Layout & language AEN
Sign in
Posted date: 2-Feb-2026 10:56:24 AM VN
Summary of Violations and Penalties under

Decree No. 336/2025/NĐ-CP - Many road traffic violations will see increased fines starting March 1, 2026.

Effective date: 01-Mar-2026
💡 Acts subject to penalties shall be regarded as prohibited or mandatory acts.
Behavior and Penalties
(Articles 5-15)
ViolationMinimumMaximum
Planting trees in the road safety corridor that obstructs visibility (personal)500,000 VND1,000,000 VND
Planting trees in the road safety corridor that obstruct visibility (organization)1,000,000 VND2,000,000 VND
Erecting an illegal entrance gate within the land designated for road infrastructure (private)1,000,000 VND2,000,000 VND
Erecting an illegal entrance gate within the land designated for road infrastructure (organization)2,000,000 VND4,000,000 VND
Hanging banners illegally within the road right-of-way (individual)1,000,000 VND2,000,000 VND
Hanging banners illegally within the road right-of-way (organization)2,000,000 VND4,000,000 VND
Placing or hanging signs and billboards on road land in non-urban areas (individual)1,000,000 VND2,000,000 VND
Placing or hanging signs and billboards on road land in non-urban areas (organized)2,000,000 VND4,000,000 VND
Littering on public roads (individuals)1,000,000 VND2,000,000 VND
Disposing of waste on the road in an unauthorized location (organization)2,000,000 VND4,000,000 VND
Erecting tents, stalls, gates, fences of all kinds, and other structures illegally within the land designated for road infrastructure (individual)3,000,000 VND5,000,000 VND
Erecting tents, stalls, gates, fences of all kinds, and other structures illegally within the land designated for road infrastructure (organization)6,000,000 VND10,000,000 VND
Illegally dumping or leaving materials and waste in the road safety corridor (individual)4,000,000 VND6,000,000 VND
Illegally dumping or leaving materials and waste in the road safety corridor (organization)8,000,000 VND10,000,000 VND
Unauthorized excavation, embankment, leveling, or site preparation within the land designated for road infrastructure (individual)4,000,000 VND6,000,000 VND
Unauthorized excavation, embankment, leveling, or site preparation within the land designated for road infrastructure (by an organization) | 8,000,000 VND | 10,000,000 VND
| Unauthorized attachment, hanging, installation, or placement of unrelated content on road signage (personal) | 4,000,000 VND | 6,000,000 VND |
| Unauthorized installation, placement, or attachment of unrelated content to road signage (by an organization) | 8,000,000 VND | 10,000,000 VND |
| Erecting tents, stalls, or other structures illegally in urban areas at road tunnels and overpasses (individuals) | 4,000,000 VND | 6,000,000 VND |
| Erecting tents, stalls, or other structures illegally in urban areas at road tunnels and overpasses (organized) | 8,000,000 VND | 10,000,000 VND |
| Failure to provide adequate drainage or obstruction of the drainage system from road infrastructure structures (individual) | 4,000,000 VND | 6,000,000 VND |
| Failure to provide adequate drainage or obstruction of the drainage system from road infrastructure works (organization) | 8,000,000 VND | 10,000,000 VND |
| Demolition of advertising signs affecting road infrastructure (individual) | 4,000,000 VND | 6,000,000 VND |
| Demolition of advertising signs affecting road infrastructure (organization) | 8,000,000 VND | 10,000,000 VND |
| Construction and installation of advertising signs within the road safety corridor without written approval (individual) | 10,000,000 VND | 15,000,000 VND |
| Construction and installation of advertising signs within the road safety corridor without written approval (from an organization) | 20,000,000 VND | 30,000,000 VND |
| Failure to remove advertising signs upon request (individual) | 10,000,000 VND | 15,000,000 VND |
| Failure to remove advertising signs upon request (organization) | 20,000,000 VND | 30,000,000 VND |
| Do not remove or close the temporary connection point when the temporary connection period expires (individual) | 10,000,000 VND | 15,000,000 VND |
| Do not remove or close the temporary connection point when the temporary connection period expires (organization) | 20,000,000 VND | 30,000,000 VND |
