consultants for the management of construction investment projects.
    ◦ Article 47 (Decree No. 217/2026/ND-CP): Stipulates regulations on project management boards under direct supervision.
    ◦ Article 48 (Decree No. 217/2026/ND-CP): Stipulates the investor's self-management of the project.
    ◦ Article 49 (Decree No. 217/2026/ND-CP): Stipulates the main contents of a construction permit.
    ◦ Article 50 (Decree No. 217/2026/ND-CP): Stipulates the conditions for granting new construction permits.
    ◦ Article 51 (Decree No. 217/2026/ND-CP): Stipulates the conditions for granting permits for construction, repair, renovation, and relocation of structures.
    ◦ Article 52 (Decree No. 217/2026/ND-CP): Stipulates the conditions for granting temporary construction permits.
    ◦ Article 53 (Decree No. 217/2026/ND-CP): Stipulates the authority to issue construction permits.
    ◦ Article 54 (Decree No. 217/2026/ND-CP): Stipulates the procedures and content for considering the issuance, adjustment, and extension of construction permits.
    ◦ Article 55 (Decree No. 217/2026/ND-CP): Stipulates the types of legal land documents required for granting construction permits.
    ◦ Article 56 (Decree No. 217/2026/ND-CP): General regulations on application dossiers for construction permits.
    ◦ Article 57 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the application dossier for a new construction permit.
    ◦ Article 58 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the application dossier for phased construction permits.
    ◦ Article 59 (Decree No. 217/2026/ND-CP): Specifies detailed regulations on the application dossier for a construction permit for the entire project or group of projects.
    ◦ Article 60 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the application dossier for a construction permit for individual residential buildings.
    ◦ Article 61 (Decree No. 217/2026/ND-CP): Stipulates detailed regulations on the application dossier for permits to repair, renovate, and relocate structures.
    ◦ Article 62 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the application dossier for a temporary construction permit.
    ◦ Article 63 (Decree No. 217/2026/ND-CP): Stipulates regulations on adjusting and extending construction permits.
    ◦ Article 64 (Decree No. 217/2026/ND-CP): Regulations on the re-issuance of construction permits.
    ◦ Article 65 (Decree No. 217/2026/ND-CP): Stipulates the revocation and cancellation of construction permits.
    ◦ Article 66 (Decree No. 217/2026/ND-CP): Stipulates regulations on public disclosure of construction permits.
    ◦ Article 67 (Decree No. 217/2026/ND-CP): Stipulates regulations on the management of construction order.
    ◦ Article 68 (Decree No. 217/2026/ND-CP): Stipulates regulations on the management of investment in construction projects and works that require the protection of state secrets.
    ◦ Article 69 (Decree No. 217/2026/ND-CP): Stipulates regulations on the management of investment in emergency construction projects and works.
    ◦ Article 70 (Decree No. 217/2026/ND-CP): Stipulates regulations on the management of investment in the construction of urgent projects and works.
    ◦ Article 71 (Decree No. 217/2026/ND-CP): Stipulates regulations on special public investment projects and works.
    ◦ Article 72 (Decree No. 217/2026/ND-CP): Regulations on temporary construction projects and works.
    ◦ Article 73 (Decree No. 217/2026/ND-CP): Stipulates the responsibilities of ministries, sectors, and localities in implementing the Decree.
    ◦ Article 74 (Decree No. 217/2026/ND-CP): Amending, supplementing, and repealing certain articles of Decree No. 105/2025/ND-CP dated March 3, 2025, of the Government detailing certain articles and measures for the implementation of the Law on Fire Prevention, Firefighting, and Rescue.
    ◦ Article 75 (Decree No. 217/2026/ND-CP): Stipulates the effective date and the documents that are repealed or have ceased to be in effect.
    ◦ Article 76 (Decree No. 217/2026/ND-CP): Stipulates transitional provisions.
