Layout & language AEN
Sign in
Posted date: 24-Jun-2026 9:04:19 AM VN
Some amends and supplements of the

Decree No. 105/2025/NĐ-CP⚠️ - New regulations on fire prevention and fighting, applied from July 1, 2025

within:
  • Decree No. 217/2026/NĐ-CPstatus2 - New regulations on licensing and management of construction projects
  • Decree No. 16/2026/NĐ-CPstatus2 - Rail transport business conditions as of January 14, 2026
  • Effected from: 01-Jul-2026
    New additions
    From Decree No. 16/2026/ND-CP
    ◦ Article 1, Clause 1: Supplementing the scope of regulation related to the Railway Law No. 95/2025/QH15, including provisions on:
    ◦ Clause 8 of Article 15 concerns naming, commissioning, decommissioning, and dismantling of railway lines and railway stations.
    ◦ Clause 9 of Article 16 regarding the roadmap and responsibilities for handling railway-to-railway and railway-to-road intersections is inconsistent with the provisions of the Railway Law.
    ◦ Point d, Clause 2, Article 19 on the preparation, appraisal, approval, publication, implementation, evaluation, and adjustment of railway line and railway station planning.
    ◦ Clause 3 of Article 38 concerning research, application, and transfer of railway technology.
    ◦ Clause 4 of Article 42 concerns the management and maintenance of railway infrastructure shared with roads and technical infrastructure connected to and used in common with railway infrastructure.
    ◦ Clause 6 of Article 44 on the protection of railway infrastructure.
    ◦ Clause 8 of Article 46 on the conditions for conducting railway infrastructure business; rights and obligations of enterprises operating railway infrastructure.
    ◦ Clause 7 of Article 49 concerns the conditions for conducting railway transport business; the rights and obligations of railway transport businesses, passengers, and transport hirers; and the exemption and reduction of passenger transport fares for social policy beneficiaries.
    ◦ Clause 6 of Article 50 concerns transportation for special missions, social welfare, and the transportation of hazardous goods.
    ◦ Point b, Clause 4, Article 56 on the management and use of land allocated for railways.
    ◦ Article 3, Clause 1: The term "Guard Post" is defined as a place where assigned personnel are stationed 24/7 at locations hazardous to railway traffic safety to take timely action to ensure traffic safety.
    ◦ Article 3, paragraph 2: The term "Guard" is defined as the activity of a person or device when a train is about to pass through locations that pose a danger to railway traffic safety, using signals and other measures to warn road users not to cross the railway tracks when a train is approaching the guarded location.
    ◦ Article 3, Clause 3: The definition of "Hazardous location for railway traffic safety" is defined as a railway crossing with a road that does not comply with the regulations in Article 16 of the Railway Law and where railway traffic accidents frequently occur or are likely to occur.
    ◦ Article 3, Clause 4: Defines the term "Dangerous Goods" as goods containing hazardous substances or items that, when transported by rail, have the potential to endanger human life, health, the environment, safety, and national security.
    ◦ Article 3, Clause 5: The term "Land Area" is defined as an adjacent land area defined by a certain distance as stipulated in this Decree, intended to protect railway infrastructure.
    ◦ Article 4, Clause 1, Point d: Supplement the main content of the railway line and railway station planning to include "Solutions for organizing the implementation of the plan".
    ◦ Article 6, Clause 1, Point d: Principles for naming and renaming railway lines and stations: "The name of a railway line must not be identical to the name of another railway line on the Vietnamese railway system. The names of railway stations on the same railway line must not be identical. The names of railway lines and stations must be consistent with the national cultural identity, customs and traditions of the locality where the line and station are located, and of the country; ensuring they are concise, easy to understand, and easy to remember."
    ◦ Article 6, Clause 2: Regulations regarding the naming of newly constructed railway lines and stations shall be determined during the planning phase of the railway line and station or during the preparation of the project's pre-feasibility study report or feasibility study report.
    ◦ Article 6, Clause 3, Point a: Authority to name and rename existing railway lines and stations: "The Ministry of Construction decides on the naming and renaming of national railway lines and stations based on proposals from project investors or owners of the works;"
    ◦ Article 6, Clause 3, Point b: Authority to name and rename existing railway lines and stations: "The Provincial People's Council shall decide on the naming and renaming of local railway lines and stations under its management based on the proposal of the project investor or the owner of the works;"
    ◦ Article 6, Clause 3, Point c: Authority to name and rename existing railway lines and stations: "The investor decides to name and rename the specialized railway lines and stations that they invest in."
    ◦ Article 7, Clause 2: Regulations on the assessment and certification of system safety for high-speed railways, Class I railways, and newly constructed or upgraded urban railways before commissioning, in accordance with the law on railways.
    ◦ Article 8, paragraph 1: The term "Suspension of operation of railway line, section, or station" means not organizing train operations on a railway line, section, or station for a specified period of time.
    ◦ Article 9, Clause 1, Point a: Regulations on cases for considering the dismantling of railway lines, sections of lines, and stations: "The operation of railway lines, sections of lines, and stations affects national defense secrets, security, sovereignty, and national interests;"
    ◦ Article 9, Clause 3, Point a: Authority to dismantle railway lines, sections, and stations: "The Minister of Construction shall decide on the dismantling of national railway lines, sections, and stations upon the request of the agency, organization, or enterprise assigned to manage national railway infrastructure assets;"
    ◦ Article 9, Clause 3, Point b: Authority to dismantle railway lines, sections, and stations: "The Chairman of the Provincial People's Committee shall decide on the dismantling of local railway lines, sections, and stations upon the request of the agency, organization, or enterprise assigned to manage local railway infrastructure assets;"
    ◦ Article 9, Clause 3, Point c: Authority to dismantle railway lines, sections, and stations: "The owner of a specialized railway infrastructure shall decide on the dismantling of railway lines, sections, and stations on the railways under their investment and management."
    ◦ Article 9, Clause 4: Requires the consensus of the Ministry of National Defense before deciding to dismantle a railway line, section of line, or station if the railway line, section of line, or station affects national defense secrets, security, sovereignty, or national interests.
    ◦ Article 13, paragraph 2, point d: Regulations concerning the scope of aerial protection for railway lines when no applicable technical standards or regulations exist, including details for high-speed railways, classes I, II, III, IV, narrow gauge railways, and urban railways with different power supply methods.
    ◦ Article 13, Clause 3, Points a and b: Specifies the detailed scope of protection on both sides of railway tracks according to the unexcavated and unembanked roadbeds, and excavated and embanked roadbeds, including high-speed railways, urban railways, and other railways.
    ◦ Article 13, paragraph 4: Stipulates the handling of existing railway lines that are currently in operation but do not meet the protection zone requirements during renovation and upgrading.
    ◦ Article 13, Clause 5: Requires the construction of protective fences at the outer edge of the protected area of railway structures on both sides in the horizontal direction for railway lines as stipulated in Clause 2, Article 44 of the Railway Law.
    ◦ Article 13, Clause 6: Details for determining the scope of railway protection shall be implemented in accordance with Clause 1 of Appendix I issued together with this Decree.
    ◦ Article 14, paragraph 1: Stipulates that the airspace protection zone for railway bridges extends from the highest point of the bridge structure upwards.
    ◦ Article 14, paragraph 2: The scope of protection for railway bridges along the longitudinal direction is defined within the length of the bridge, calculated from the end points of the two bridge abutments.
    ◦ Article 14, Clause 4, Points a, b, c, d: Specifies the detailed scope of horizontal protection for railway bridges in the following cases: viaducts in urban areas, bridges over rivers, canals, and streams in urban areas, viaducts outside urban areas, and bridges over rivers outside urban areas.
    ◦ Article 14, Clause 5: Stipulates that the protected area beneath a railway bridge is 2 meters from the lowest point of the bridge span structure downwards.
    ◦ Article 14, paragraph 6: Stipulates the handling of existing railway bridges currently in operation that do not meet the protection zone requirements during renovation and upgrading.
    ◦ Article 14, Clause 7: Regulations concerning the safety of railway structures and the safety of personnel during maintenance and repair of railway bridges if the protected area beneath the bridge girders does not meet the regulations.
    ◦ Article 15, paragraph 1: Stipulates the scope of protection for railway tunnels outside urban areas.
    ◦ Article 15, paragraph 2: Stipulates the scope of protection for railway tunnels in urban areas, including areas where no other construction is permitted and areas where other construction is controlled, with details on the cross-sections of circular tunnels, rectangular tunnels, underground stations, open/semi-tunnels, and other cross-sectional shapes.
    ◦ Article 15, paragraph 3: Requirements for technical solutions when constructing works, exploiting resources, and carrying out other activities in the construction control zone of other works to avoid affecting the stability, lifespan, and safety of railway tunnels.
    ◦ Article 15, paragraph 4: Regulations for handling existing railway tunnels that are currently in operation but do not meet the regulations when renovated or upgraded.
    ◦ Article 15, paragraph 5: Requires compliance with the law on the management of urban underground construction space for railway tunnels in urban areas.
    ◦ Article 16, paragraph 1, points a and b: Stipulates the scope of air protection for railway stations and depots.
    ◦ Article 16, paragraph 2: Stipulates the horizontal protection zone of the station and depot.
    ◦ Article 16, paragraph 3: Stipulates the scope of protection for station and depot facilities when they are part of a multi-purpose complex.
    ◦ Article 16, Clause 4: Stipulates the scope of protection for ventilation, water supply and drainage, fire and explosion prevention, rescue, emergency response, access roads to and from the station, and other auxiliary structures and equipment.
    ◦ Article 17, paragraph 1, point d: Regulations on handling existing railway communication and signal lines and poles that do not meet regulations during renovation and upgrading.
    ◦ Article 17, paragraph 1, point d: Details for determining the scope of protection for railway communication and signal lines and poles shall be implemented according to the provisions of paragraph 4 of Appendix I.
    ◦ Article 17, paragraph 2: Requires compliance with electricity laws regarding the protection of railway power lines and structures.
    ◦ Article 18, paragraphs 1 and 2: Stipulates the scope of protection for railway embankment structures according to the cases of erosion control embankments and water flow regulation embankments.
    ◦ Article 18, paragraph 3: Regulations concerning the scope of protection for railway embankments when overlapping with the scope of protection for dikes and embankments.
    ◦ Article 19, Clause 1: Stipulates the width of the railway safety corridor, measured from the outer edge of the protected area on both sides of the railway, according to technical standards and regulations.
    ◦ Article 19, Clause 2, Points a and b: Specifies the detailed width of the railway safety corridor when there are no applicable technical standards or regulations for high-speed railways, surface urban railways, and other railways.
    ◦ Article 19, paragraph 3: Stipulates the height of the railway safety corridor.
    ◦ Article 19, paragraph 4: Details for determining the railway safety corridor shall be implemented in accordance with the provisions of paragraph 1 of Appendix I.
    ◦ Article 19, Clause 5, Points a, b, c: Stipulates regulations on railway traffic safety corridors at level crossings, including the visibility of railway and road vehicle drivers.
    ◦ Article 19, Clause 6, Points a, b, c: Regulations concerning railway safety corridors in cases where railways run near or adjacent to road infrastructure, including boundary demarcation, overlapping cases, and requirements for new construction.
    ◦ Article 19, paragraph 7: Requires ensuring a safe railway traffic corridor in cases where railways and roads intersect at different levels.
    ◦ Article 19, Clause 8, Points a, b, c: Regulations concerning railway safety corridors in cases where railways run near inland waterway protection corridors and maritime protection zones, including regulations on boundary demarcation and handling of overlaps.
    ◦ Article 19, Clause 9, Points a, b, c: Regulations concerning railway safety corridors in cases where railways run near high-voltage power lines, including requirements for distance, boundary demarcation, and handling of overlaps.
    ◦ Article 19, Clause 10, Points a and b: Regulations on railway safety corridors in cases where railways run near important national security-related structures.
    ◦ Article 19, Clause 11, Points a and b: Regulations on railway safety corridors in cases where the railway runs near historical and cultural relics and scenic spots.
    ◦ Article 20, paragraphs 1, 2, and 3: Stipulates the content of land management for railways, including management records and boundary determination.
    ◦ Article 21, paragraphs 1, 2, and 3: Stipulates the determination of land boundaries for railways, including requirements for updating information, coordinating with local authorities, and marking boundaries.
    ◦ Article 22, paragraphs 1, 2, 3, 4: Specifies detailed regulations on land management records for railways, including planning records, cadastral records, boundary markers, land acquisition, and compensation.
    ◦ Article 23, paragraphs 1, 2, 3, 4: Stipulates regulations on land use within the railway land area, including cases where land use is permitted and not permitted.
    ◦ Article 23, paragraph 5, points a and b: Regulations on handling existing structures within the land designated for railways.
