Layout & language BEN
Sign in
Posted date: 23-Oct-2025 3:24:52 PM VN
Limits and regulations must know within the

Circular No. 16/2025/TT-BCT⛔ - New regulations on registration to participate in the electricity market from February 1, 2025

Effective date: 01-Feb-2025
Limitations
◦ Offer price limit (Article 15): The offer price of power generators in the electricity market must be between the bid floor price and the bid ceiling price, with separate regulations for thermal and hydroelectric power plants.
◦ Limits for adjusting the capacity of multi-purpose strategic hydropower plants (Article 61): The scope of adjusting the declared output of multi-purpose strategic hydropower plants shall not exceed ±25% of the total installed capacity of multi-purpose strategic hydropower plants in the power system.
### Need to know
◦ Scope of regulation (Article 1): This Circular regulates the operation of the competitive wholesale electricity market, including registration for participation, planning, bidding mechanism, mobilization schedule, electricity metering, price determination, payment, information disclosure, supervision, and responsibilities of participating units.
◦ Subjects of application (Article 2): This Circular applies to electricity wholesalers, power generators, power system and market operators, power transmission, Vietnam Electricity Group, and large electricity users participating in the direct electricity purchase and sale mechanism.
◦ Responsibility of power generation units to participate in the electricity market (Article 4): Power generation units are obliged to complete the registration procedure to directly participate in the electricity market for power plants with a design capacity greater than 30 MW connected to the national power system, or with a design capacity of 10 MW or more whose power purchase and sale contracts at avoided costs have expired, or renewable energy power plants participating in the direct power purchase and sale mechanism through the national power grid.
◦ Responsibility for participating in the electricity market for wholesale electricity buyers (Article 5): Wholesale electricity buyers are responsible for registering to participate in the electricity market in case of purchasing electricity at metering locations within the scope of the wholesale electricity market.
◦ Time of participation in the electricity market (Article 6): The time of participation in the electricity market of power generation units and wholesale electricity buyers is specifically regulated based on the commercial operation date of the power plant or the date of delivery of electricity from the transmission grid.
◦ Registration to participate in the electricity market (Article 7): Power generation units and power wholesale units must meet the requirements on licenses, equipment systems, and power purchase contracts, then submit registration dossiers to the Power System and Electricity Market Operator 07 working days before the latest date of participation in the electricity market.
◦ Information of electricity market participants (Article 9): Electricity market participants are responsible for registering general information about the unit, meter, connection point with the Electricity System Operator and the electricity market and updating when there are changes.
◦ Mobilizing power plants that have not directly participated in the electricity market (Article 11): Power plants that must participate in the market according to regulations, but have not completed registration, or do not have a Power Purchase Agreement, do not have an official electricity price, or the electricity price has expired, the Power System and Electricity Market Operator shall not mobilize, except in special cases.
◦ Principles of electricity market operation (Article 12): The principles of electricity market operation are publicity, transparency, equality, fair competition, respect for the right to freely choose partners, and State regulation to ensure sustainable development, safe, stable, reliable and efficient electricity supply.
◦ Trading day, trading cycle, dispatching cycle, operating principles (Article 13): The trading day is calculated from 00:00 to 24:00 of the solar day. The trading cycle is 30 minutes, calculated from the starting time of each 30 minutes of the trading day. The dispatching cycle is 30 minutes, calculated from the starting time of each 30 minutes of the trading day. During the process of participating in the electricity market, the units are responsible for complying with the regulations, complying with the dispatching orders and instructions of the Power System Operator and the electricity market.
◦ Power trading node (Article 14): Power generating units and power purchasing units must register with the Power System Operator and the electricity market for the unit's trading node during the registration process for participation in the electricity market.
◦ Determining contracted electricity output (Article 17): The power generation unit and the power purchase unit are responsible for negotiating, reaching consensus and specifying in the power purchase contract the contracted electricity output or the rate of electricity output paid according to the contract price.
◦ Next year's operation plan (Article 19): The power system and electricity market operator is responsible for making the next year's electricity market operation plan, including selecting the best new power plant, calculating the market capacity price, water value and optimal water level, limiting the bid price, determining the electricity market ceiling price plan, and calculating the planned output.
