The new methods of determination of construction investment costs
Circular No. 06/2016/TT-BXD dated March 10th, 2016 of the Ministry of Construction on guiding the determination and management of construction investment costs
Posted: 31/3/2016 3:36:16 PM | Latest updated: 10/1/2020 8:58:07 AM (GMT+7) | Newsletter #:3957
Effective: 1-May-2016
Status: Expired on: 15-Feb-2020
This Circular is to replace the Appendixes guiding the determination of construction investment costs as prescribed in Decree No. 32/2015/ND-CP⛔, including:1. Method of determining the total construction investment (Appendix 1)
2. Method of determination of construction estimate (Appendix 2)
3. Method of determining the constructional cost estimate (Appendix 3)
4. Method of determining the price of works construction (Appendix 4)
5. Method of determining the norm of works construction estimate (Appendix 5)
6. Method of determining the price of machine shift and constructional equipment (Appendix 6)
7. Method of determining the construction price index (Appendix 7)
8. Reporting form of result of appraisal/verification/consultation to determine the constructional price index (Appendix 8)
In addition, according to the new provisions provided in point b Clause 5 Article 7 of this Circular, the loan interests during the construction shall not be included in the works construction estimate
This Circular takes effect from May 01st, 2016. To replace Circular No. 04/2010/TT-BXD⛔ dated May 26th, 2010, Circular No. 06/2010/TT-BXD⛔ dated May 26th, 2010 and Circular No. 02/2011/TT-BXD⛔ dated February 22nd, 2011.
Effective notes
This Circular shall be expired from February 15th, 2020, replaced by Circular No. 09/2019/TT-BXD⛔ dated December 26th, 2019.