| Failure to restore the road safety corridor to its original condition, failure to repair or supplement the affected road infrastructure (individual) | 10,000,000 VND | 15,000,000 VND |
| Failure to restore the road safety corridor to its original condition, failure to repair or supplement the affected road infrastructure (organization) | 20,000,000 VND | 30,000,000 VND |
| Occupying land belonging to roads or road safety corridors for the construction of residential houses (for individuals) | 15,000,000 VND | 20,000,000 VND |
| Occupying land belonging to roads or road safety corridors for the construction of housing (for organizations) | 30,000,000 VND | 40,000,000 VND |
| Unauthorized connection to main or branch roads (by individuals) | 15,000,000 VND | 20,000,000 VND |
| Unauthorized connection to main or branch roads (by organization) | 30,000,000 VND | 40,000,000 VND |
| Unauthorized dismantling, relocation, or alteration of road infrastructure (individuals) | 15,000,000 VND | 20,000,000 VND |
| Unauthorized dismantling, relocation, or alteration of road infrastructure (organization) | 30,000,000 VND | 40,000,000 VND |
| Construction and installation of advertising signs within the highway safety corridor (individual) | 15,000,000 VND | 20,000,000 VND |
| Construction and installation of advertising signs within the highway safety corridor (organization) | 30,000,000 VND | 40,000,000 VND |
| Failure to provide identification signs for privately owned infrastructure when installing it into shared road infrastructure (private) | 6,000,000 VND | 10,000,000 VND |
| Failure to provide identification signs for owned infrastructure when installing it into shared technical infrastructure with the road (organization) | 12,000,000 VND | 20,000,000 VND |
| Management, operation, exploitation, and maintenance of shared infrastructure with roads that affects road safety (individual) | 10,000,000 VND | 15,000,000 VND |
| Management, operation, exploitation, and maintenance of shared infrastructure with roads that affects road safety (organization) | 20,000,000 VND | 30,000,000 VND |
| Failure to relocate or dismantle shared technical infrastructure facilities upon request (individual) | 10,000,000 VND | 15,000,000 VND |
| Failure to relocate or dismantle shared technical infrastructure facilities when requested (organization) | 20,000,000 VND | 30,000,000 VND |
| Training facility for road safety inspectors lacks sufficient audio-visual equipment as required | 4,000,000 VND | 6,000,000 VND |
| Training facility for road safety inspectors lacks sufficient computers and equipment for measuring the reflectivity of road signs as required | 4,000,000 VND | 6,000,000 VND |
| Training facility for road safety inspectors without the required number of full-time lecturers | 4,000,000 VND | 6,000,000 VND |
| Road traffic safety inspector training facility using instructors who do not meet the required standards | 4,000,000 VND | 6,000,000 VND |
| Road traffic safety inspector training facility enrolls and trains students who do not meet the required standards | 8,000,000 VND | 10,000,000 VND |
| Road traffic safety inspector training facility fails to notify training plan and list of trainees before opening class as required | 8,000,000 VND | 10,000,000 VND |
| Road traffic safety inspector training facility providing training that does not comply with the announced framework program and training plan as prescribed | 8,000,000 VND | 10,000,000 VND |
| Road traffic safety inspector training facility recognizes exam results for those who did not take the exam or did not attend the training course | 8,000,000 VND | 10,000,000 VND |
| Road traffic safety inspector training facility fails to establish or establishes an examination board that does not comply with regulations | 8,000,000 VND | 10,000,000 VND |
| Road traffic safety inspector training facility fails to store and maintain student records as required | 8,000,000 VND | 10,000,000 VND |
| Road traffic safety inspector training facility fails to create, maintain, and preserve records and documents related to training as required | 8,000,000 VND | 10,000,000 VND |
| Business organizations providing road safety inspection services that are not independent from the construction unit or design consulting organization as prescribed | 20,000,000 VND | 30,000,000 VND |
| Businesses providing road safety inspection services that employ individuals without inspector certificates or with expired certificates | 20,000,000 VND | 30,000,000 VND |