    ◦ Article 24, paragraphs 1, 2, 3, 4: Stipulates regulations on the construction of structures within the land designated for railways, including essential structures shared with railways, and requirements for technical solutions and construction permits.
    ◦ Article 25, paragraphs 1 and 2: Stipulates regulations on the construction of works, exploitation of resources, and other activities in the vicinity of land designated for railways, including safety distances and the responsibilities of the investor.
    ◦ Article 26, paragraphs 2, 3, 4, 5: Stipulates the conditions for conducting business in railway infrastructure, including requirements for specialized departments and the experience of the person in charge.
    ◦ Article 27, paragraphs 1 and 2: Stipulates the rights and obligations of enterprises operating railway infrastructure.
    ◦ Article 28, paragraphs 1, 2, 3, 4: Stipulates the requirements and general principles for handling railway-to-rail crossings, railway-to-road crossings that do not comply with the provisions of the Railway Law, and unauthorized crossings.
    ◦ Article 29, paragraphs 1 and 2: Stipulates the responsibilities of owners of dedicated railways and relevant agencies when dedicated railways intersect with national railways before the construction of grade-separated interchanges.
    ◦ Article 30, paragraphs 1, 2, 3, 4: Explains and regulates "Locations of danger to railway traffic safety", including accident black spots, potential accident spots, and dangerous level crossings.
    ◦ Article 31, Clauses 1, 2, 3, and 4: Stipulates the responsibilities of provincial People's Committees, specialized state management agencies in railway transport, and organizations assigned to manage railway infrastructure assets in managing hazardous locations for railway traffic safety.
    ◦ Article 32, paragraphs 1, 2, 3, 4, 5: Stipulates measures to ensure traffic safety at locations hazardous to railway traffic safety, including the responsibilities of relevant agencies and forces.
    ◦ Article 33, paragraphs 1, 2, and 3: Stipulates the funding sources for managing, reducing, and eliminating hazardous locations for railway traffic safety and measures to ensure traffic safety at hazardous locations.
    ◦ Article 34, paragraphs 1 and 2: Stipulates the procedures for handling railway-to-railway and railway-to-road intersections that are inconsistent with the provisions of the Railway Law.
    ◦ Article 35, paragraphs 2, 3, and 4: Stipulates the conditions for conducting railway transport business, including requirements for specialized departments and the experience of the person in charge.
    ◦ Article 36, paragraphs 1 and 2: Stipulates the rights and obligations of railway transport businesses.
    ◦ Article 37, paragraphs 1 and 2: Regulations concerning the rights and obligations of passengers.
    ◦ Article 38, paragraphs 1 and 2: Stipulates the rights and obligations of the transport hirer.
    ◦ Article 39, paragraphs 1, 2, and 3: Stipulates the categories of people eligible for discounted train tickets and the discount rates for each social policy beneficiary group.
    ◦ Article 40, paragraphs 1, 2, and 3: Specifies detailed regulations on ticket discounts for social policy beneficiaries, including those who have rendered meritorious service to the revolution, people with disabilities, the elderly, and other eligible individuals as stipulated by law.
    ◦ Article 41, paragraphs 1, 2, and 3: Other regulations on ticket discounts, including expanding the scope of ticket exemptions and discounts, the simultaneous application of discount schemes, and the obligation to provide supporting information.
    ◦ Article 42, paragraphs 1, 2, and 3: Regulations concerning transportation for special missions and social welfare, including procedures for requesting and ordering, and responsibilities for supporting costs.
    ◦ Article 43, paragraphs 1, 2, 3, and 4: Stipulates the principles for supporting transportation services for special missions and social welfare, including compensation for reasonable costs and sources of funding.
    ◦ Article 44, paragraphs 1, 2, 3, and 4: Regulations on providing transportation support for special missions and social welfare, including procedures for requesting, planning, estimating, and settling expenses.
    ◦ Article 45, paragraphs 1, 2, and 3: Stipulates the classification of hazardous goods into 9 categories and groups, including regulations on packaging and containers for hazardous goods that have not been cleaned.
    ◦ Article 46, paragraphs 1 and 2: Regulations on the list of dangerous goods and hazard numbers, accompanied by Appendices III and IV.
    ◦ Article 47, paragraphs 1 and 2: Stipulates requirements for packaging, containers, and packing of hazardous goods, including minimum requirements when no applicable standards or technical regulations exist.
    ◦ Article 48, paragraphs 1, 2, and 3: Regulations concerning product labels, hazard symbols, and hazard warnings, including the design and placement of affixing as per Appendix V.
    ◦ Article 49, paragraphs 1, 2, 3, 4, 5: Stipulates requirements for the transport of dangerous goods, including compliance with the law, train design, train operation, training of transport personnel, requirements for railcars, and responsibility for cleaning and removing hazard markings.
    ◦ Article 50, paragraphs 1, 2, 3, 4, 5, 6: Specifies detailed regulations on training for the safety of dangerous goods, including the target audience, content, duration, evaluation of results, and record keeping.
    ◦ Article 51, paragraphs 1, 2, 3, 4: Stipulates the responsibilities of organizations and individuals for loading, unloading, and storing hazardous goods, including compliance with guidelines, avoiding the mixing of goods that may interact with each other, establishing vessels for transporting hazardous goods, and regulations when there is no escort.
    ◦ Article 52, paragraphs 1 and 2: Stipulates the responsibilities of persons directly involved in the transportation of dangerous goods, including implementing instructions, handling incidents, and documenting the goods.
    ◦ Article 53, paragraphs 1, 2, 3, 4, 5, 6, 7, 8: Stipulates the responsibilities of the consignor of dangerous goods, including packaging, labeling, documentation, notification of requirements, training, assigning escorts, providing protective equipment, and purchasing insurance.
    ◦ Article 54, paragraphs 1, 2, 3, 4, 5, 6, 7, 8: Stipulates the responsibilities of enterprises transporting dangerous goods, including arranging suitable wagons, inspecting goods, complying with notices, displaying danger symbols, cleaning wagons, transporting goods with proper procedures, and organizing training.
    ◦ Article 55: Stipulates the responsibilities of People's Committees at all levels when incidents occur during the transportation of hazardous goods on railways.
    ◦ Article 56: Regulations on the transportation of dangerous goods in special cases, for special purposes, and for social welfare.
    ◦ Article 57, paragraphs 1, 2, 3, and 4: Stipulates the responsibilities of the Ministry of Construction in managing and protecting railway infrastructure and handling level crossings.
    ◦ Article 58, paragraphs 1, 2, and 3: Stipulates the responsibilities of the Ministry of Finance in allocating funds and providing transportation support.
    ◦ Article 59, paragraphs 1 and 2: Stipulates the responsibility of the Ministry of National Defence in providing opinions on the dismantling of railway lines and the transportation of hazardous goods.
    ◦ Article 60, paragraphs 1, 2, 3, and 4: Stipulates the responsibilities of the Ministry of Public Security in inspecting, controlling, handling violations, preventing crime, and coordinating propaganda efforts.
    ◦ Article 61, paragraphs 1, 2, 3, 4, 5, 6, 7, 8, 9: Stipulates the responsibilities of provincial People's Committees in managing and protecting land designated for railways, handling unauthorized crossings, reporting to the Government, and related issues.
    ◦ Article 62, paragraphs 1, 2, 3, 4, 5, 6: Stipulates the responsibilities of the People's Committee at the commune level in managing and protecting land designated for railways, handling unauthorized crossings, and coordinating with relevant agencies.
    ◦ Article 63, paragraphs 1, 2, 3, 4, 5: Stipulates the responsibilities of agencies, organizations, and enterprises managing railway infrastructure assets in land use, reporting management results, handling intersections, and reporting to the Government.
    ◦ Article 64, Clauses 1, 2, 3, 4, 5, 6, 7: Amend, supplement, and repeal certain articles of relevant Decrees, including Decree No. 37/2019/ND-CP, Decree No. 56/2019/ND-CP, Decree No. 32/2019/ND-CP, and repeal certain articles of Decree No. 105/2025/ND-CP, Decree No. 140/2025/ND-CP, Decree No. 144/2025/ND-CP, Decree No. 14/2026/ND-CP, Decree No. 85/2024/ND-CP, and Decree No. 65/2018/ND-CP.
    ◦ Article 66, Clause 1: Stipulates a 24-month period for railway infrastructure and railway transport businesses to fully meet the business conditions as prescribed in this Decree.
    ◦ Article 66, Clause 2: For railway infrastructure construction investment projects approved before the effective date of this Decree, the determination of the scope of protection for railway works and railway traffic safety corridors shall continue to be implemented according to the provisions of Decree No. 56/2018/ND-CP.
    Decree No. 217/2026/ND-CP (Amending and supplementing Decree No. 105/2025/ND-CP)
    ◦ Article 1, Clause 1, Point 1: Adds a provision on "specialized construction agencies" to Clause 19, Article 3 of the Construction Law No. 135/2025/QH15.
    ◦ Article 1, paragraph 2: Expands the scope of application to include foreign organizations and individuals involved in railway operations.
    ◦ Article 3, paragraphs 1, 2, 3, 4: Explains terms related to railways such as "Guard post", "Guard post", "Hazardous location for railway traffic safety", "Dangerous goods", "Land area".
    ◦ Article 4: This article provides detailed regulations on the preparation, appraisal, approval, publication, implementation, evaluation, and adjustment of railway line and station planning, including the main content and implementation procedures.
    ◦ Article 5: Regulations on research, application, and transfer of railway technology in accordance with the law on science, technology, and innovation.
    ◦ Chapter II, Section 1: New regulations on naming railway lines and stations; commissioning, decommissioning, and dismantling railway lines, sections, and stations.
    ◦ Chapter II, Section 2: New regulations on the management and maintenance of railway infrastructure shared with roads and connecting infrastructure used in common with railway infrastructure.
    ◦ Chapter II, Section 3: New regulations on the scope of protection for railway infrastructure and railway safety corridors, including the scope of protection for lines, bridges, tunnels, stations, depots, information systems, signaling systems, power supply, railway embankments, and railway safety corridors in areas with level crossings, adjacent to roads, waterways, high-voltage power grids, national defense and security facilities, and historical and cultural relics.
    ◦ Chapter II, Section 4: New regulations on the management and use of land designated for railways, including management content, boundary determination, management records, and land use within the railway land area.
    ◦ Chapter II, Section 5: New regulations on the conditions for operating railway infrastructure and the rights and obligations of railway infrastructure businesses.
    ◦ Chapter II, Section 6: New regulations on the route and responsibilities for handling railway-to-rail crossings and railway-to-road crossings on existing railways.
    ◦ Chapter III, Section 1: New regulations on railway transport business, including conditions, rights and obligations of transport enterprises, passengers and transport hirers.
    ◦ Chapter III, Section 2: New regulations on discounted train fares for beneficiaries of social policies.
    ◦ Chapter III, Section 3: New regulations on transport for special missions and social welfare, including principles and implementation of support.
    ◦ Chapter III, Section 4: New regulations on the List of Dangerous Goods and the Transport of Dangerous Goods by Rail, including classification, list, packaging, labeling, transport requirements, safety training, handling, warehousing, and responsibilities of the parties involved.
    ◦ Chapter IV, Article 57: Responsibilities of the Ministry of Construction in managing and protecting railway infrastructure and reporting to the Government.
    ◦ Chapter IV, Article 58: Responsibilities of the Ministry of Finance in allocating funds and providing transportation support.
    ◦ Chapter IV, Article 59: The responsibility of the Ministry of Defence in providing input on the dismantling of railway lines and the transport of hazardous goods.
    ◦ Chapter IV, Article 60: Responsibilities of the Ministry of Public Security in inspecting, controlling, handling violations, preventing crime, and coordinating propaganda.
    ◦ Chapter IV, Article 61: Responsibilities of the Provincial People's Committee in managing and protecting land designated for railways, handling unauthorized crossings, reporting to the Government, and related matters.
    ◦ Chapter IV, Article 62: Responsibilities of the People's Committee at the commune level in managing and protecting land designated for railways, handling unauthorized crossings, and coordinating with relevant agencies.
    ◦ Chapter IV, Article 63: Responsibilities of agencies, organizations, and enterprises managing railway infrastructure assets in land use, reporting management results, handling intersections, and reporting to the Government.
    ◦ Chapter V, Article 64, Clauses 1, 2, 3, 4, 5, 6, 7: Amend and supplement certain articles of relevant Decrees, including Decree No. 37/2019/ND-CP, Decree No. 56/2019/ND-CP, Decree No. 32/2019/ND-CP, and repeal certain articles of Decree No. 105/2025/ND-CP, Decree No. 140/2025/ND-CP, Decree No. 144/2025/ND-CP, Decree No. 14/2026/ND-CP, Decree No. 85/2024/ND-CP, and Decree No. 65/2018/ND-CP.