◦ Load forecasting for next year's operational planning (Article 21): The power system and electricity market operator is responsible for load forecasting to serve next year's operational planning.
◦ Ancillary services for the next year's operation plan (Article 22): The power system and electricity market operator is responsible for determining the needs for various types of ancillary services.
◦ Classification of baseload, midload and peak load plants for the coming year (Article 23): The power system and electricity market operator is responsible for using the market simulation model to determine the average annual load factor of power plants.
◦ Determining the ceiling price of thermal power plant bids (Article 24): The power system and electricity market operator is responsible for calculating and adjusting the ceiling price of thermal power plant bids.
◦ Determining the electricity market ceiling price applicable to power generation units (Article 25): The power system and electricity market operator is responsible for calculating the electricity market ceiling price options.
◦ Selection of the Best New Power Plant (Article 26): The electricity purchasing unit is responsible for making a list of power plants that meet the criteria and providing the power purchase contract data of these power plants or the data agreed upon with the power generation unit to the Power System and Electricity Market Operator to determine the Best New Power Plant.
◦ Principles for determining market capacity prices (Article 27): Ensure that the best new power plant recovers full generation costs when participating in the electricity market.
◦ Procedure for determining market capacity price (Article 28): The power system and electricity market operator is responsible for determining market capacity price.
◦ Determining the minimum annual and minimum monthly contracted electricity output for thermal power plants with power purchase contracts with Vietnam Electricity Group (Article 29): The power system and electricity market operator is responsible for calculating the minimum annual and minimum monthly contracted electricity output of the thermal power plant.
◦ Load forecasting for next month's operation planning (Article 33): The power system and electricity market operator is responsible for load forecasting to serve next month's operation planning.
◦ Calculation of water value (Article 34): The power system and electricity market operator is responsible for calculating water value for the weeks of the following month.
◦ Adjustment of ceiling price of thermal power plant bids (Article 36): The power system and electricity market operator is responsible for calculating and adjusting the ceiling price of thermal power plant bids in the next month according to the method prescribed in Article 24 of this Circular, including updating factors affecting the variable price of month M according to the method agreed upon in the power purchase contract.
◦ Secondary frequency control service in the next month's operation plan (Article 37): The power system and electricity market operator is responsible for determining the demand for secondary frequency control services of the power system in the next month.
◦ Adjustment of monthly contracted electricity output of power plants with power purchase contracts with Vietnam Electricity Group (Article 38): Monthly contracted electricity output of power plants shall be adjusted in case the plant's maintenance and repair schedule in month M+1 is changed.
◦ Information for the operation of the electricity market for the next day (Article 47): Before 10:00 a.m. on D-1, the Electricity System and Electricity Market Operator shall be responsible for determining, calculating and announcing information on the load forecast chart, expected mobilized capacity, expected total gas output, results of the assessment of the ability to ensure short-term electricity supply...
◦ Checking the validity of the bid (Article 52): Before 11:00 on D-1, the Power System and Electricity Market Operator is responsible for checking the validity of the bids received from the bidding units.
◦ Data used for next day mobilization scheduling (Article 54): The power system and electricity market operator is responsible for using the data to create next day mobilization scheduling.
◦ Announcement of the next day's mobilization schedule (Article 56): Before 4:00 p.m. every day, the Power System and Electricity Market Operator is responsible for announcing the information in the next day's mobilization schedule.
◦ Data for scheduling mobilization for the next trading cycle (Article 60): The power system and electricity market operator is responsible for using the data to schedule mobilization for the next trading cycle.
◦ Making a schedule for mobilizing the next trading cycle (Article 62): The power system and electricity market operator is responsible for making a schedule for mobilizing the next trading cycle for generating units according to the binding scheduling method and the non-binding scheduling method.
◦ Announcement of the mobilization schedule for the next trading cycle (Article 63): The electricity system and electricity market operator is responsible for announcing the mobilization schedule for the next trading cycle 10 minutes before the trading cycle.
◦ Real-time power system dispatch (Article 64): The power system and electricity market operator is responsible for operating the power system in real time based on the announced mobilization schedule for the next trading cycle and in compliance with regulations on real-time power system operation.
◦ Electricity market intervention (Article 66): The electricity system and electricity market operator may intervene in the electricity market in the following cases.