    Changes
    FocusOld (Decree No. 178/2025/ND-CP)New (Decree No. 34/2026/ND-CP)
    Scope of Application (Article 1, Clause 1)This Decree provides detailed regulations on certain articles of the Law on Urban and Rural Planning No. 47/2024/QH15.This Decree provides detailed regulations on certain articles of the Law on Urban and Rural Planning No. 47/2024/QH15, as amended and supplemented by Law No. 144/2025QH15.
    Scope of Application (Article 1, Clause 1, Point b)Point a, Clause 5, Article 3, regarding cases of establishing zoning plans based on management and development requirements in centrally-governed cities.Point a, Clause 5, Article 3, regarding cases of establishing zoning plans for areas within approved urban master plans, economic zone master plans, or national tourism zone master plans, with specific area sizes and management and development requirements.
    Scope of Application (Article 1, Clause 1, Point c)Point b, Clause 5, Article 3, regarding cases of establishing zoning plans based on area size, management requirements, and development for functional areas other than national economic zones and national tourist zones.Point b, Clause 5, Article 3, regarding cases of establishing zoning plans based on area size, management requirements, and development for functional areas other than national economic zones, national tourist zones, and special zones.
    Scope of Application (Article 1, Clause 1, Point o)Clause 5 of Article 59 on continuing the preparation, appraisal, approval, review, and adjustment of zoning plans in accordance with the law on urban planning and the law on construction for Type III and Type IV cities, economic zones, and national tourist areas that have had their general plans approved before the effective date of the Law on Urban and Rural Planning.Clause 5 of Article 4 of Law No. 144/2025/QH15 on continuing the preparation, appraisal, and approval of zoning plans for cities, economic zones, and national tourist areas that have had their general plans approved before July 1, 2025.
    Explanation of Terms (Article 3, Clause 1)The planning organization is the agency or organization responsible for preparing the planning task, urban and rural planning as stipulated in Article 17 of the Law on Urban and Rural Planning, in accordance with the two-level local government organization.The planning organization is the agency, organization, or investor responsible for preparing the planning task, urban and rural planning as stipulated in Article 17 of the Law on Urban and Rural Planning, in accordance with the two-level local government organization.
    Conditions for Consulting Organizations (Article 5, Clause 4)Consulting organizations participating in urban and rural planning must possess a construction activity capacity certificate as prescribed by the law on construction, including consulting on planning task preparation and consulting on planning. The capacity certificate of the consulting organization is classified into Grade I, Grade II, and Grade III and is issued according to the provisions of the law on construction.Consulting organizations participating in urban and rural planning must meet the capacity requirements as prescribed by the Law on Urban and Rural Planning and the law on construction.
    Cases for establishing a general urban plan (Article 7)General urban plans, as stipulated in Clause 4, Article 3 of the Law on Urban and Rural Planning, are established for the following planning scopes: a) Cities directly under the central government; b) Special zones belonging to the urban system as oriented in the overall urban and rural system plan or regional plan or provincial plan; c) Existing urban areas comprising an independent ward or several adjacent wards, belonging to the urban system as oriented in the overall urban and rural system plan or regional plan or provincial plan, with a planning scope determined in the decision approving the urban and rural planning task; d) Expanded urban areas include existing urban areas and adjacent communes, belonging to the urban system as oriented in the overall urban and rural system plan or regional plan or provincial plan, with a planning scope defined in the decision approving the urban and rural planning task and meeting the conditions of a minimum area of 50 km2, a minimum population density of 500 people/km2 and a minimum non-agricultural labor rate of 30%; e) New urban areas belonging to the urban system as oriented in the overall urban and rural system plan or regional plan or provincial plan; with a minimum planning scope of 30 km2 and defined in the decision approving the urban and rural planning task.The scope of general urban planning as stipulated in Clause 4, Article 3 and Point b, Clause 1, Article 21 of the Law on Urban and Rural Planning is defined as follows: a) Cities; a) The province plans to establish a city within the urban system according to the overall urban and rural system plan, or regional plan, or provincial plan; b) A special zone is an urban area or special zone oriented towards the urban system according to the overall urban and rural system plan, or regional plan, or provincial plan, or city master plan; c) Comprising several adjacent wards or a single independent ward (without surrounding wards), identified as belonging to the urban system according to the orientation in the overall urban and rural system plan, or regional plan, or provincial plan, or city master plan; d) Comprising several adjacent wards or an independent ward (without surrounding wards) and the scope of an adjacent commune, identified as belonging to the urban system according to the orientation in the overall urban and rural system plan or regional plan or provincial plan or city master plan, while meeting the conditions of a minimum area of 50 km2, a minimum population density of 300 people/km2 and a minimum non-agricultural labor rate of 30%; e) Having a planning scope at least according to the administrative boundaries of a commune-level unit, identified as a new urban area belonging to the urban system according to the orientation in the overall urban and rural system plan or regional plan or provincial plan or city master plan.