    ◦ Article 65, paragraphs 1, 2, and 3: Stipulates the effective date and expiration dates of decrees.
    ◦ Article 66, paragraphs 1 and 2: Transitional provisions for enterprises and investment projects in railway infrastructure construction.
    ◦ Appendix I: Provides details on the scope of protection for railway infrastructure, including the protection of lines, bridges, tunnels, stations, depots, communication systems, signaling systems, power supply, railway embankments, and railway safety corridors.
    ◦ Appendix II: Provides sample outlines for reports on the management and use of land for railways and reports on the handling of railway level crossings.
    ◦ Appendix III: List of dangerous goods.
    ◦ Appendix IV: Hazard Numbers.
    ◦ Appendix V: Sample labels and symbols for hazardous goods.
    From Decree No. 217/2026/ND-CP
    ◦ Article 1, Clause 1, Point 1: Adds a provision on "specialized construction agencies" to Clause 19, Article 3 of the Construction Law No. 135/2025/QH15.
    ◦ Article 1, paragraph 2: Expands the scope of application to include foreign organizations and individuals involved in railway operations.
    ◦ Article 3, paragraphs 1, 2, 3, 4: Explains terms related to railways such as "Guard post", "Guard post", "Positive location for railway traffic safety", "Dangerous goods", "Land area".
    ◦ Article 4: This article provides detailed regulations on the preparation, appraisal, approval, publication, implementation, evaluation, and adjustment of railway line and station planning, including the main content and implementation procedures.
    ◦ Article 5: Regulations on research, application, and transfer of railway technology in accordance with the law on science, technology, and innovation.
    ◦ Chapter II, Section 1: New regulations on naming railway lines and stations; commissioning, decommissioning, and dismantling railway lines, sections, and stations.
    ◦ Chapter II, Section 2: New regulations on the management and maintenance of railway infrastructure shared with roads and connecting infrastructure used in common with railway infrastructure.
    ◦ Chapter II, Section 3: New regulations on the scope of protection for railway infrastructure and railway safety corridors, including the scope of protection for lines, bridges, tunnels, stations, depots, information systems, signaling systems, power supply, railway embankments, and railway safety corridors in areas with level crossings, adjacent to roads, waterways, high-voltage power grids, national defense and security facilities, and historical and cultural relics.
    ◦ Chapter II, Section 4: New regulations on the management and use of land designated for railways, including management content, boundary determination, management records, and land use within the railway land area.
    ◦ Chapter II, Section 5: New regulations on the conditions for operating railway infrastructure and the rights and obligations of railway infrastructure businesses.
    ◦ Chapter II, Section 6: New regulations on the route and responsibilities for handling railway-to-rail and railway-to-road level crossings on existing railways.
    ◦ Chapter III, Section 1: New regulations on railway transport business, including conditions, rights and obligations of transport enterprises, passengers and transport hirers.
    ◦ Chapter III, Section 2: New regulations on discounted train fares for beneficiaries of social policies.
    ◦ Chapter III, Section 3: New regulations on transport for special missions and social welfare, including principles and implementation of support.
    ◦ Chapter III, Section 4: New regulations on the List of Dangerous Goods and the Transport of Dangerous Goods by Rail, including classification, list, packaging, labeling, transport requirements, safety training, handling, warehousing, and responsibilities of the parties involved.
    ◦ Chapter IV, Article 57: Responsibilities of the Ministry of Construction in managing and protecting railway infrastructure and reporting to the Government.
    ◦ Chapter IV, Article 58: Responsibilities of the Ministry of Finance in allocating funds and providing transportation support.
    ◦ Chapter IV, Article 59: The responsibility of the Ministry of Defence in providing input on the dismantling of railway lines and the transport of hazardous goods.
    ◦ Chapter IV, Article 60: Responsibilities of the Ministry of Public Security in inspecting, controlling, handling violations, preventing crime, and coordinating propaganda.
    ◦ Chapter IV, Article 61: Responsibilities of the Provincial People's Committee in managing and protecting land designated for railways, handling unauthorized crossings, reporting to the Government, and related matters.
    ◦ Chapter IV, Article 62: Responsibilities of the People's Committee at the commune level in managing and protecting land designated for railways, handling unauthorized crossings, and coordinating with relevant agencies.
    ◦ Chapter IV, Article 63: Responsibilities of agencies, organizations, and enterprises managing railway infrastructure assets in land use, reporting management results, handling intersections, and reporting to the Government.
    ◦ Chapter V, Article 64, Clauses 1, 2, 3, 4, 5, 6, 7: Amend, supplement, and repeal certain articles of relevant Decrees, including Decree No. 37/2019/ND-CP, Decree No. 56/2019/ND-CP, Decree No. 32/2019/ND-CP, and repeal certain articles of Decree No. 105/2025/ND-CP, Decree No. 140/2025/ND-CP, Decree No. 144/2025/ND-CP, Decree No. 14/2026/ND-CP, Decree No. 85/2024/ND-CP, and Decree No. 65/2018/ND-CP.
    ◦ Article 65, paragraphs 1, 2, and 3: Stipulates the effective date and expiration dates of decrees.
    ◦ Article 66, paragraphs 1 and 2: Transitional provisions for enterprises and investment projects in railway infrastructure construction.
    ◦ Appendix I: Provides details on the scope of protection for railway infrastructure, including the protection of lines, bridges, tunnels, stations, depots, communication systems, signaling systems, power supply, railway embankments, and railway safety corridors.
    ◦ Appendix II: Provides sample outlines for reports on the management and use of land for railways and reports on the handling of railway level crossings.
    ◦ Appendix III: List of dangerous goods.
    ◦ Appendix IV: Hazard Numbers.
    ◦ Appendix V: Sample labels and symbols for hazardous goods.
    ### Changes
    FocusOld (Decree No. 105/2025/ND-CP)New (Decree No. 16/2026/ND-CP)
    Scope of ApplicationRegulations detailing certain articles and implementation measures of the Law on Fire Prevention, Firefighting, and Rescue.Regulations detailing certain articles of the Railway Law No. 95/2025/QH15, including detailed provisions on planning, infrastructure, protection areas, traffic safety corridors, land management, transportation, dangerous goods, and other regulations related to railway operations.
    GlossaryNo explanations of railway-related terms are provided.Article 3 explains the terms: "Guard post", "Guard post", "Place of danger to railway traffic safety", "Dangerous goods", "Land area".
    Naming of railway lines and stationsNot mentioned.Article 6 stipulates the principles for naming and renaming railway lines and stations, and the authority for naming and renaming them.
    Putting into operation, ceasing operation, dismantling railway lines, sections, and stationsNo details mentioned.Articles 7, 8, and 9 provide detailed regulations on putting into operation, ceasing operation, and dismantling railway lines, sections, and stations, including the authority to make decisions.
    Management and maintenance of railway infrastructureNot mentioned.Section 2, Chapter II (Articles 10, 11, 12) specifies the management and maintenance of railway infrastructure shared with roads, and technical infrastructure connecting to and shared with railways.
    Scope of protection for railway infrastructure and railway safety corridorsNot mentioned.Section 3, Chapter II (Articles 13, 14, 15, 16, 17, 18, 19) specifies the scope of protection for railway lines, railway bridges, railway tunnels, railway stations, railway depots, information systems, signaling systems, power supply, railway embankments, and railway safety corridors.
    Management and use of land designated for railwaysNot mentioned.Section 4, Chapter II (Articles 20, 21, 22, 23, 24, 25) provides detailed regulations on the management and use of land designated for railways, including management content, boundary determination, documentation, land use, and construction of structures within the land designated for railways.
    Railway infrastructure businessNot mentioned.Section 5, Chapter II (Articles 26, 27) stipulates the business conditions and rights and obligations of enterprises operating railway infrastructure.
    The process and responsibilities for handling railway-to-rail and railway-to-road level crossings that do not comply with the Railway LawNot mentioned.Section 6, Chapter II (Articles 28, 29, 30, 31, 32, 33, 34) specifies the requirements, principles, management, and measures to ensure traffic safety at level crossings and hazardous points, including the process for handling them.
    Railway transport businessNot mentioned.Section 1, Chapter III (Articles 35, 36, 37, 38) stipulates the business conditions, rights and obligations of railway transport enterprises, passengers and transport hirers.
    Discounted train tickets for beneficiaries of social policiesNot mentioned.Section 2, Chapter III (Articles 39, 40, 41) specifies the beneficiaries, discount levels, and other regulations regarding discounted tickets for beneficiaries of social policies.
    Transportation for special missions and social welfareNot mentioned.Section 3, Chapter III (Articles 42, 43, 44) regulates transportation for special missions and social welfare, including principles and implementation of support.
    List of dangerous goods and transport of dangerous goods by railNot mentioned.Section 4, Chapter III (Articles 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56) specifies the classification, list, packaging, labeling of dangerous goods, transport requirements, safety training, loading and unloading, warehousing, responsibilities of parties, and incident handling in the transport of dangerous goods by rail.
    Responsibilities of Ministries and People's Committees at all levels related to railway operationsNo detailed specific responsibilities are mentioned for each Ministry and People's Committee at each level.Chapter IV (Articles 57, 58, 59, 60, 61, 62, 63) clearly stipulates the responsibilities of the Ministry of Construction, the Ministry of Finance, the Ministry of National Defense, the Ministry of Public Security, and the People's Committees at the provincial and commune levels regarding the management and protection of railway infrastructure, handling level crossing issues, and reporting to the Government.
    Amendments, Supplements, and Repeal of Certain Articles of Other DecreesAmendments and supplements are made to certain articles of Decree No. 67/2023/ND-CP, Decree No. 78/2021/ND-CP, Decree No. 175/2024/ND-CP, Decree No. 161/2024/ND-CP, Decree No. 34/2024/ND-CP, and Decree No. 65/2018/ND-CP relating to insurance, construction, and transportation of dangerous goods.Chapter V, Article 64 amends, supplements, and repeals several articles of various other Decrees, including the repeal of Clause 6, Article 44, and Article 24 of Decree No. 140/2025/ND-CP; Article 30 and Clause 2, Article 33 of Decree 67/2026/ND-CP; Articles 4, 5, 6, and 7; Clause 3, Article 29 of Decree No. 140/2025/ND-CP; Clause 1, Article 4; Articles 10 and 11 of Appendix III issued with Decree No. 144/2025/ND-CP; Article 24 of Decree No. 14/2026/ND-CP; and Clause 1, Article 28 of Decree No. 178/2025/ND-CP. (Note: There is an overlap in the number of amended/repealed Decrees between the provided documents, for example, Decree...) (105/2025/ND-CP).
    Effective DateDecree No. 105/2025/ND-CP takes effect from July 1, 2025. Several other Decrees have expired.Article 65, Clause 1 of Decree No. 16/2026/ND-CP takes effect from the date of signing. Clause 2 lists the Decrees that have expired, including Decree No. 56/2018/ND-CP, Decree No. 65/2018/ND-CP, Decree No. 01/2022/ND-CP, and Decree No. 91/2023/ND-CP.
    Transitional ProvisionsThere are transitional provisions regarding vehicle inspection, handling of facilities that do not meet fire safety standards, issuance of design approval certificates, professional training, and handling of temporary suspension or suspension of operations.Article 66 provides more detailed transitional provisions, especially for businesses and investment projects in railway infrastructure construction related to business conditions, scope of protection of works, and railway safety corridors.
    AppendixThere are Appendices I to VIII regarding the list of facilities, forms, insurance premiums, etc.Additional Appendix I on Details for Determining the Scope of Protection of Railway Infrastructure, Appendix II on Sample Report Outlines, Appendix III on the List of Dangerous Goods, Appendix IV on Hazard Codes, Appendix V on Sample Labels and Symbols for Dangerous Goods.
    Decree No. 217/2026/ND-CP (Amending and supplementing Decree No. 105/2025/ND-CP)
    ◦ Article 1, Clause 1, Point 1: Adds a provision on "specialized construction agencies" to Clause 19, Article 3 of the Construction Law No. 135/2025/QH15.
    ◦ Article 1, paragraph 2: Expands the scope of application to include foreign organizations and individuals involved in railway operations.
    ◦ Article 3, paragraphs 1, 2, 3, 4: Explains terms related to railways such as "Guard post", "Guard post", "Hazardous location for railway traffic safety", "Dangerous goods", "Land area".
    ◦ Article 4: This article provides detailed regulations on the preparation, appraisal, approval, publication, implementation, evaluation, and adjustment of railway line and station planning, including the main content and implementation procedures.
    ◦ Article 5: Regulations on research, application, and transfer of railway technology in accordance with the law on science, technology, and innovation.
    ◦ Chapter II, Section 1: New regulations on naming railway lines and stations; commissioning, decommissioning, and dismantling railway lines, sections, and stations.