◦ Handling exported electricity in mobilization scheduling (Article 69): Before 10:00 on day D-1, the Power system and electricity market operator is responsible for announcing the expected exported electricity output in each trading cycle of day D.
◦ Boundary metering locations in the wholesale electricity market (Article 72): In the wholesale electricity market, boundary metering locations are used to determine the scope of wholesale electricity trading, at which there must be a main and backup electricity metering system to accurately measure the amount of electricity bought and sold, delivered and received between units.
◦ Responsibility for collecting and managing metering data in the electricity market (Article 74): The electricity system and electricity market operator is responsible for fully collecting metering data at the metering locations of the delivery boundary.
◦ Method and procedure for collecting metering data (Article 76): Reading and sending meter data to the Power System and Electricity Market Operator must be done daily.
◦ Determining market electricity prices applicable to power generation units (Article 81): After transaction day D, the Power System and Electricity Market Operator is responsible for making a schedule for calculating market electricity prices.
◦ Full electricity market price applicable to power generation units (Article 82): The full electricity market price applicable to power generation units in the trading cycle is calculated by the sum of the market electricity price and the market capacity price.
◦ Market electricity price applied to wholesale electricity purchasing units (Article 84): Market electricity price applied to wholesale electricity purchasing units in transaction cycle i is calculated according to the following formula.
◦ Market capacity price applied to wholesale electricity purchasers (Article 85): Market capacity price applied to wholesale electricity purchasers in transaction cycle i is calculated according to the following formula.
◦ Full electricity market price applicable to wholesale electricity buyers (Article 86): The full electricity market price applicable to wholesale electricity buyers in trading cycle i is determined according to the following formula.
◦ Determining the power output of a power plant for payment in the electricity market (Article 88): The power system and electricity market operator is responsible for calculating the power output portions of the power plant in the transaction cycle for payment in the electricity market, including.
◦ Adjustment of power plant's electricity output for payment in the electricity market (Article 89): Power output for payment in the market is adjusted in the following cases:
◦ Market electricity payments (Article 90): The power system and electricity market operator is responsible for calculating the total market electricity payments of the power plant (excluding wind power, solar power, biomass power, small hydropower) in the payment cycle.
◦ Payment according to market capacity price (Article 91): The power system and electricity market operator is responsible for calculating the market capacity payment for the power plant during the payment cycle.
◦ Payment according to market capacity price (Article 92): The power system and electricity market operator is responsible for calculating the market capacity payment for the power plant in the payment cycle.
◦ Software for electricity market operations (Article 113): Software for electricity market operations includes: Market simulation software; Water value calculation software; Mobilization scheduling software; Payment calculation software; Other software serving electricity market operations.
◦ Requirements for software for electricity market operations (Article 114): Ensure accuracy, reliability, security and meet the standards established by the Electricity System and Electricity Market Operator. Have full technical instructions and accompanying operating procedures.
◦ Electricity market information system (Article 117): The electricity market information system includes the following basic components: Hardware and software systems serving the management, exchange and security of electricity market information. Database and storage systems. Electronic information portal serving the electricity market, including both internal electronic information pages and public electronic information pages.
◦ Supervision of electricity market operation (Article 124): The State management agency of electricity is responsible for regularly and periodically monitoring the operation of the electricity market through synthesizing and evaluating the operation results based on collected data and actual inspections at the members participating in the electricity market. Members participating in the electricity market are responsible for coordinating with the State management agency of electricity in monitoring the electricity market; detecting and reporting to the State management agency of electricity any arising issues or acts showing signs of violations during the operation of the electricity market.
◦ Providing data for monitoring the operation of the electricity market (Article 126): The unit operating the electricity system and the electricity market is responsible for providing the State management agency of electricity with information and data on the operation of the electricity market, including data and results of calculations of the annual, monthly and weekly electricity market operation plan; data and results of the operation of the electricity market for the next day, next cycle, real time and payment calculations; other necessary information and data as required by the State management agency of electricity to monitor the electricity market. Members participating in the electricity market are responsible for providing information and data related to the unit's operations in the electricity market as required by the State management agency of electricity to monitor the electricity market.

ai-luatvietnam-icon-24 Risk assessment

Found 442 posts Export list to Excel