    Cases for establishing zoning plans (Article 8)1. Urban areas as stipulated in point a, clause 5, Article 3 of the Law on Urban and Rural Planning are determined based on the spatial structure in the general urban plan and decided by the Provincial People's Committee in the plan for implementing the general plan. 2. Functional areas as stipulated in point b, clause 5, Article 3 of the Law on Urban and Rural Planning with a minimum scale of 200 hectares or areas determined by the Provincial People's Committee with objectives and requirements for investment in the construction of technical infrastructure according to the law on construction and project management.1. Areas belonging to the general city plan or the general urban plan for a new city expected to be established; 1. Areas within the remaining urban master plan, economic zone master plan, or national tourism zone master plan shall have sub-area plans established when determined in the implementation plan of the master plan, based on the spatial structure of the approved master plan and decided by the provincial People's Committee. 2. Functional zones as stipulated in point b, clause 5, Article 3 of the Law on Urban and Rural Planning shall have areas determined by the provincial People's Committee based on development management requirements or determined with specific objectives and requirements for investment in technical infrastructure construction in accordance with the law on construction. 3. Areas determined based on the master plan or provincial plan (for special zones within the province, not oriented towards urbanization) for the implementation of investment projects in technical infrastructure construction in accordance with the law on construction.
    Cases for detailed planning (Article 9, Clause 1, Point c)Functional areas with a scale of less than 200 hectares, except for cases specified in Clause 2 of this Article.Functional areas with a scale determined by the competent authority approving the detailed plan according to the provincial plan or the city's general plan for the implementation of investment and construction projects in accordance with the law on construction, except for cases specified in Clause 2 of this Article.
    Overall site plan (Article 10, Clause 3, Point a)With a land use scale of less than 2 hectares for investment projects to build apartment buildings or apartment complexes; or with a land use scale of less than 10 hectares for investment projects to build factories, enterprises, industrial production facilities, or technical infrastructure works not along a line as determined by the general plan or specialized technical infrastructure plan or provincial plan or approved technical or specialized plan; or with a land use scale of less than 5 hectares for other cases;With a land use scale of less than 2 hectares for investment projects to build apartment buildings; or with a land use scale of less than 10 hectares for investment projects to build factories, enterprises, industrial production facilities, educational and training facilities, and non-linear technical infrastructure works as determined by the general plan or specialized technical infrastructure plan or provincial plan or approved technical or specialized plan; or with a land use scale of less than 5 hectares for all other cases;
    Master Plan (Article 10, Clause 6, Point c)The authority approving the detailed plan or the delegated/authorized agency shall review and approve the master plan, ensuring compliance with the requirements in Clause 5 of this Article. The time limit for approving the detailed plan or for the delegated/authorized agency to review and approve the master plan shall not exceed 15 days from the date of receiving complete documents from the planning organization.The authority approving the detailed plan or the delegated/authorized agency shall review and issue the approval document for the master plan, ensuring compliance with the requirements in Clauses 3 and 4 of this Article. The time limit for approving the detailed plan or for the delegated/authorized agency to review and approve the master plan shall not exceed 15 days from the date of receiving complete documents from the planning organization.