    ◦ Chapter II, Section 2: New regulations on the management and maintenance of railway infrastructure shared with roads and connecting infrastructure used in common with railway infrastructure.
    ◦ Chapter II, Section 3: New regulations on the scope of protection for railway infrastructure and railway safety corridors, including the scope of protection for lines, bridges, tunnels, stations, depots, information systems, signaling systems, power supply, railway embankments, and railway safety corridors in areas with level crossings, adjacent to roads, waterways, high-voltage power grids, national defense and security facilities, and historical and cultural relics.
    ◦ Chapter II, Section 4: New regulations on the management and use of land designated for railways, including management content, boundary determination, management records, and land use within the railway land area.
    ◦ Chapter II, Section 5: New regulations on the conditions for operating railway infrastructure and the rights and obligations of railway infrastructure businesses.
    ◦ Chapter II, Section 6: New regulations on the route and responsibilities for handling railway-to-rail and railway-to-road level crossings on existing railways.
    ◦ Chapter III, Section 1: New regulations on railway transport business, including conditions, rights and obligations of transport enterprises, passengers and transport hirers.
    ◦ Chapter III, Section 2: New regulations on discounted train fares for beneficiaries of social policies.
    ◦ Chapter III, Section 3: New regulations on transport for special missions and social welfare, including principles and implementation of support.
    ◦ Chapter III, Section 4: New regulations on the List of Dangerous Goods and the Transport of Dangerous Goods by Rail, including classification, list, packaging, labeling, transport requirements, safety training, handling, warehousing, and responsibilities of the parties involved.
    ◦ Chapter IV, Article 57: The Ministry of Construction's responsibility in managing and protecting railway infrastructure and reporting to the Government.
    ◦ Chapter IV, Article 58: Responsibilities of the Ministry of Finance in allocating funds and providing transportation support.
    ◦ Chapter IV, Article 59: The responsibility of the Ministry of Defence in providing input on the dismantling of railway lines and the transport of hazardous goods.
    ◦ Chapter IV, Article 60: Responsibilities of the Ministry of Public Security in inspecting, controlling, handling violations, preventing crime, and coordinating propaganda.
    ◦ Chapter IV, Article 61: Responsibilities of the Provincial People's Committee in managing and protecting land designated for railways, handling unauthorized crossings, reporting to the Government, and related issues.
    ◦ Chapter IV, Article 62: Responsibilities of the People's Committee at the commune level in managing and protecting land designated for railways, handling unauthorized crossings, and coordinating with relevant agencies.
    ◦ Chapter IV, Article 63: Responsibilities of agencies, organizations, and enterprises managing railway infrastructure assets in land use, reporting management results, handling intersections, and reporting to the Government.
    ◦ Chapter V, Article 64, Clauses 1, 2, 3, 4, 5, 6, 7: Amend, supplement, and repeal certain articles of relevant Decrees, including Decree No. 37/2019/ND-CP, Decree No. 56/2019/ND-CP, Decree No. 32/2019/ND-CP, and repeal certain articles of Decree No. 105/2025/ND-CP, Decree No. 140/2025/ND-CP, Decree No. 144/2025/ND-CP, Decree No. 14/2026/ND-CP, Decree No. 85/2024/ND-CP, and Decree No. 65/2018/ND-CP.
    ◦ Article 65, paragraphs 1, 2, and 3: Stipulates the effective date and expiration dates of decrees.
    ◦ Article 66, paragraphs 1 and 2: Transitional provisions for enterprises and investment projects in railway infrastructure construction.
    ◦ Appendix I: Provides details on the scope of protection for railway infrastructure, including the protection of lines, bridges, tunnels, stations, depots, communication systems, signaling systems, power supply, railway embankments, and railway safety corridors.
    ◦ Appendix II: Provides sample outlines for reports on the management and use of land for railways and reports on the handling of railway level crossings.
    ◦ Appendix III: List of dangerous goods.
    ◦ Appendix IV: Hazard Numbers.
    ◦ Appendix V: Sample labels and symbols for hazardous goods.
    ◦ Article 74: Amending and supplementing several articles of Decree No. 105/2025/ND-CP, including amending Clause 1 of Article 6 (changing the phrase "construction design implemented after basic design" to "construction design implemented after the project is approved"), and repealing Clause 3 of Article 44.
    ◦ Article 75, Clauses 1, 2, and 3: Stipulates the effective date and expiration dates of decrees. Note that Clause 2 of Article 75 of Decree 217/2026/ND-CP repeals Decree 175/2024/ND-CP. Clause 3 of Article 75 repeals several provisions of other decrees.
    ◦ Article 76, paragraphs 1 and 2: Transitional provisions relating to projects that have been approved, are in progress, or have been submitted for appraisal before the effective date of this Decree.
    ### Repealed or Expired
    From Decree No. 16/2026/ND-CP
    ◦ Chapter V, Article 64, Clause 4: Repeals Clause 6 of Article 44 of Government Decree No. 105/2025/ND-CP dated May 15, 2025, detailing some provisions and measures for implementing the Law on Fire Prevention, Fighting, and Rescue. (Note: There seems to be a mistake regarding the numbering of the amending Decree, as Decree No. 16/2026/ND-CP, issued in 2026, cannot amend a Decree issued in 2025. This may be a typographical error in the original document.)
    ◦ Chapter V, Article 64, Clause 5: Article 24 of Government Decree No. 140/2025/ND-CP dated June 12, 2025, stipulating the delineation of authority of two levels of local government in the field of state management under the Ministry of Construction, is hereby repealed.
    ◦ Chapter V, Article 64, Clause 6: Repeal Article 30, Clause 2 of Article 33 of Government Decree No. 144/2025/ND-CP dated June 12, 2025, regulating the delegation and decentralization of authority in the field of state management of the Ministry of Construction.
    ◦ Chapter V, Article 64, Clause 7: Section 12, Part IV, Appendix V of Government Decree No. 85/2024/ND-CP dated July 10, 2024, detailing certain provisions of the Law on Prices, is hereby repealed.
    ◦ Article 65, Clause 2: The following Decrees shall cease to be effective from the date Decree No. 16/2026/ND-CP comes into force:
    ◦ Decree No. 56/2018/ND-CP dated April 16, 2018 of the Government regulating the management and protection of railway infrastructure.
    ◦ Decree No. 65/2018/ND-CP dated May 12, 2018 of the Government detailing the implementation of a number of articles of the Railway Law.
    ◦ Decree No. 01/2022/ND-CP dated January 4, 2022 of the Government amending and supplementing a number of articles of Decree No. 65/2018/ND-CP dated May 12, 2018 of the Government detailing the implementation of a number of articles of the Railway Law.
    ◦ Decree No. 91/2023/ND-CP dated December 14, 2023 of the Government amending and supplementing a number of articles of Decree No. 65/2018/ND-CP dated May 12, 2018 of the Government detailing the implementation of a number of articles of the Railway Law and Decree No. 01/2022/ND-CP dated January 4, 2022 of the Government amending and supplementing a number of articles of Decree No. 65/2018/ND-CP dated May 12, 2018 of the Government.
    From Decree No. 217/2026/ND-CP
    ◦ Article 75, Clause 2: Decree No. 175/2024/ND-CP dated December 30, 2024 of the Government detailing a number of articles and measures for implementing the Law on Construction regarding the management of construction activities shall cease to be in effect from the date Decree No. 217/2026/ND-CP comes into effect.
    ◦ Article 75, Clause 3, Point a: Repeals Article 30, Clause 2 of Article 33 of Decree No. 67/2026/ND-CP dated March 4, 2026 of the Government detailing and implementing measures on the overall technical design of investment projects for the construction of national and local railway lines.
    ◦ Article 75, Clause 3, Point b: Repeal Articles 4, 5, 6 and 7, Clause 3 of Article 29 of Government Decree No. 140/2025/ND-CP dated June 12, 2025, regulating the delineation of authority of two levels of local government in the field of state management under the Ministry of Construction.
    ◦ Article 75, Clause 3, Point c: Repeal Clause 1 of Article 4, Article 10, Article 11, Appendix III issued together with Government Decree No. 144/2025/ND-CP dated June 12, 2025, regulating the delegation and decentralization of authority in the field of state management of the Ministry of Construction.
    ◦ Article 75, Clause 3, Point d: Article 24 of Government Decree No. 14/2026/ND-CP dated January 13, 2026, amending and supplementing a number of articles of decrees to reduce and simplify administrative procedures related to production and business activities under the management of the Ministry of Construction, is hereby repealed.
    ◦ Article 75, Clause 3, Point d: Clause 1 of Article 28 of Government Decree No. 178/2025/ND-CP dated July 1, 2025, detailing a number of articles of the Law on Urban and Rural Planning.
    ◦ Article 75, Clause 3, Point a: Amending and supplementing a number of articles of Decree No. 37/2019/ND-CP dated May 7, 2019...; Article 75, Clause 3, Point b: Amending and supplementing a number of clauses and articles of Decree No. 56/2019/ND-CP dated June 24, 2019...; Article 75, Clause 3, Point c: Amending and supplementing sub-item 3, Section I, Table 02, Appendix I of Decree No. 32/2019/ND-CP dated April 10, 2019...
    ◦ Article 75, Clause 4: Clause 6 of Article 44 of Government Decree No. 105/2025/ND-CP dated May 15, 2025, detailing some provisions and measures for implementing the Law on Fire Prevention, Firefighting and Rescue, and Salvage, is hereby repealed. (Note regarding the typographical error mentioned above).
    ### Repealed or Expired
    From Decree No. 16/2026/ND-CP
    ◦ Chapter V, Article 65, Clause 2: The following Decrees shall cease to be effective from the date Decree No. 16/2026/ND-CP comes into force:
    ◦ Decree No. 56/2018/ND-CP dated April 16, 2018 of the Government regulating the management and protection of railway infrastructure.
    ◦ Decree No. 65/2018/ND-CP dated May 12, 2018 of the Government detailing the implementation of a number of articles of the Railway Law.
    ◦ Decree No. 01/2022/ND-CP dated January 4, 2022 of the Government amending and supplementing a number of articles of Decree No. 65/2018/ND-CP dated May 12, 2018 of the Government detailing the implementation of a number of articles of the Railway Law.
    ◦ Decree No. 91/2023/ND-CP dated December 14, 2023 of the Government amending and supplementing a number of articles of Decree No. 65/2018/ND-CP dated May 12, 2018 of the Government detailing the implementation of a number of articles of the Railway Law and Decree No. 01/2022/ND-CP dated January 4, 2022 of the Government amending and supplementing a number of articles of Decree No. 65/2018/ND-CP dated May 12, 2018 of the Government.
    ◦ Chapter V, Article 64, Clause 4: Repeal Clause 6 of Article 44 of Government Decree No. 105/2025/ND-CP dated May 15, 2025, detailing some provisions and measures for implementing the Law on Fire Prevention, Firefighting and Rescue. (Note regarding the typographical error as mentioned).
    ◦ Chapter V, Article 64, Clause 5: Article 24 of Government Decree No. 140/2025/ND-CP dated June 12, 2025, stipulating the delineation of authority of two levels of local government in the field of state management under the Ministry of Construction, is hereby repealed.
    ◦ Chapter V, Article 64, Clause 6: Repeal Article 30, Clause 2 of Article 33 of Government Decree No. 144/2025/ND-CP dated June 12, 2025, regulating the delegation and decentralization of authority in the field of state management of the Ministry of Construction.
    ◦ Chapter V, Article 64, Clause 7: Section 12, Part IV, Appendix V of Government Decree No. 85/2024/ND-CP dated July 10, 2024, detailing certain provisions of the Law on Prices, is hereby repealed.
    From Decree No. 217/2026/ND-CP
    ◦ Article 75, Clause 2: Decree No. 175/2024/ND-CP dated December 30, 2024 of the Government detailing a number of articles and measures for implementing the Law on Construction regarding the management of construction activities shall cease to be in effect from the date Decree No. 217/2026/ND-CP comes into effect.
    ◦ Article 75, Clause 3, Point a: Repeals Article 30, Clause 2 of Article 33 of Decree No. 67/2026/ND-CP dated March 4, 2026 of the Government detailing and implementing measures on the overall technical design of investment projects for the construction of national and local railway lines.
    ◦ Article 75, Clause 3, Point b: Repeal Articles 4, 5, 6 and 7, Clause 3 of Article 29 of Government Decree No. 140/2025/ND-CP dated June 12, 2025, regulating the delineation of authority of two levels of local government in the field of state management under the Ministry of Construction.
    ◦ Article 75, Clause 3, Point c: Repeal Clause 1 of Article 4, Article 10, Article 11, Appendix III issued together with Government Decree No. 144/2025/ND-CP dated June 12, 2025, regulating the delegation and decentralization of authority in the field of state management of the Ministry of Construction.