| Business organizations providing road safety inspection services that fail to meet capacity requirements when inspecting Group C projects and road works currently in operation | 20,000,000 VND | 30,000,000 VND |
| Business organizations providing road safety inspection services that fail to meet capacity requirements when inspecting national key projects, Group A projects, and Group B projects | 30,000,000 VND | 40,000,000 VND |
| Construction work on roads currently in operation without warning devices installed on construction vehicles and machinery (by individuals) | 1,000,000 VND | 3,000,000 VND |
| Construction work on an operational road without installing warning devices on construction vehicles and machinery (organization) | 2,000,000 VND | 6,000,000 VND |
| Failure to submit traffic safety assurance measures before construction on an operational road (individual) | 1,000,000 VND | 3,000,000 VND |
| Failure to submit traffic safety assurance measures before construction on an operational road (organization) | 2,000,000 VND | 6,000,000 VND |
| Construction work within land designated for road infrastructure without proper traffic management measures (individual) | 3,000,000 VND | 5,000,000 VND |
| Construction work within land designated for road infrastructure without proper traffic management measures (organization) | 6,000,000 VND | 10,000,000 VND |
| Leaving construction materials, soil, rocks, or vehicles outside the construction area causing traffic obstruction (individual) | 3,000,000 VND | 5,000,000 VND |
| Leaving construction materials, soil, rocks, and vehicles outside the construction area causing traffic obstruction (organization) | 6,000,000 VND | 10,000,000 VND |
| Failure to immediately remove signs, barriers, vehicles, construction equipment, and materials after construction is completed (individual) | 3,000,000 VND | 5,000,000 VND |
| Failure to immediately remove signs, barriers, vehicles, construction equipment, and materials after construction is completed (organization) | 6,000,000 VND | 10,000,000 VND |
| Construction work on an operating road that fails to properly and fully implement traffic management measures, resulting in traffic congestion (individual) | 5,000,000 VND | 7,000,000 VND |
| Construction work on an operating road that fails to properly and fully implement traffic management measures, resulting in traffic congestion (organization) | 10,000,000 VND | 14,000,000 VND |
| Failure to provide traffic warning and guidance personnel during construction work on roads currently in operation (individual) | 5,000,000 VND | 7,000,000 VND |
| Failure to provide traffic warning and guidance personnel during construction work on an operational road (organization) | 10,000,000 VND | 14,000,000 VND |
| Construction work within land designated for road infrastructure where the construction permit or approval document has expired (individual) | 5,000,000 VND | 7,000,000 VND |
| Construction work within land designated for road infrastructure where the construction permit or approval document has expired (organization) | 10,000,000 VND | 14,000,000 VND |
| Construction work on an operating road without traffic warning lights and nighttime lighting (individual) | 7,000,000 VND | 10,000,000 VND |
| Construction work on an operating road without traffic warning lights and nighttime lighting (organized) | 14,000,000 VND | 20,000,000 VND |
| Construction on an operating road with temporary signs and barriers in place but not fully implemented (individual) | 7,000,000 VND | 10,000,000 VND |
| Construction on an operating road with temporary signage and barriers at the construction site but not adequately organized | 14,000,000 VND | 20,000,000 VND |
| Construction work within land designated for road infrastructure without a construction permit or written approval (individual) | 7,000,000 VND | 10,000,000 VND |
| Construction work within land designated for road infrastructure without a construction permit or written approval (from an organization) | 14,000,000 VND | 20,000,000 VND |
| Construction work on an operating road without a construction permit causing damage or destruction to the operating road infrastructure (individual) | 7,000,000 VND | 10,000,000 VND |