    Submission of Planning Task for Appraisal (Article 12, Clause 1)The planning organization submits the urban and rural planning task dossier to the planning appraisal agency.The planning organization sends the document along with the urban and rural planning task dossier via the national database system on construction activities to the appraisal agency for appraisal. If the urban and rural planning task dossier has not been submitted for appraisal as stipulated in this clause before January 1, 2026, after approval, the planning organization is responsible for sending the appraised and approved dossier via the national database system on construction activities.
    Planning (Article 14, Clause 1)The agency organizing the planning or the agency assigned according to Clause 10, Article 17 of the Law on Urban and Rural Planning shall select a qualified consulting organization as prescribed in Article 5 of this Decree to carry out the planning; during the urban and rural planning process, opinions must be solicited as prescribed in Article 37 of the Law on Urban and Rural Planning.The agency organizing the planning shall select a qualified consulting organization as prescribed in Article 5 of this Decree to carry out the planning; during the urban and rural planning process, opinions must be solicited as prescribed in Article 37 of the Law on Urban and Rural Planning.
    Planning Appraisal Process (Article 15, Clause 1)The planning organization shall submit the urban and rural planning task dossier to the planning approval authority for approval after it has been completed according to the appraisal report of the appraisal agency.The planning organization shall send the document along with the urban and rural planning dossier through the national database system on construction activities to the appraisal agency for appraisal. If the urban and rural planning dossier has not been submitted for appraisal as stipulated in this clause before January 1, 2026, after approval, the planning organization shall be responsible for sending the appraised and approved dossier through the national database system on construction activities.
    Maps for Planning Task Preparation (Article 18, Clause 2)The information and data of topographic maps must meet the requirements for preparing planning tasks and planning, in accordance with each type and level of planning. If the topographic map does not reflect the current situation at the time of planning, the competent authority approving the planning task, urban and rural planning shall decide to conduct supplementary topographic surveys according to the procedures stipulated in the law on surveying and mapping.The information and data of topographic maps must meet the requirements for preparing planning tasks and planning, in accordance with each type and level of planning. If the topographic map does not reflect the current situation at the time of planning, the competent authority approving the planning task, urban and rural planning shall decide to conduct supplementary surveys of the current situation, ensuring technical requirements as prescribed in the law on surveying and mapping.
    Financial Management (Article 21, Clause 2)The Ministry of Construction shall prepare and issue a list of planning projects and annual budget plans from the state budget for urban and rural planning organized by the Ministry of Construction and other plans assigned by the Prime Minister; approve cost estimates and adjusted cost estimates (if any) for urban and rural planning activities.Clause 2 is repealed.
    Financial Management (Article 21, Clause 3)People's Committees at all levels with the authority to approve planning shall prepare and issue a list of planning projects and annual budget plans from the state budget for urban and rural planning within their administrative jurisdiction, except for plans organized by the Ministry of Construction; and approve cost estimates and adjusted cost estimates (if any) for urban and rural planning activities.Provincial People's Committees (for plans under the approval authority of the Prime Minister) and the planning approval level are responsible for issuing annual budget plans and approving cost estimates for urban and rural planning activities. Provincial People's Committees may delegate or authorize subordinate agencies to approve cost estimates for urban and rural planning activities in accordance with the provisions of the law on the organization of local government. In cases where the planning task, urban planning, and rural planning are undertaken by the investor as the planning organization, that organization is responsible for approving the cost estimate for preparing the planning task, urban planning, and rural planning.