    ◦ Article 75, Clause 3, Point d: Article 24 of Government Decree No. 14/2026/ND-CP dated January 13, 2026, amending and supplementing a number of articles of decrees to reduce and simplify administrative procedures related to production and business activities under the management of the Ministry of Construction, is hereby repealed.
    ◦ Article 75, Clause 3, Point d: Clause 1 of Article 28 of Government Decree No. 178/2025/ND-CP dated July 1, 2025, detailing a number of articles of the Law on Urban and Rural Planning.
    ◦ Article 75, Clause 3, Point a: Amends and supplements several articles of Decree No. 37/2019/ND-CP dated May 7, 2019...; Article 75, Clause 3, Point b: Amends and supplements several clauses and articles of Decree No. 56/2019/ND-CP dated June 24, 2019...; Article 75, Clause 3, Point c: Amends and supplements sub-item 3, Section I, Table 02, Appendix I of Decree No. 32/2019/ND-CP dated April 10, 2019...
    ◦ Article 75, Clause 4: Clause 6 of Article 44 of Government Decree No. 105/2025/ND-CP dated May 15, 2025, detailing some provisions and measures for implementing the Law on Fire Prevention, Firefighting and Rescue, and Salvage, is hereby repealed. (Note regarding the typographical error as mentioned).
    ### Overall assessment of the impact of differences
    These amendments and supplements mainly focus on adjusting and supplementing regulations related to the railway industry and construction activities, due to the introduction of new laws such as the Railway Law No. 95/2025/QH15 and the Construction Law No. 135/2025/QH15.
    Impact of Decree No. 16/2026/ND-CP on Decree No. 105/2025/ND-CP:
    ◦ Expanded Scope of Regulation: The biggest addition is the integration of detailed regulations for the railway industry, which demonstrates coordination and updating of legislation in accordance with new laws.
    ◦ Enhancing Management and Safety: Detailed regulations on railway infrastructure protection, traffic safety corridors, handling of hazardous level crossings, and management of dangerous goods demonstrate a focus on improving safety in railway operations.
    ◦ Standardization and Clarification of Procedures: The explanation of terminology, regulations on naming, operation, dismantling, maintenance management, business, transportation, and fare reductions demonstrates an effort to standardize and clarify administrative procedures, creating more favorable conditions for organizations and individuals participating in the railway sector.
    ◦ Amendments and repeals of old regulations: The amendments, additions, and repeals of provisions related to old Decrees such as Decree No. 56/2018/ND-CP, 65/2018/ND-CP, 01/2022/ND-CP, 91/2023/ND-CP, 105/2025/ND-CP, 140/2025/ND-CP, 144/2025/ND-CP, 14/2026/ND-CP, 85/2024/ND-CP, and 65/2018/ND-CP demonstrate the continuous updating of the legal document system to ensure consistency and effectiveness.
    Impact of Decree No. 217/2026/ND-CP on Decree No. 105/2025/ND-CP:
    ◦ Replacement and Update of Construction Regulations: This Decree focuses on amending and supplementing regulations related to the Construction Law No. 135/2025/QH15, completely replacing Decree No. 175/2024/ND-CP. This means that regulations on construction management, construction permits, project appraisal, and construction design will be implemented according to this new Decree.
    ◦ Abolishing old regulations related to fire prevention and construction management: The abolition of several provisions in Decree No. 105/2025/ND-CP, Decree No. 140/2025/ND-CP, Decree No. 144/2025/ND-CP, Decree No. 14/2026/ND-CP, Decree No. 85/2024/ND-CP, and Decree No. 65/2018/ND-CP demonstrates the adjustment and removal of outdated or no longer relevant regulations, replacing them with new regulations in accordance with the 2025 Construction Law.
    ◦ Integration and Clarification of Processes: Detailed regulations on the procedures for granting construction permits, project appraisal, design appraisal, BIM application, and construction order management will create a clearer and more transparent legal framework for construction activities.
    ◦ Impact on Fire Prevention and Fighting: The amendment of Clause 1, Article 6 of Decree No. 105/2025/ND-CP (related to fire prevention and fighting design appraisal) and the repeal of Clause 3, Article 44 (related to handling fire prevention and fighting violations in Decree No. 67/2023/ND-CP) show adjustments and clarification of the relationship between construction activities and fire prevention and fighting regulations. Specifically, the amendment of Clause 1, Article 6 clarifies the integration of fire prevention and fighting appraisal into the general construction appraisal process.
    Overall, these amendments reflect the Government's efforts to update the legal system, clarify regulations, and meet the practical requirements of the sectors and fields under its regulation. In particular, the amendments show significant changes in regulations related to the railway industry and construction activities under the newly enacted laws.
    Posted date: 24-Jun-2026 24 2026 9:00AM VN
    Some amends and supplements of the

    Decree No. 217/2026/NĐ-CPstatus2 - New regulations on licensing and management of construction projects

    within:
  • Decree No. 212/2026/NĐ-CP - New regulations on conditions for capacity for construction activities
  • Effected from: 01-Jul-2026
    New additions
    ◦ Article 1, Clause 2, Point k1 (Decree No. 34/2026/ND-CP): Supplementing regulations on the scope of general urban planning in provinces and cities based on conditions regarding area, population density, and the proportion of non-agricultural labor.
    ◦ Article 1, Clause 2, Point o (Decree No. 34/2026/ND-CP): Supplements regulations on the continued preparation, appraisal, and approval of zoning plans for urban areas, economic zones, and national tourist zones that already have approved general plans before July 1, 2025.
    ◦ Article 3 (Decree No. 34/2026/ND-CP): Amend Clause 1 of Article 3 to clarify that "The agency responsible for preparing the planning is the agency, organization, or investor responsible for preparing the planning task, urban and rural planning."
    ◦ Article 4 (Decree No. 34/2026/ND-CP): Amends the entirety of Article 7 regarding cases for establishing urban master plans, adds regulations on provinces where cities or special zones are planned, city master plans, and adjusts population density criteria for existing and expanded urban areas.
    ◦ Article 5 (Decree No. 34/2026/ND-CP): Amends the entirety of Article 8 regarding the cases for establishing zoning plans, and adds regulations on approved urban master plans, economic zone master plans, national tourism zone master plans, special zones, and provincial plans.
    ◦ Article 6 (Decree No. 34/2026/ND-CP): Amends point c, clause 1 and clause 2 of Article 9 regarding cases for preparing detailed planning, and adds regulations on functional areas with a size determined by the competent authority approving the detailed planning according to the provincial plan or the city's general plan.
    ◦ Article 7 (Decree No. 34/2026/ND-CP): Amends point a, clause 3 and point c, clause 6 of Article 10 on overall site planning, adds regulations on project types for investment projects to build factories, enterprises, industrial production facilities, educational and training facilities, and adjusts the time for approving overall site planning.
    ◦ Article 8 (Decree No. 34/2026/ND-CP): Amends Clause 1 of Article 12 regarding the submission of planning tasks for appraisal, and adds a provision on submitting documents through the national database information system on construction activities.
    ◦ Article 9 (Decree No. 34/2026/ND-CP): Amends Clause 1 of Article 14 on planning, clarifying the responsibilities of the planning organization.
    ◦ Article 10 (Decree No. 34/2026/ND-CP): Amends Clause 1 of Article 15 regarding the submission of planning appraisal, and adds a provision on submitting documents through the national database information system on construction activities.
    ◦ Article 11 (Decree No. 34/2026/ND-CP): Amends Clause 2 of Article 18 regarding maps for planning tasks, urban and rural planning, emphasizing the need for supplementary surveys of the current situation.
    ◦ Article 12 (Decree No. 34/2026/ND-CP): Amends, supplements, and repeals certain provisions of Article 21 on the management of funds for urban and rural planning activities, clarifying the responsibilities of provincial People's Committees and planning approval authorities.
    ◦ Article 13 (Decree No. 34/2026/ND-CP): Amend the title of Article 25 to “Regulations on continuing the preparation, appraisal, and approval of zoning plans for urban areas, economic zones, and national tourist zones that already have approved general plans before July 1, 2025”.
    ◦ Article 14 (Decree No. 34/2026/ND-CP): Replace the phrase “city directly under the central government” with the phrase “city” in some articles.
    ◦ Article 1 (Decree No. 212/2026/ND-CP): The scope of application is expanded to provide detailed regulations for Clause 3, Article 14 and Clause 7, Article 88 of the Construction Law No. 135/2025/QH15, including the construction, management, operation, exploitation, and use of the National Information System and Database on Construction Activities.
    ◦ Article 3 (Decree No. 212/2026/ND-CP): Supplements and clarifies in detail the titles related to construction activities such as Project Manager, Project Leader, Project Commander, Project Management Director, and administrative procedures.
    ◦ Article 4 (Decree No. 212/2026/ND-CP): Provides detailed regulations on the construction of the National Information System and Database on Construction Activities, including its components, operating address, and application platform.
    ◦ Article 6 (Decree No. 212/2026/ND-CP): Stipulates the principles for collecting and updating data to create a national database on construction activities, including data on urban and rural planning, construction investment projects, construction works, norms, construction prices, construction price index, and construction activity capacity.
    ◦ Article 9 (Decree No. 212/2026/ND-CP): Provides detailed regulations on urban and rural planning databases, including classification, general data, and detailed data.
    ◦ Article 10 (Decree No. 212/2026/ND-CP): Stipulates the identification codes for urban and rural planning.
    ◦ Article 11 (Decree No. 212/2026/ND-CP): Stipulates regulations on open data and master data of the Urban and Rural Planning Database.
    ◦ Article 12 (Decree No. 212/2026/ND-CP): Procedures for creating identification codes and establishing and updating data in the Urban and Rural Planning Database.
    ◦ Article 18 (Decree No. 212/2026/ND-CP): Stipulates the data on construction capacity of organizations and individuals participating in construction activities.
    ◦ Article 19 (Decree No. 212/2026/ND-CP): Stipulates the identification code for construction activity capacity.
    ◦ Article 20 (Decree No. 212/2026/ND-CP): Stipulates regulations on open data and master data of the Construction Activity Capacity Database.
    ◦ Article 21 (Decree No. 212/2026/ND-CP): Procedures for creating identification codes, establishing and updating the database of construction activity capacity.
    ◦ Article 27 (Decree No. 212/2026/ND-CP): Provides detailed regulations on construction practice certificates, including validity, specifications, and codes.
    ◦ Article 28 (Decree No. 212/2026/ND-CP): Stipulates the fields for granting professional practice certificates and the scope of operation.
    ◦ Article 29 (Decree No. 212/2026/ND-CP): Stipulates the issuance and revocation of professional practice certificates.
    ◦ Article 30 (Decree No. 212/2026/ND-CP): Stipulates the procedures for granting and revoking professional practice certificates.
    ◦ Article 31 (Decree No. 212/2026/ND-CP): Stipulates the authority to issue and revoke professional practice certificates.
    ◦ Article 33 (Decree No. 212/2026/ND-CP): Stipulates the general conditions for obtaining a professional practice certificate.
    ◦ Article 34 (Decree No. 212/2026/ND-CP): Stipulates the professional experience requirements for obtaining a construction survey practice certificate.
    ◦ Article 35 (Decree No. 212/2026/ND-CP): Stipulates the professional experience requirements for obtaining a certificate of practice in urban and rural planning.
    ◦ Article 36 (Decree No. 212/2026/ND-CP): Stipulates the professional experience requirements for obtaining a construction design practice certificate.
    ◦ Article 37 (Decree No. 212/2026/ND-CP): Stipulates the professional experience requirements for obtaining a construction supervision practice certificate.
    ◦ Article 38 (Decree No. 212/2026/ND-CP): Stipulates the professional experience requirements for practicing as a project management director for construction investment projects and a site manager.
    ◦ Article 39 (Decree No. 212/2026/ND-CP): Provides detailed regulations on the application dossier for professional practice certificates.
    ◦ Article 40 (Decree No. 212/2026/ND-CP): Stipulates the Council for the Examination and Granting of Professional Practice Certificates.
    ◦ Article 41 (Decree No. 212/2026/ND-CP): Stipulates the public disclosure of information on the construction capacity of organizations participating in construction activities.
    ◦ Article 42 (Decree No. 212/2026/ND-CP): Stipulates the principles for managing the activities of foreign contractors.
    ◦ Article 43 (Decree No. 212/2026/ND-CP): Stipulates the conditions for granting construction activity licenses to foreign contractors.
    ◦ Article 44 (Decree No. 212/2026/ND-CP): Provides detailed regulations on application dossiers and authority for granting construction activity licenses to foreign contractors.
    ◦ Article 45 (Decree No. 212/2026/ND-CP): Stipulates regulations on adjusting construction operating licenses for foreign contractors.
    ◦ Article 46 (Decree No. 212/2026/ND-CP): Stipulates the time limit and fees for granting and adjusting construction activity licenses for foreign contractors.
