Please sign in or register an account to view the full version.
New regulations on maintenance of marine works
Circular No. 05/2026/TT-BXD dated February 10, 2026 of the Ministry of Construction regulating the maintenance of marine works and the frequency of surveys of marine notices (18 pages)
Posted: 24/2/2026 9:42:06 AM | Latest updated: 25/2/2026 11:10:53 AM (GMT+7) | Newsletter #:6386
Effective: 1-Apr-2026
Status: No amendments
Here are the outstanding new regulations:
1. Procedures and Responsibilities for Formulation and Approval of Maintenance Plans (Article 7)
This is one of the major changes in the administrative process:
Main responsibilities: The Vietnam Maritime and Waterways Administration is responsible for making annual maintenance plans and submitting them to the Ministry of Construction* (instead of the Ministry of Transport as before).
• Clear 2-stage process:
1. Demand planning: Before June 15 every year, the Vietnam Maritime and Waterway Administration must submit to the Ministry of Construction a demand plan and estimated funding for the following year. The Ministry of Construction approves before 30/6.
2. Formulation of official maintenance plans: After the decision on allocation of budget estimates is issued, the Vietnam Maritime and Waterways Administration shall review and make official maintenance plans and submit them to the Ministry of Construction for approval.
• Regulations on adjustment of plans:
◦ The Vietnam Maritime and Waterways Administration is allowed to proactively adjust some contents (dredging standards, volume, expected funding) as long as it does not increase the total approved budget.
◦ Must report to the Ministry of Construction in important cases such as: supplementing unplanned tasks, increasing total funding, or adjusting the estimate of maintenance of navigational channels by more than 20%.
2. New regulations on Safety Assessment of Maritime Works (Article 10)
This is a new regulation, especially important for ports and wharves.
• Subjects of application: Ports and wharves receiving offloaded ships with specifications greater than the specifications of the announced ship.
• Frequency of Periodic Safety Assessments:
◦ First time: Implemented after 01 year from the receipt of the first large ship, or after receiving 40 trains, whichever comes first.
◦ Subsequent times: Implemented every 03 years, or after receiving 120 trains, whichever comes first.
• Responsibilities: Port operators must actively monitor and carry out safety assessments, send the results to the regional port authorities for monitoring. The port authority will only consider allowing the reception of larger ships when the enterprise has completed the safety assessment.
• Transitional provisions (Article 17): Ports and wharves that have received larger ships before the Circular takes effect must carry out the first safety assessment within 12 months from the effective date of the Circular (i.e. before 01/04/2027).
3. Applying a Scoring System to Determine Survey Frequency
The new circular moves from rigid regulation to a flexible methodology, based on the level of risk and actual conditions through a scoring system (100-point scale).
• For navigational channels (Article 15):
◦ The frequency of the survey ranges from 02 months (total score of 85 or more) to 03 years (total score of 44 or less).
◦ The scoring criteria are specified in Appendix IV.
• For anchorage areas, storm shelters, pilot pick-up and drop-off areas (Article 15):
◦ The survey frequency ranges from 01 year/time (total score of 85 or more) to 05 years/time (total score of 54 or less).
◦ The scoring criteria are specified in Appendix V.
• For waters in front of ports, wharves and transshipment areas (Article 16):
◦ The frequency of the survey ranges from 1 year/time (total score of 80 or more) to 03 years/time (total score of 64 or less).
◦ The scoring criteria are specified in Appendix VI.
4. Specific Regulations for New or Post-Dredging, Upgraded Construction
• For channels, anchorages, water bodies... newly announced or after dredging and upgrading, surveys must be carried out with a higher frequency in the first 03 years to monitor the level of sedimentation:
◦ Navigational channels, anchorages: every 06 months.
◦ Waters in front of the harbor: every 12 months.
5. Publishing the Survey Periodic Portfolio
• Ministry of Construction: Every 03 years, announcing and updating the list of periodic surveys of public navigable channels, anchorage areas, storm shelters, etc.
• Vietnam Maritime and Waterway Administration: Every 03 years, announcing and updating the list of periodic surveys of special-use navigational channels and waters in front of ports and wharves.
The Circular takes effect from April 1, 2026 and replaces Circular No. 19/2022/TT-BGTVT⛔ dated July 26, 2022.
Related document |
|
| Please sign in or register an account to view this information | |
Files attachment |