    Transitional provisions in Clause 1, Article 59 (Article 25)The agency organizing the preparation of the comprehensive plan shall compile and approve the results of the preparation and approval of the sub-area plan after the general plan has been approved; develop a plan that identifies functional areas requiring the preparation or adjustment of sub-area plans based on the approved general plan and report to the level that approved the general plan for implementation within 2 years as stipulated in the Law on Urban and Rural Planning.Regulations on the continued preparation, appraisal, and approval of sub-area plans for cities, economic zones, and national tourist areas that already have approved general plans before July 1, 2025.
    Amendments and additions to certain articles, clauses, and points of Decree No. 175/2024/ND-CP (Article 28, point n)Article 81 is amended and supplemented as follows: “Article 81. Professional experience requirements for obtaining a certificate of practice in urban and rural planning. Individuals are considered for a certificate of practice in urban and rural planning when they meet the general conditions stipulated in Article 79 of this Decree and the professional experience requirements corresponding to the following certificate categories: 1. Category I: Having served as the project manager or lead in the preparation of one urban and rural plan approved by the Prime Minister or two urban and rural plans (including one general plan or zoning plan) approved by the Provincial People's Committee. 2. Category II: Having served as the project manager or lead in the preparation of one urban and rural plan approved by the Provincial People's Committee or two urban and rural plans approved by the Commune People's Committee. 3. Category II III: Has participated in the preparation of urban and rural planning in the professional field of 02 approved urban and rural plans.”Article 81 is completely repealed and replaced with more detailed regulations on professional experience requirements for obtaining a certificate of practice in urban and rural planning according to categories I, II, and III, with adjustments regarding the number and types of plans completed.
    Amendments and additions to certain articles, clauses, and points of Decree No. 175/2024/ND-CP (Article 28, point p)Article 103 is amended and supplemented as follows: “Article 103. Capacity requirements for urban and rural planning organizations. Urban and rural planning organizations must meet the corresponding capacity requirements for each category as follows: 1. Category I: a) Have at least two individuals holding the positions of project manager and project leader for each specialized field of urban and rural planning, architecture, transportation, electricity, and water supply and drainage of urban and rural planning, holding Category I professional certificates relevant to their respective fields; b) Have prepared at least one urban and rural plan under their authority and approved by the Prime Minister, or two urban and rural plans (including at least one general plan) under their authority and approved by the Provincial People's Committee. 2. Category II: a) Individuals holding the positions of project manager and project leader in specialized fields of urban and rural planning, architecture, and transportation a) Individuals in urban and rural planning, including those in the fields of transportation, electricity, and water supply and drainage, must possess professional certificates of rank II or higher, relevant to their area of expertise; b) Have prepared at least one urban and rural plan within their jurisdiction and have had it approved by the Provincial People's Committee. 3. Rank III: Individuals holding the position of project manager or leader in specialized fields of urban and rural planning, architecture, transportation, electricity, and water supply and drainage must possess professional certificates of rank III or higher, relevant to their area of expertise.”Article 103 on the capacity requirements of organizations preparing urban and rural plans has been amended and supplemented, with adjustments to the requirements for each capacity rank I, II, and III, particularly regarding the number of individuals with professional certificates and practical experience.
    Effective Date (Article 29, Clause 2)The following legal documents are hereby repealed: a) Government Decree No. 37/2010/ND-CP dated April 7, 2010, on the preparation, appraisal, approval, and management of urban planning; b) Government Decree No. 44/2015/ND-CP dated May 6, 2015, detailing certain aspects of construction planning; c) Government Decree No. 72/2019/ND-CP dated August 30, 2019, amending and supplementing a number of articles of Decree No. 37/2010/ND-CP dated April 7, 2010, on the preparation, appraisal, approval, and management of urban planning and Decree No. 44/2015/ND-CP dated May 6, 2015, detailing a number of contents on construction planning.Repealing a number of articles and clauses of Decrees No. 105/2025/ND-CP, 140/2025/ND-CP, 144/2025/ND-CP, 178/2025/ND-CP, and 15/2021/ND-CP. The specific details of this repeal are outlined in points a, b, c, d, and e of Clause 3, Article 75 of Decree No. 217/2026/ND-CP.