| Construction work on an operating road without a construction permit causing damage or destruction to the operating road infrastructure (organization) | 14,000,000 VND | 20,000,000 VND |
| Construction work on urban roads not completed within the time frame specified in the construction permit or approval document (individual) | 10,000,000 VND | 15,000,000 VND |
| Construction work on urban roads not completed within the time frame specified in the construction permit or approval document (organization) | 20,000,000 VND | 30,000,000 VND |
| Construction work on an operational road without adequate traffic management measures resulting in a traffic accident (individual) | 10,000,000 VND | 15,000,000 VND |
| Construction work on an operating road without fully implementing traffic management measures resulting in a traffic accident (organization) | 20,000,000 VND | 30,000,000 VND |
| Construction on an operational road without placing warning signs or temporary barriers at the construction site as per the construction permit or approval document (individual) | 10,000,000 VND | 15,000,000 VND |
| Construction on an operating road without placing warning signs or temporary barriers at the construction site as per the construction permit or approval document (organization) | 20,000,000 VND | 30,000,000 VND |
| Failure to relocate structures when requested by the competent road management authority or road manager/user as prescribed (individual) | 10,000,000 VND | 15,000,000 VND |
| Failure to relocate structures when requested by the competent road management authority or road manager/user as prescribed (organization) | 20,000,000 VND | 30,000,000 VND |
| Failure to relocate a structure when it affects road traffic safety (individual) | 10,000,000 VND | 15,000,000 VND |
| Failure to relocate structures when they affect road traffic safety (organization) | 20,000,000 VND | 30,000,000 VND |
| Failure to hand over the completed project, project completion documents, and maintenance procedures as required after the completion of road construction for compensation purposes (individual) | 10,000,000 VND | 15,000,000 VND |
| Failure to hand over the completed project, project completion documents, and maintenance procedures as required after the completion of road construction for compensation (organization) | 20,000,000 VND | 30,000,000 VND |
| Failure to reimburse or reimburse for affected road infrastructure that does not meet regulations (individual) | 10,000,000 VND | 15,000,000 VND |
| Failure to reimburse or reimburse affected road infrastructure in a manner that does not meet regulations (organization) | 20,000,000 VND | 30,000,000 VND |
| No road construction to compensate for or replace the affected part of the structure (individual) | 15,000,000 VND | 20,000,000 VND |
| No road construction will be built to compensate or replace the affected part of the structure (organization) | 30,000,000 VND | 40,000,000 VND |
| Grazing livestock on the roadside embankment (individual) | 100,000 VND | 200,000 VND |
| Tying livestock to markers, signs, fences, and other auxiliary structures of road infrastructure (individual) | 100,000 VND | 200,000 VND |
| Unauthorized lighting of fires on or under bridges; mooring of ships or boats under bridges or within the bridge safety corridor (individuals) | 300,000 VND | 400,000 VND |
| Unauthorized lighting of fires on or under bridges; mooring of ships or boats under bridges or within the bridge's safety corridor (by organizations) | 600,000 VND | 800,000 VND |
| Unauthorized embankment construction, pumping water across the road surface; placing water or sand pumps across the road, lighting fires on the road surface (individuals) | 300,000 VND | 400,000 VND |
| Unauthorized embankment construction, pumping water across the road surface; placing water or sand pumps across the road, lighting fires on the road surface (organized) | 600,000 VND | 800,000 VND |
| Organizations assigned to manage, operate, and maintain road transport infrastructure that fail to promptly supplement or repair hazard signs (organization) | 6,000,000 VND | 8,000,000 VND |
| Organization assigned to manage, operate, and maintain road transport infrastructure fails to detect or take timely preventive measures and report (organization) | 6,000,000 VND | 8,000,000 VND |