    ◦ Article 47 (Decree No. 212/2026/ND-CP): Stipulates the revocation of construction activity licenses.
    ◦ Article 48 (Decree No. 212/2026/ND-CP): Stipulates the rights and obligations of foreign contractors.
    ◦ Article 49 (Decree No. 212/2026/ND-CP): Stipulates the responsibilities of the investor or project owner or main contractor towards foreign contractors.
    ◦ Article 50 (Decree No. 212/2026/ND-CP): Stipulates the responsibilities of the Ministry of Construction in building and managing the Information System on Construction Activities.
    ◦ Article 51 (Decree No. 212/2026/ND-CP): Stipulates the responsibilities of the Ministry of Science and Technology in connecting the Information System on Construction Activities.
    ◦ Article 52 (Decree No. 212/2026/ND-CP): Stipulates the responsibilities of the Ministry of Public Security in ensuring data security and safety.
    ◦ Article 53 (Decree No. 212/2026/ND-CP): Stipulates the responsibility of the Ministry of Finance in determining the expenditure level for financial support activities.
    ◦ Article 54 (Decree No. 212/2026/ND-CP): Stipulates the responsibilities of ministries, ministerial-level agencies, People's Committees at all levels, and relevant agencies and units in providing, updating, connecting, and sharing construction activity data.
    ◦ Article 55 (Decree No. 212/2026/ND-CP): Stipulates transitional provisions related to the application of new regulations on the National Information System and Database on Construction Activities.
    ◦ Article 56 (Decree No. 212/2026/ND-CP): Stipulates regulations on handling violations, rewards, disciplinary actions, and related responsibilities when building and updating data into the National Database on Construction Activities.
    ◦ Article 1 (Decree No. 217/2026/ND-CP): The scope of application is expanded to provide detailed regulations on several articles of the Construction Law No. 135/2025/QH15, including regulations on technical standards and regulations, BIM application, assignment of investors, incentive policies, construction investment procedures, project classification, construction design, construction survey, project appraisal, investment decisions, project management organization, construction permits, and construction order management.
    ◦ Article 3 (Decree No. 217/2026/ND-CP): Provides more detailed explanations of terms related to construction investment projects, main works, works with significant impact on public safety and interests, linear construction works, central agencies, project preparation agencies, and project implementation time.
    ◦ Article 4 (Decree No. 217/2026/ND-CP): Specifies detailed regulations on the investment and construction procedures for projects, including the preparation, implementation, and completion phases, as well as cases where separate procedures apply to urgent, emergency, temporary, PPP projects, and turnkey contract projects.
    ◦ Article 5 (Decree No. 217/2026/ND-CP): Classification of construction investment projects according to purpose, function, and specialized nature of the works.
    ◦ Article 6 (Decree No. 217/2026/ND-CP): Stipulates the assignment of the investor and the conditions for agencies and organizations assigned to act as the investor.
    ◦ Article 7 (Decree No. 217/2026/ND-CP): Stipulates the principles for implementing administrative procedures in construction activities, including the use of electronic data and the requirement that state agencies do not request information already available in the national database.
    ◦ Article 8 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the application of Building Information Modeling (BIM) in construction activities and digital technology solutions, including the use of BIM in state management.
    ◦ Article 9 (Decree No. 217/2026/ND-CP): Stipulates the principles for applying standards in construction activities, including international, regional, foreign standards and basic standards.
    ◦ Article 10 (Decree No. 217/2026/ND-CP): Stipulates the procedures for conducting construction surveys.
    ◦ Article 11 (Decree No. 217/2026/ND-CP): Provides detailed regulations on construction survey tasks, including content and approval authority.
    ◦ Article 12 (Decree No. 217/2026/ND-CP): Provides detailed regulations on technical survey methods for construction.
    ◦ Article 13 (Decree No. 217/2026/ND-CP): Stipulates regulations on the management of construction survey work, including the responsibilities of contractors, investors, and the authority to suspend survey work.
    ◦ Article 14 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the content of the Construction Survey Report.
    ◦ Article 15 (Decree No. 217/2026/ND-CP): Stipulates the authority and responsibility for approving the Construction Survey Results Report.
    ◦ Article 16 (Decree No. 217/2026/ND-CP): General regulations on construction design, including types of design, number of design steps, content of each design step, and regulations on design adjustments.
    ◦ Article 17 (Decree No. 217/2026/ND-CP): Provides detailed regulations on construction design tasks, including content and approval authority.
    ◦ Article 18 (Decree No. 217/2026/ND-CP): Specifies detailed regulations on the format of construction design documents, including electronic documents.
    ◦ Article 19 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the content of preliminary design.
    ◦ Article 20 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the content of the basic design.
    ◦ Article 21 (Decree No. 217/2026/ND-CP): Specifies detailed regulations on the content of FEED design.
    ◦ Article 22 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the content of technical design.
    ◦ Article 23 (Decree No. 217/2026/ND-CP): Specifies detailed regulations on the content of construction drawings.
    ◦ Article 24 (Decree No. 217/2026/ND-CP): Provides detailed regulations on technical specifications.
    ◦ Article 25 (Decree No. 217/2026/ND-CP): Stipulates regulations on the management of construction design work.
    ◦ Article 26 (Decree No. 217/2026/ND-CP): Stipulates land use planning as a basis for preparing Feasibility Study Reports and Economic-Technical Reports.
    ◦ Article 27 (Decree No. 217/2026/ND-CP): Stipulates the preparation of Feasibility Study Reports and Economic-Technical Reports, including cases where only an Economic-Technical Report is required.
    ◦ Article 28 (Decree No. 217/2026/ND-CP): Stipulates the separation of project components and investment phasing.
    ◦ Article 29 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the content of the Feasibility Study Report.
    ◦ Article 30 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the content of the Economic-Technical Report.
    ◦ Article 31 (Decree No. 217/2026/ND-CP): Stipulates the appraisal of feasibility study reports and economic-technical reports by the investment decision-maker.
    ◦ Article 32 (Decree No. 217/2026/ND-CP): Stipulates the authority of specialized construction agencies to appraise feasibility study reports.
    ◦ Article 33 (Decree No. 217/2026/ND-CP): Stipulates other regulations on the authority of specialized construction agencies to appraise feasibility study reports.
    ◦ Article 34 (Decree No. 217/2026/ND-CP): Stipulates the establishment and operation of the Appraisal Council.
    ◦ Article 35 (Decree No. 217/2026/ND-CP): Specifies the detailed requirements for submitting the Feasibility Study Report for appraisal to the specialized construction agency and the Appraisal Council.
    ◦ Article 36 (Decree No. 217/2026/ND-CP): Stipulates detailed procedures for appraising feasibility study reports by specialized construction agencies and appraisal councils.
    ◦ Article 37 (Decree No. 217/2026/ND-CP): Stipulates the time frame for appraising the Feasibility Study Report by specialized construction agencies and the Appraisal Council.
    ◦ Article 38 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the content and results of the appraisal of the Feasibility Study Report by specialized agencies on construction and the Appraisal Council.
    ◦ Article 39 (Decree No. 217/2026/ND-CP): Provides detailed regulations on project approval and investment decisions for construction projects.
    ◦ Article 40 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the adjustment of construction investment projects.
    ◦ Article 41 (Decree No. 217/2026/ND-CP): Stipulates the appraisal of construction design implemented after the project has been approved.
    ◦ Article 42 (Decree No. 217/2026/ND-CP): Stipulates the approval of construction design to be implemented after the project has been approved.
    ◦ Article 43 (Decree No. 217/2026/ND-CP): Stipulates regulations on adjusting construction design implemented after the project has been approved.
    ◦ Article 44 (Decree No. 217/2026/ND-CP): Stipulates the forms of management for construction investment projects.
    ◦ Article 45 (Decree No. 217/2026/ND-CP): Stipulates the organization and operation of the Investment and Construction Project Management Board.
    ◦ Article 46 (Decree No. 217/2026/ND-CP): Stipulates the hiring of consultants for the management of construction investment projects.
    ◦ Article 47 (Decree No. 217/2026/ND-CP): Stipulates regulations on project management boards under direct supervision.
    ◦ Article 48 (Decree No. 217/2026/ND-CP): Stipulates the investor's self-management of the project.
    ◦ Article 49 (Decree No. 217/2026/ND-CP): Stipulates the main contents of a construction permit.
    ◦ Article 50 (Decree No. 217/2026/ND-CP): Stipulates the conditions for granting new construction permits.
    ◦ Article 51 (Decree No. 217/2026/ND-CP): Stipulates the conditions for granting permits for construction, repair, renovation, and relocation of structures.
    ◦ Article 52 (Decree No. 217/2026/ND-CP): Stipulates the conditions for granting temporary construction permits.
    ◦ Article 53 (Decree No. 217/2026/ND-CP): Stipulates the authority to issue construction permits.
    ◦ Article 54 (Decree No. 217/2026/ND-CP): Stipulates the procedures and content for considering the issuance, adjustment, and extension of construction permits.
    ◦ Article 55 (Decree No. 217/2026/ND-CP): Stipulates the types of legal land documents required for granting construction permits.
    ◦ Article 56 (Decree No. 217/2026/ND-CP): General regulations on application dossiers for construction permits.
    ◦ Article 57 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the application dossier for a new construction permit.
    ◦ Article 58 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the application dossier for phased construction permits.
    ◦ Article 59 (Decree No. 217/2026/ND-CP): Specifies detailed regulations on the application dossier for a construction permit for the entire project or group of projects.
    ◦ Article 60 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the application dossier for a construction permit for individual residential buildings.
    ◦ Article 61 (Decree No. 217/2026/ND-CP): Stipulates detailed regulations on the application dossier for permits to repair, renovate, and relocate structures.
    ◦ Article 62 (Decree No. 217/2026/ND-CP): Provides detailed regulations on the application dossier for a temporary construction permit.
    ◦ Article 63 (Decree No. 217/2026/ND-CP): Stipulates regulations on adjusting and extending construction permits.
    ◦ Article 64 (Decree No. 217/2026/ND-CP): Regulations on the re-issuance of construction permits.
    ◦ Article 65 (Decree No. 217/2026/ND-CP): Stipulates the revocation and cancellation of construction permits.
    ◦ Article 66 (Decree No. 217/2026/ND-CP): Stipulates regulations on public disclosure of construction permits.
    ◦ Article 67 (Decree No. 217/2026/ND-CP): Stipulates regulations on the management of construction order.
    ◦ Article 68 (Decree No. 217/2026/ND-CP): Stipulates regulations on the management of investment in construction projects and works that require the protection of state secrets.
    ◦ Article 69 (Decree No. 217/2026/ND-CP): Stipulates regulations on the management of investment in emergency construction projects and works.
    ◦ Article 70 (Decree No. 217/2026/ND-CP): Stipulates regulations on the management of investment in the construction of urgent projects and works.
    ◦ Article 71 (Decree No. 217/2026/ND-CP): Stipulates regulations on special public investment projects and works.
    ◦ Article 72 (Decree No. 217/2026/ND-CP): Regulations on temporary construction projects and works.
    ◦ Article 73 (Decree No. 217/2026/ND-CP): Stipulates the responsibilities of ministries, sectors, and localities in implementing the Decree.
    ◦ Article 74 (Decree No. 217/2026/ND-CP): Amending, supplementing, and repealing certain articles of Decree No. 105/2025/ND-CP dated March 3, 2025, of the Government detailing certain articles and measures for the implementation of the Law on Fire Prevention, Firefighting, and Rescue.
    ◦ Article 75 (Decree No. 217/2026/ND-CP): Stipulates the effective date and the documents that are repealed or have ceased to be in effect.
    ◦ Article 76 (Decree No. 217/2026/ND-CP): Stipulates transitional provisions.
    Changes
    FocusOld (Decree No. 178/2025/ND-CP)New (Decree No. 34/2026/ND-CP)
    Scope of Application (Article 1, Clause 1)This Decree provides detailed regulations on certain articles of the Law on Urban and Rural Planning No. 47/2024/QH15.This Decree provides detailed regulations on certain articles of the Law on Urban and Rural Planning No. 47/2024/QH15, as amended and supplemented by Law No. 144/2025QH15.
    Scope of Application (Article 1, Clause 1, Point b)Point a, Clause 5, Article 3, regarding cases of establishing zoning plans based on management and development requirements in centrally-governed cities.Point a, Clause 5, Article 3, regarding cases of establishing zoning plans for areas within approved urban master plans, economic zone master plans, or national tourism zone master plans, with specific area sizes and management and development requirements.
    Scope of Application (Article 1, Clause 1, Point c)Point b, Clause 5, Article 3, regarding cases of establishing zoning plans based on area size, management requirements, and development for functional areas other than national economic zones and national tourist zones.Point b, Clause 5, Article 3, regarding cases of establishing zoning plans based on area size, management requirements, and development for functional areas other than national economic zones, national tourist zones, and special zones.