    Effective Date (Article 29, Clause 3)Articles 1 and 2 of the regulations on detailed planning under the simplified procedure in Decree No. 35/2023/ND-CP dated June 20, 2023 of the Government amending and supplementing a number of articles of Decrees under the state management of the Ministry of Construction are hereby repealed.Clause 3 of Article 75 of Decree No. 217/2026/ND-CP is hereby repealed.
    Effective Date (Decree No. 212/2026/ND-CP)There are no regulations regarding the effective date related to these documents.This Decree takes effect from July 1, 2026. Government Decree No. 111/2024/ND-CP dated September 6, 2024, regulating the National Information System and Database on Construction Activities, ceases to be effective from the date this Decree takes effect. The following regulations cease to be effective from the date this Decree takes effect: a) Clause 1, Article 4, Clause 3, Article 10, and Clause 4, Article 45 of Government Decree No. 144/2025/ND-CP dated June 12, 2025, regulating the delegation of authority and decentralization in the state management field of the Ministry of Construction; b) Points a, m, n, and r of Clause 1, Article 28 of Government Decree No. 178/2025/ND-CP dated July 1, 2025, detailing some provisions of the Law on Urban and Rural Planning; c) Article 22 of Government Decree No. 14/2026/ND-CP dated January 13, 2026, amending and supplementing some articles of decrees to reduce and simplify administrative procedures related to production and business activities under the management of the Ministry of Construction.
    Transitional Provisions (Decree No. 212/2026/ND-CP)There are no regulations on transitional provisions related to these contents.The transitional provisions regulate the handling of administrative procedures whose results were issued before the effective date of this Decree but whose data has not yet been updated, the issuance of professional practice certificates under the old regulations, and the continued use of professional practice certificates issued under the 2014 Construction Law.
    Scope of Application (Decree No. 217/2026/ND-CP)There are no detailed regulations on the Construction Law No. 135/2025/QH15.This Decree provides detailed regulations on several articles of the Construction Law No. 135/2025/QH15, including regulations on: specialized construction agencies; technical standards and regulations, BIM application; conditions for being an investor; incentive policies in construction activities; construction investment procedures; project classification; construction design; construction survey; project appraisal; investment decision; project management organization; construction permits; construction order management; special projects and works.
    Article 7 (Decree No. 217/2026/ND-CP)There are no detailed regulations on the principles for implementing administrative procedures.Detailed regulations on the principles for implementing administrative procedures include: responsibilities of organizations and individuals requesting the procedure; electronic documents; the state agency's refusal to request information already available in the national database; responsibility for providing information and data to the National Construction Activities Information System and Database; and responsibilities of agencies and individuals authorized to resolve administrative procedures.
    Article 8 (Decree No. 217/2026/ND-CP)There are no detailed regulations on the application of Building Information Modeling (BIM) and digital technology solutions.Detailed regulations on the application of BIM in construction activities, including scope, content, information requirements, the use of BIM to support state management, and the responsibilities of the Ministry of Construction and other ministries managing specialized construction projects.
    Article 9 (Decree No. 217/2026/ND-CP)There are no detailed regulations on the principles of applying standards in construction activities.Regulations on the principles of applying standards in construction activities, including standards applicable to projects, the application of international, regional, foreign standards, and basic standards.
    Articles 10 to 15 (Decree No. 217/2026/ND-CP)There are no detailed regulations on construction surveys.Detailed regulations on the procedures for conducting construction surveys, construction survey tasks, construction survey technical plans, management of construction survey work, content of the Construction Survey Results Report, and approval of the Construction Survey Results Report.