| Organization assigned to manage, operate, and maintain road transport infrastructure without placing water level markers at both ends of spillways and underpasses (organization) | 6,000,000 VND | 8,000,000 VND |
| Organizations entrusted with managing, operating, and maintaining road transport infrastructure that fail to implement traffic warning and regulation measures or prevent vehicles from passing through flooded sections of road (organization) | 6,000,000 VND | 8,000,000 VND |
| Damaging or rendering inoperable road drainage systems (individual) | 3,000,000 VND | 5,000,000 VND |
| Damaging or rendering ineffective the road drainage system (organization) | 6,000,000 VND | 10,000,000 VND |
| Unauthorized dismantling, moving, adjusting, damaging, misusing, or altering of traffic signs (individuals) | 3,000,000 VND | 5,000,000 VND |
| Unauthorized dismantling, moving, adjusting, damaging, misusing, or altering of traffic signs (by an organization) | 6,000,000 VND | 10,000,000 VND |
| Unauthorized demolition, dismantling of curbs or illegal repair and renovation of sidewalks (individuals) | 3,000,000 VND | 5,000,000 VND |
| Unauthorized demolition, dismantling of curbs or illegal repair and renovation of sidewalks (organized) | 6,000,000 VND | 10,000,000 VND |
| Illegal drilling, digging, and cutting of roads and sidewalks (individuals) | 5,000,000 VND | 7,000,000 VND |
| Illegal drilling, digging, and cutting of roads and sidewalks (organized) | 10,000,000 VND | 14,000,000 VND |
| Unauthorized demolition or damage to auxiliary structures attached to the road (individual) | 5,000,000 VND | 7,000,000 VND |
| Unauthorized demolition and damage to auxiliary structures attached to the road (organization) | 10,000,000 VND | 14,000,000 VND |
| Unauthorized removal or opening causing damage to manhole covers, underground structures, and tunnel systems on roads (individuals) | 5,000,000 VND | 7,000,000 VND |
| Unauthorized removal or opening causing damage to manhole covers, underground structures, and tunnel systems on roads (organization) | 10,000,000 VND | 14,000,000 VND |
| Blasting or mining of soil, sand, stone, gravel, or other minerals that affect the safety of road infrastructure (individual) | 5,000,000 VND | 7,000,000 VND |
| Blasting or mining of soil, sand, stone, gravel, or other minerals that affect the safety of road infrastructure (organization) | 10,000,000 VND | 14,000,000 VND |
| Lack of prescribed road operation, exploitation, and maintenance procedures, or failure to fully implement the contents of approved road operation, exploitation, and maintenance procedures (organization) | 5,000,000 VND | 7,000,000 VND |
| Unauthorized transfer of terminal card from one vehicle to another (personal) | 3,000,000 VND | 5,000,000 VND |
| Unauthorized transfer of terminal card from one vehicle to another (organization) | 6,000,000 VND | 10,000,000 VND |
| Destroying, falsifying, deleting data, or tampering with the content of a personal terminal card | 3,000,000 VND | 5,000,000 VND |
| Destroying, falsifying, deleting data, or tampering with the content of an end-user card (organization) | 6,000,000 VND | 10,000,000 VND |
| Opening or maintaining an anonymous or fraudulent traffic account (personal) | 3,000,000 VND | 5,000,000 VND |
| Opening or maintaining an anonymous or fraudulent traffic account (organization) | 6,000,000 VND | 10,000,000 VND |
| Failure to publicly display or post information at the toll station as required (organization) | 10,000,000 VND | 20,000,000 VND |
| Organizations that sell or check tickets in an untimely manner, harass ticket buyers; fail to sell all or limit the types of monthly and quarterly tickets as prescribed (organizations) | 10,000,000 VND | 20,000,000 VND |
| Receiving cash from road transport users without issuing tickets or issuing tickets of the wrong type (organization) | 10,000,000 VND | 20,000,000 VND |
| Failure to follow proper procedures, resulting in road vehicles (subject to ticket purchase requirements) passing through the toll station without a ticket (by the organization) | 10,000,000 VND | 20,000,000 VND |
| Failure to properly implement the prescribed procedures for managing and operating the toll station, resulting in traffic accidents involving vehicles passing through the toll station (individuals) | 10,000,000 VND | 20,000,000 VND |
Not performed

ai-luatvietnam-icon-24 Change analysis

Found 644 posts Export list to Excel