    Scope of Application (Article 1, Clause 1, Point o)Clause 5 of Article 59 on continuing the preparation, appraisal, approval, review, and adjustment of zoning plans in accordance with the law on urban planning and the law on construction for Type III and Type IV cities, economic zones, and national tourist areas that have had their general plans approved before the effective date of the Law on Urban and Rural Planning.Clause 5 of Article 4 of Law No. 144/2025/QH15 on continuing the preparation, appraisal, and approval of zoning plans for cities, economic zones, and national tourist areas that have had their general plans approved before July 1, 2025.
    Explanation of Terms (Article 3, Clause 1)The planning organization is the agency or organization responsible for preparing the planning task, urban and rural planning as stipulated in Article 17 of the Law on Urban and Rural Planning, in accordance with the two-level local government organization.The planning organization is the agency, organization, or investor responsible for preparing the planning task, urban and rural planning as stipulated in Article 17 of the Law on Urban and Rural Planning, in accordance with the two-level local government organization.
    Conditions for Consulting Organizations (Article 5, Clause 4)Consulting organizations participating in urban and rural planning must possess a construction activity capacity certificate as prescribed by the law on construction, including consulting on planning task preparation and consulting on planning. The capacity certificate of the consulting organization is classified into Grade I, Grade II, and Grade III and is issued according to the provisions of the law on construction.Consulting organizations participating in urban and rural planning must meet the capacity requirements as prescribed by the Law on Urban and Rural Planning and the law on construction.
    Cases for establishing a general urban plan (Article 7)General urban plans, as stipulated in Clause 4, Article 3 of the Law on Urban and Rural Planning, are established for the following planning scopes: a) Cities directly under the central government; b) Special zones belonging to the urban system as oriented in the overall urban and rural system plan or regional plan or provincial plan; c) Existing urban areas comprising an independent ward or several adjacent wards, belonging to the urban system as oriented in the overall urban and rural system plan or regional plan or provincial plan, with a planning scope determined in the decision approving the urban and rural planning task; d) Expanded urban areas include existing urban areas and adjacent communes, belonging to the urban system as oriented in the overall urban and rural system plan or regional plan or provincial plan, with a planning scope defined in the decision approving the urban and rural planning task and meeting the conditions of a minimum area of 50 km2, a minimum population density of 500 people/km2 and a minimum non-agricultural labor rate of 30%; e) New urban areas belonging to the urban system as oriented in the overall urban and rural system plan or regional plan or provincial plan; with a minimum planning scope of 30 km2 and defined in the decision approving the urban and rural planning task.The scope of general urban planning as stipulated in Clause 4, Article 3 and Point b, Clause 1, Article 21 of the Law on Urban and Rural Planning is defined as follows: a) Cities; a) The province plans to establish a city within the urban system according to the overall urban and rural system plan, or regional plan, or provincial plan; b) A special zone is an urban area or special zone oriented towards the urban system according to the overall urban and rural system plan, or regional plan, or provincial plan, or city master plan; c) Comprising several adjacent wards or a single independent ward (without surrounding wards), identified as belonging to the urban system according to the orientation in the overall urban and rural system plan, or regional plan, or provincial plan, or city master plan; d) Comprising several adjacent wards or an independent ward (without surrounding wards) and the scope of an adjacent commune, identified as belonging to the urban system according to the orientation in the overall urban and rural system plan or regional plan or provincial plan or city master plan, while meeting the conditions of a minimum area of 50 km2, a minimum population density of 300 people/km2 and a minimum non-agricultural labor rate of 30%; e) Having a planning scope at least according to the administrative boundaries of a commune-level unit, identified as a new urban area belonging to the urban system according to the orientation in the overall urban and rural system plan or regional plan or provincial plan or city master plan.
    Cases for establishing zoning plans (Article 8)1. Urban areas as stipulated in point a, clause 5, Article 3 of the Law on Urban and Rural Planning are determined based on the spatial structure in the general urban plan and decided by the Provincial People's Committee in the plan for implementing the general plan. 2. Functional areas as stipulated in point b, clause 5, Article 3 of the Law on Urban and Rural Planning with a minimum scale of 200 hectares or areas determined by the Provincial People's Committee with objectives and requirements for investment in the construction of technical infrastructure according to the law on construction and project management.1. Areas belonging to the general city plan or the general urban plan for a new city expected to be established; 1. Areas within the remaining urban master plan, economic zone master plan, or national tourism zone master plan shall have sub-area plans established when determined in the implementation plan of the master plan, based on the spatial structure of the approved master plan and decided by the provincial People's Committee. 2. Functional zones as stipulated in point b, clause 5, Article 3 of the Law on Urban and Rural Planning shall have areas determined by the provincial People's Committee based on development management requirements or determined with specific objectives and requirements for investment in technical infrastructure construction in accordance with the law on construction. 3. Areas determined based on the master plan or provincial plan (for special zones within the province, not oriented towards urbanization) for the implementation of investment projects in technical infrastructure construction in accordance with the law on construction.
    Cases for detailed planning (Article 9, Clause 1, Point c)Functional areas with a scale of less than 200 hectares, except for cases specified in Clause 2 of this Article.Functional areas with a scale determined by the competent authority approving the detailed plan according to the provincial plan or the city's general plan for the implementation of investment and construction projects in accordance with the law on construction, except for cases specified in Clause 2 of this Article.
    Overall site plan (Article 10, Clause 3, Point a)With a land use scale of less than 2 hectares for investment projects to build apartment buildings or apartment complexes; or with a land use scale of less than 10 hectares for investment projects to build factories, enterprises, industrial production facilities, or technical infrastructure works not along a line as determined by the general plan or specialized technical infrastructure plan or provincial plan or approved technical or specialized plan; or with a land use scale of less than 5 hectares for other cases;With a land use scale of less than 2 hectares for investment projects to build apartment buildings; or with a land use scale of less than 10 hectares for investment projects to build factories, enterprises, industrial production facilities, educational and training facilities, and non-linear technical infrastructure works as determined by the general plan or specialized technical infrastructure plan or provincial plan or approved technical or specialized plan; or with a land use scale of less than 5 hectares for all other cases;
    Master Plan (Article 10, Clause 6, Point c)The authority approving the detailed plan or the delegated/authorized agency shall review and approve the master plan, ensuring compliance with the requirements in Clause 5 of this Article. The time limit for approving the detailed plan or for the delegated/authorized agency to review and approve the master plan shall not exceed 15 days from the date of receiving complete documents from the planning organization.The authority approving the detailed plan or the delegated/authorized agency shall review and issue the approval document for the master plan, ensuring compliance with the requirements in Clauses 3 and 4 of this Article. The time limit for approving the detailed plan or for the delegated/authorized agency to review and approve the master plan shall not exceed 15 days from the date of receiving complete documents from the planning organization.
    Submission of Planning Task for Appraisal (Article 12, Clause 1)The planning organization submits the urban and rural planning task dossier to the planning appraisal agency.The planning organization sends the document along with the urban and rural planning task dossier via the national database system on construction activities to the appraisal agency for appraisal. If the urban and rural planning task dossier has not been submitted for appraisal as stipulated in this clause before January 1, 2026, after approval, the planning organization is responsible for sending the appraised and approved dossier via the national database system on construction activities.
    Planning (Article 14, Clause 1)The agency organizing the planning or the agency assigned according to Clause 10, Article 17 of the Law on Urban and Rural Planning shall select a qualified consulting organization as prescribed in Article 5 of this Decree to carry out the planning; during the urban and rural planning process, opinions must be solicited as prescribed in Article 37 of the Law on Urban and Rural Planning.The agency organizing the planning shall select a qualified consulting organization as prescribed in Article 5 of this Decree to carry out the planning; during the urban and rural planning process, opinions must be solicited as prescribed in Article 37 of the Law on Urban and Rural Planning.
    Planning Appraisal Process (Article 15, Clause 1)The planning organization shall submit the urban and rural planning task dossier to the planning approval authority for approval after it has been completed according to the appraisal report of the appraisal agency.The planning organization shall send the document along with the urban and rural planning dossier through the national database system on construction activities to the appraisal agency for appraisal. If the urban and rural planning dossier has not been submitted for appraisal as stipulated in this clause before January 1, 2026, after approval, the planning organization shall be responsible for sending the appraised and approved dossier through the national database system on construction activities.
    Maps for Planning Task Preparation (Article 18, Clause 2)The information and data of topographic maps must meet the requirements for preparing planning tasks and planning, in accordance with each type and level of planning. If the topographic map does not reflect the current situation at the time of planning, the competent authority approving the planning task, urban and rural planning shall decide to conduct supplementary topographic surveys according to the procedures stipulated in the law on surveying and mapping.The information and data of topographic maps must meet the requirements for preparing planning tasks and planning, in accordance with each type and level of planning. If the topographic map does not reflect the current situation at the time of planning, the competent authority approving the planning task, urban and rural planning shall decide to conduct supplementary surveys of the current situation, ensuring technical requirements as prescribed in the law on surveying and mapping.
    Financial Management (Article 21, Clause 2)The Ministry of Construction shall prepare and issue a list of planning projects and annual budget plans from the state budget for urban and rural planning organized by the Ministry of Construction and other plans assigned by the Prime Minister; approve cost estimates and adjusted cost estimates (if any) for urban and rural planning activities.Clause 2 is repealed.
    Financial Management (Article 21, Clause 3)People's Committees at all levels with the authority to approve planning shall prepare and issue a list of planning projects and annual budget plans from the state budget for urban and rural planning within their administrative jurisdiction, except for plans organized by the Ministry of Construction; and approve cost estimates and adjusted cost estimates (if any) for urban and rural planning activities.Provincial People's Committees (for plans under the approval authority of the Prime Minister) and the planning approval level are responsible for issuing annual budget plans and approving cost estimates for urban and rural planning activities. Provincial People's Committees may delegate or authorize subordinate agencies to approve cost estimates for urban and rural planning activities in accordance with the provisions of the law on the organization of local government. In cases where the planning task, urban planning, and rural planning are undertaken by the investor as the planning organization, that organization is responsible for approving the cost estimate for preparing the planning task, urban planning, and rural planning.
    Transitional provisions in Clause 1, Article 59 (Article 25)The agency organizing the preparation of the comprehensive plan shall compile and approve the results of the preparation and approval of the sub-area plan after the general plan has been approved; develop a plan that identifies functional areas requiring the preparation or adjustment of sub-area plans based on the approved general plan and report to the level that approved the general plan for implementation within 2 years as stipulated in the Law on Urban and Rural Planning.Regulations on the continued preparation, appraisal, and approval of sub-area plans for cities, economic zones, and national tourist areas that already have approved general plans before July 1, 2025.
    Amendments and additions to certain articles, clauses, and points of Decree No. 175/2024/ND-CP (Article 28, point n)Article 81 is amended and supplemented as follows: “Article 81. Professional experience requirements for obtaining a certificate of practice in urban and rural planning. Individuals are considered for a certificate of practice in urban and rural planning when they meet the general conditions stipulated in Article 79 of this Decree and the professional experience requirements corresponding to the following certificate categories: 1. Category I: Having served as the project manager or lead in the preparation of one urban and rural plan approved by the Prime Minister or two urban and rural plans (including one general plan or zoning plan) approved by the Provincial People's Committee. 2. Category II: Having served as the project manager or lead in the preparation of one urban and rural plan approved by the Provincial People's Committee or two urban and rural plans approved by the Commune People's Committee. 3. Category II III: Has participated in the preparation of urban and rural planning in the professional field of 02 approved urban and rural plans.”Article 81 is completely repealed and replaced with more detailed regulations on professional experience requirements for obtaining a certificate of practice in urban and rural planning according to categories I, II, and III, with adjustments regarding the number and types of plans completed.
    Amendments and additions to certain articles, clauses, and points of Decree No. 175/2024/ND-CP (Article 28, point p)Article 103 is amended and supplemented as follows: “Article 103. Capacity requirements for urban and rural planning organizations. Urban and rural planning organizations must meet the corresponding capacity requirements for each category as follows: 1. Category I: a) Have at least two individuals holding the positions of project manager and project leader for each specialized field of urban and rural planning, architecture, transportation, electricity, and water supply and drainage of urban and rural planning, holding Category I professional certificates relevant to their respective fields; b) Have prepared at least one urban and rural plan under their authority and approved by the Prime Minister, or two urban and rural plans (including at least one general plan) under their authority and approved by the Provincial People's Committee. 2. Category II: a) Individuals holding the positions of project manager and project leader in specialized fields of urban and rural planning, architecture, and transportation a) Individuals in urban and rural planning, including those in the fields of transportation, electricity, and water supply and drainage, must possess professional certificates of rank II or higher, relevant to their area of expertise; b) Have prepared at least one urban and rural plan within their jurisdiction and have had it approved by the Provincial People's Committee. 3. Rank III: Individuals holding the position of project manager or leader in specialized fields of urban and rural planning, architecture, transportation, electricity, and water supply and drainage must possess professional certificates of rank III or higher, relevant to their area of expertise.”Article 103 on the capacity requirements of organizations preparing urban and rural plans has been amended and supplemented, with adjustments to the requirements for each capacity rank I, II, and III, particularly regarding the number of individuals with professional certificates and practical experience.