    Articles 16 to 25 (Decree No. 217/2026/ND-CP)There are no detailed regulations on construction design.Detailed regulations on general construction design, construction design tasks, construction design document specifications, content of various types of design (preliminary, basic, FEED, technical, construction drawings), technical guidelines, and management of construction design work.
    Articles 26 to 38 (Decree No. 217/2026/ND-CP)There are no detailed regulations on project appraisal and investment decisions for construction.Detailed regulations on land use planning as a basis for preparing the Feasibility Study Report and Economic-Technical Report; content of the Feasibility Study Report and Economic-Technical Report; appraisal of the Feasibility Study Report and Economic-Technical Report by the investment decision-maker; authority of specialized construction agencies to appraise the Feasibility Study Report; other regulations on the authority to appraise the Feasibility Study Report; appraisal council; appraisal submission documents; appraisal procedures; appraisal time; content and results of appraisal; project approval, investment decision for construction; adjustment of construction investment projects.
    Articles 41 to 48 (Decree No. 217/2026/ND-CP)There are no detailed regulations on the management of construction design implementation after project approval and the organization of construction investment project management.Detailed regulations on the appraisal of construction design implementation after project approval; approval of construction design implementation after project approval; adjustment of construction design implementation after project approval; forms of construction investment project management; organization and operation of the Construction Investment Project Management Board; hiring consultants for construction investment project management; Project Management Board under direct supervision; investor self-management of the project.
    Articles 49 to 66 (Decree No. 217/2026/ND-CP)There are no detailed regulations on construction permits and construction order management.Detailed regulations on the main contents of construction permits; conditions for granting new construction permits, repair, renovation, relocation, and temporary permits; authority to grant construction permits; procedures and content for reviewing, granting, adjusting, extending, and re-granting construction permits; types of legal land documents for granting construction permits; application dossiers for construction permits for different types of constructions; adjustment, extension, re-granting, revocation, cancellation of construction permits and public disclosure of construction permits.
    Article 67 (Decree No. 217/2026/ND-CP)There are no detailed regulations on construction order management.Detailed regulations on construction order management, including management content, responsibilities of government levels, and measures for handling violations.
    Articles 68 to 72 (Decree No. 217/2026/ND-CP)There are no detailed regulations on the construction of special projects.Detailed regulations on the management of investment in construction projects requiring state secrecy; emergency construction projects; urgent projects; special public investment projects; and temporary projects.
    Article 74 (Decree No. 217/2026/ND-CP)There are no provisions for amending or supplementing other Decrees.Amending and supplementing some articles and clauses of Decree No. 105/2025/ND-CP dated March 3, 2025 of the Government detailing some articles and measures for implementing the Law on Fire Prevention, Fighting and Rescue.
    Effective Date (Decree No. 217/2026/ND-CP)There are no regulations regarding the effective date.This Decree takes effect from July 1, 2026. Government Decree No. 175/2024/ND-CP dated December 30, 2024, detailing some articles and measures for implementing the Law on Construction regarding construction management, ceases to be effective from the date this Decree takes effect. Some articles and clauses of other related Decrees are repealed.
    ### Repealed or Expired
    ◦ Article 29, Clause 2 (Decree No. 178/2025/ND-CP): The following legal documents are repealed: a) Government Decree No. 37/2010/ND-CP dated April 7, 2010 on the preparation, appraisal, approval and management of urban planning; b) Government Decree No. 44/2015/ND-CP dated May 6, 2015 detailing some contents on construction planning; c) Government Decree No. 72/2019/ND-CP dated August 30, 2019, amending and supplementing a number of articles of Decree No. 37/2010/ND-CP dated April 7, 2010, on the preparation, appraisal, approval, and management of urban planning and Decree No. 44/2015/ND-CP dated May 6, 2015, detailing a number of contents on construction planning.
    ◦ Article 29, Clause 3 (Decree No. 178/2025/ND-CP): Articles 1 and 2 stipulating detailed planning according to the simplified procedure in Decree No. 35/2023/ND-CP dated June 20, 2023 of the Government amending and supplementing a number of articles of Decrees under the state management of the Ministry of Construction are hereby repealed.