    Effective Date (Article 29, Clause 2)The following legal documents are hereby repealed: a) Government Decree No. 37/2010/ND-CP dated April 7, 2010, on the preparation, appraisal, approval, and management of urban planning; b) Government Decree No. 44/2015/ND-CP dated May 6, 2015, detailing certain aspects of construction planning; c) Government Decree No. 72/2019/ND-CP dated August 30, 2019, amending and supplementing a number of articles of Decree No. 37/2010/ND-CP dated April 7, 2010, on the preparation, appraisal, approval, and management of urban planning and Decree No. 44/2015/ND-CP dated May 6, 2015, detailing a number of contents on construction planning.Repealing a number of articles and clauses of Decrees No. 105/2025/ND-CP, 140/2025/ND-CP, 144/2025/ND-CP, 178/2025/ND-CP, and 15/2021/ND-CP. The specific details of this repeal are outlined in points a, b, c, d, and e of Clause 3, Article 75 of Decree No. 217/2026/ND-CP.
    Effective Date (Article 29, Clause 3)Articles 1 and 2 of the regulations on detailed planning under the simplified procedure in Decree No. 35/2023/ND-CP dated June 20, 2023 of the Government amending and supplementing a number of articles of Decrees under the state management of the Ministry of Construction are hereby repealed.Clause 3 of Article 75 of Decree No. 217/2026/ND-CP is hereby repealed.
    Effective Date (Decree No. 212/2026/ND-CP)There are no regulations regarding the effective date related to these documents.This Decree takes effect from July 1, 2026. Government Decree No. 111/2024/ND-CP dated September 6, 2024, regulating the National Information System and Database on Construction Activities, ceases to be effective from the date this Decree takes effect. The following regulations cease to be effective from the date this Decree takes effect: a) Clause 1, Article 4, Clause 3, Article 10, and Clause 4, Article 45 of Government Decree No. 144/2025/ND-CP dated June 12, 2025, regulating the delegation of authority and decentralization in the state management field of the Ministry of Construction; b) Points a, m, n, and r of Clause 1, Article 28 of Government Decree No. 178/2025/ND-CP dated July 1, 2025, detailing some provisions of the Law on Urban and Rural Planning; c) Article 22 of Government Decree No. 14/2026/ND-CP dated January 13, 2026, amending and supplementing some articles of decrees to reduce and simplify administrative procedures related to production and business activities under the management of the Ministry of Construction.
    Transitional Provisions (Decree No. 212/2026/ND-CP)There are no regulations on transitional provisions related to these contents.The transitional provisions regulate the handling of administrative procedures whose results were issued before the effective date of this Decree but whose data has not yet been updated, the issuance of professional practice certificates under the old regulations, and the continued use of professional practice certificates issued under the 2014 Construction Law.
    Scope of Application (Decree No. 217/2026/ND-CP)There are no detailed regulations on the Construction Law No. 135/2025/QH15.This Decree provides detailed regulations on several articles of the Construction Law No. 135/2025/QH15, including regulations on: specialized construction agencies; technical standards and regulations, BIM application; conditions for being an investor; incentive policies in construction activities; construction investment procedures; project classification; construction design; construction survey; project appraisal; investment decision; project management organization; construction permits; construction order management; special projects and works.
    Article 7 (Decree No. 217/2026/ND-CP)There are no detailed regulations on the principles for implementing administrative procedures.Detailed regulations on the principles for implementing administrative procedures include: responsibilities of organizations and individuals requesting the procedure; electronic documents; the state agency's refusal to request information already available in the national database; responsibility for providing information and data to the National Construction Activities Information System and Database; and responsibilities of agencies and individuals authorized to resolve administrative procedures.
    Article 8 (Decree No. 217/2026/ND-CP)There are no detailed regulations on the application of Building Information Modeling (BIM) and digital technology solutions.Detailed regulations on the application of BIM in construction activities, including scope, content, information requirements, the use of BIM to support state management, and the responsibilities of the Ministry of Construction and other ministries managing specialized construction projects.
    Article 9 (Decree No. 217/2026/ND-CP)There are no detailed regulations on the principles of applying standards in construction activities.Regulations on the principles of applying standards in construction activities, including standards applicable to projects, the application of international, regional, foreign standards, and basic standards.
    Articles 10 to 15 (Decree No. 217/2026/ND-CP)There are no detailed regulations on construction surveys.Detailed regulations on the procedures for conducting construction surveys, construction survey tasks, construction survey technical plans, management of construction survey work, content of the Construction Survey Results Report, and approval of the Construction Survey Results Report.
    Articles 16 to 25 (Decree No. 217/2026/ND-CP)There are no detailed regulations on construction design.Detailed regulations on general construction design, construction design tasks, construction design document specifications, content of various types of design (preliminary, basic, FEED, technical, construction drawings), technical guidelines, and management of construction design work.
    Articles 26 to 38 (Decree No. 217/2026/ND-CP)There are no detailed regulations on project appraisal and investment decisions for construction.Detailed regulations on land use planning as a basis for preparing the Feasibility Study Report and Economic-Technical Report; content of the Feasibility Study Report and Economic-Technical Report; appraisal of the Feasibility Study Report and Economic-Technical Report by the investment decision-maker; authority of specialized construction agencies to appraise the Feasibility Study Report; other regulations on the authority to appraise the Feasibility Study Report; appraisal council; appraisal submission documents; appraisal procedures; appraisal time; content and results of appraisal; project approval, investment decision for construction; adjustment of construction investment projects.
    Articles 41 to 48 (Decree No. 217/2026/ND-CP)There are no detailed regulations on the management of construction design implementation after project approval and the organization of construction investment project management.Detailed regulations on the appraisal of construction design implementation after project approval; approval of construction design implementation after project approval; adjustment of construction design implementation after project approval; forms of construction investment project management; organization and operation of the Construction Investment Project Management Board; hiring consultants for construction investment project management; Project Management Board under direct supervision; investor self-management of the project.
    Articles 49 to 66 (Decree No. 217/2026/ND-CP)There are no detailed regulations on construction permits and construction order management.Detailed regulations on the main contents of construction permits; conditions for granting new construction permits, repair, renovation, relocation, and temporary permits; authority to grant construction permits; procedures and content for reviewing, granting, adjusting, extending, and re-granting construction permits; types of legal land documents for granting construction permits; application dossiers for construction permits for different types of constructions; adjustment, extension, re-granting, revocation, cancellation of construction permits and public disclosure of construction permits.
    Article 67 (Decree No. 217/2026/ND-CP)There are no detailed regulations on construction order management.Detailed regulations on construction order management, including management content, responsibilities of government levels, and measures for handling violations.
    Articles 68 to 72 (Decree No. 217/2026/ND-CP)There are no detailed regulations on the construction of special projects.Detailed regulations on the management of investment in construction projects requiring state secrecy; emergency construction projects; urgent projects; special public investment projects; and temporary projects.
    Article 74 (Decree No. 217/2026/ND-CP)There are no provisions for amending or supplementing other Decrees.Amending and supplementing some articles and clauses of Decree No. 105/2025/ND-CP dated March 3, 2025 of the Government detailing some articles and measures for implementing the Law on Fire Prevention, Fighting and Rescue.
    Effective Date (Decree No. 217/2026/ND-CP)There are no regulations regarding the effective date.This Decree takes effect from July 1, 2026. Government Decree No. 175/2024/ND-CP dated December 30, 2024, detailing some articles and measures for implementing the Law on Construction regarding construction management, ceases to be effective from the date this Decree takes effect. Some articles and clauses of other related Decrees are repealed.
    ### Repealed or Expired
    ◦ Article 29, Clause 2 (Decree No. 178/2025/ND-CP): The following legal documents are repealed: a) Government Decree No. 37/2010/ND-CP dated April 7, 2010 on the preparation, appraisal, approval and management of urban planning; b) Government Decree No. 44/2015/ND-CP dated May 6, 2015 detailing some contents on construction planning; c) Government Decree No. 72/2019/ND-CP dated August 30, 2019, amending and supplementing a number of articles of Decree No. 37/2010/ND-CP dated April 7, 2010, on the preparation, appraisal, approval, and management of urban planning and Decree No. 44/2015/ND-CP dated May 6, 2015, detailing a number of contents on construction planning.
    ◦ Article 29, Clause 3 (Decree No. 178/2025/ND-CP): Articles 1 and 2 stipulating detailed planning according to the simplified procedure in Decree No. 35/2023/ND-CP dated June 20, 2023 of the Government amending and supplementing a number of articles of Decrees under the state management of the Ministry of Construction are hereby repealed.
    ◦ Article 75, Clause 2 (Decree No. 217/2026/ND-CP): Decree No. 175/2024/ND-CP dated December 30, 2024 of the Government detailing a number of articles and measures for implementing the Law on Construction regarding the management of construction activities shall cease to be in effect from the date this Decree comes into effect.
    ◦ Article 75, Clause 3, Point a (Decree No. 217/2026/ND-CP): Articles 4, 5, 6 and 7, Clause 3 of Article 29 of Decree No. 140/2025/ND-CP dated June 12, 2025 of the Government stipulating the delineation of authority of two levels of local government in the field of state management of the Ministry of Construction are hereby repealed.
    ◦ Article 75, Clause 3, Point b (Decree No. 217/2026/ND-CP): Clause 1 of Article 4, Article 10, Article 11, and Appendix III issued with Government Decree No. 144/2025/ND-CP dated June 12, 2025, regulating the delegation of authority and decentralization in the state management field of the Ministry of Construction, are hereby repealed.
    ◦ Article 75, Clause 3, Point d (Decree No. 217/2026/ND-CP): Article 24 of Decree No. 14/2026/ND-CP dated January 13, 2026 of the Government amending and supplementing a number of articles of decrees to reduce and simplify administrative procedures related to production and business activities under the management of the Ministry of Construction is hereby repealed.
    ◦ Article 75, Clause 3, Point d (Decree No. 217/2026/ND-CP): Clause 1 of Article 28 of Decree No. 178/2025/ND-CP dated July 1, 2025 of the Government detailing a number of articles of the Law on Urban and Rural Planning is hereby repealed.
    ### Overall assessment of the impact of differences
    The amendments, particularly Decree No. 34/2026/ND-CP, Decree No. 212/2026/ND-CP, and Decree No. 217/2026/ND-CP, have had a significant impact on Decree No. 178/2025/ND-CP. Specifically:
    1. Clarifying and detailing regulations: The amended documents have supplemented and clarified many regulations already present in Decree 178/2025/ND-CP. For example, the amendments to the provisions on cases for preparing urban master plans and zoning plans (Articles 4 and 5 of Decree 34/2026/ND-CP) help to more clearly define the scope and conditions of application.
    2. Updating Regulations According to the New Construction Law: Decree No. 212/2026/ND-CP and Decree No. 217/2026/ND-CP are typical examples of updating regulations to conform with Construction Law No. 135/2025/QH15. This includes adding regulations on the National Information System and Database on Construction Activities, professional certificates, construction permits for foreign contractors, and the entire process of managing construction investment projects and granting construction permits.
    3. Integrating Digital Technology and Data: The introduction of regulations on the National Information System and Database on Construction Activities (Decree 212/2026/ND-CP) demonstrates a trend towards modernizing management processes by utilizing digital technology, identification codes, and centralized databases to increase transparency and efficiency.
    4. Changes in administrative procedures: Several administrative procedures have been amended, particularly the integration of submitting applications and receiving results through the national database information system on construction activities (e.g., Articles 8 and 10 of Decree 34/2026/ND-CP). This may change the way management agencies and regulated entities operate.
    5. Repealing and invalidating old regulations: The repeal of decrees or specific provisions within old decrees indicates a change in the legal system, centralizing and updating regulations to conform with the new law. This means that the old regulations are no longer in effect and the amended documents will replace and regulate them.
    6. Enhancing clarity and detail: Revisions often aim to clarify general or incomplete points in the original text, ensuring feasibility and comprehensibility during implementation.
    Overall, the revised texts have made the legal framework for urban and rural planning, as well as construction activities, more detailed, modern, and consistent with the new provisions of the Law.

    ai-luatvietnam-icon-24 Change analysis

    Found 644 posts Export list to Excel