    ◦ Article 75, Clause 2 (Decree No. 217/2026/ND-CP): Decree No. 175/2024/ND-CP dated December 30, 2024 of the Government detailing a number of articles and measures for implementing the Law on Construction regarding the management of construction activities shall cease to be in effect from the date this Decree comes into effect.
    ◦ Article 75, Clause 3, Point a (Decree No. 217/2026/ND-CP): Articles 4, 5, 6 and 7, Clause 3 of Article 29 of Decree No. 140/2025/ND-CP dated June 12, 2025 of the Government stipulating the delineation of authority of two levels of local government in the field of state management of the Ministry of Construction are hereby repealed.
    ◦ Article 75, Clause 3, Point b (Decree No. 217/2026/ND-CP): Clause 1 of Article 4, Article 10, Article 11, and Appendix III issued with Government Decree No. 144/2025/ND-CP dated June 12, 2025, regulating the delegation of authority and decentralization in the state management field of the Ministry of Construction, are hereby repealed.
    ◦ Article 75, Clause 3, Point d (Decree No. 217/2026/ND-CP): Article 24 of Decree No. 14/2026/ND-CP dated January 13, 2026 of the Government amending and supplementing a number of articles of decrees to reduce and simplify administrative procedures related to production and business activities under the management of the Ministry of Construction is hereby repealed.
    ◦ Article 75, Clause 3, Point d (Decree No. 217/2026/ND-CP): Clause 1 of Article 28 of Decree No. 178/2025/ND-CP dated July 1, 2025 of the Government detailing a number of articles of the Law on Urban and Rural Planning is hereby repealed.
    ### Overall assessment of the impact of differences
    The amendments, particularly Decree No. 34/2026/ND-CP, Decree No. 212/2026/ND-CP, and Decree No. 217/2026/ND-CP, have had a significant impact on Decree No. 178/2025/ND-CP. Specifically:
    1. Clarifying and detailing regulations: The amended documents have supplemented and clarified many regulations already present in Decree 178/2025/ND-CP. For example, the amendments to the provisions on cases for preparing urban master plans and zoning plans (Articles 4 and 5 of Decree 34/2026/ND-CP) help to more clearly define the scope and conditions of application.
    2. Updating Regulations According to the New Construction Law: Decree No. 212/2026/ND-CP and Decree No. 217/2026/ND-CP are typical examples of updating regulations to conform with Construction Law No. 135/2025/QH15. This includes adding regulations on the National Information System and Database on Construction Activities, professional certificates, construction permits for foreign contractors, and the entire process of managing construction investment projects and granting construction permits.
    3. Integrating Digital Technology and Data: The introduction of regulations on the National Information System and Database on Construction Activities (Decree 212/2026/ND-CP) demonstrates a trend towards modernizing management processes by utilizing digital technology, identification codes, and centralized databases to increase transparency and efficiency.
    4. Changes in administrative procedures: Several administrative procedures have been amended, particularly the integration of submitting applications and receiving results through the national database information system on construction activities (e.g., Articles 8 and 10 of Decree 34/2026/ND-CP). This may change the way management agencies and regulated entities operate.
    5. Repealing and invalidating old regulations: The repeal of decrees or specific provisions within old decrees indicates a change in the legal system, centralizing and updating regulations to conform with the new law. This means that the old regulations are no longer in effect and the amended documents will replace and regulate them.
    6. Enhancing clarity and detail: Revisions often aim to clarify general or incomplete points in the original text, ensuring feasibility and comprehensibility during implementation.
    Overall, the revised texts have made the legal framework for urban and rural planning, as well as construction activities, more detailed, modern, and consistent with the new provisions of the Law.

    ai-luatvietnam-icon-24 Change analysis

    Found 644 posts Export list to Excel