Layout & language AEN
Sign in
Posted date: 10-Sep-2025 6:37:28 AM VN
Some new points of the:

Decree No. 53/2024/NĐ-CPstatus2 - New regulations on water resource exploitation and protection

on replacing of:
  • Decree No. 167/2018/NĐ-CP⛔ - Regulations on restriction on groundwater extraction
  • Decree No. 43/2015/NĐ-CP⛔ - Regulations on establishment and management of water source protection corridors
  • Decree No. 120/2008/NĐ-CP⛔ - Regarding river basin management
  • Decree No. 112/2008/NĐ-CP⛔ - Regulations on the exploitation of hydro-power reservoirs
Effective date: 01-Jul-2024
What's new
Decree No. 53/2024/ND-CP (Decree No. 53/2024/ND-CP) introduces the following new regulations, which are not included in Decree No. 112/2008/ND-CP, Decree No. 120/2008/ND-CP, Decree No. 43/2015/ND-CP, Decree No. 167/2018/ND-CP:
Real-time monitoring of water resource exploitation (Article 3*): Definition and requirements for monitoring water resource exploitation by automatic monitoring devices, transmitting data online and continuously in real time.
Sub-river basin (Article 3*): Definition of the concept of "Sub-river basin" and its role in water resource management.
Shore edges of rivers, streams, canals, ditches and canals (Article 3*): Clear definition of "Shore edge" and how to determine it in different cases (embankments, lagoons, lagoons, ponds, lakes).
River bank (Article 3*): Clear definition of "river bank" and how to define the scope.
Riverbed (Article 3*): Clear definition of "riverbed".
Groundwater exploitation works (Article 3*): Definition of the concept of groundwater exploitation works.
Functions of the water source protection corridor (Article 3*): List in detail the functions of the water source protection corridor, as a basis for determining the scope and management of the corridor.
Development of water source scenarios and systems of decision-making support tools (Article 8*): Regulations on development of water source scenarios and systems of decision-making support tools for water resource regulation and distribution.
Conditions for real-time operation of reservoirs and inter-reservoirs (Article 50*): Specific regulations on technical infrastructure and requirements for real-time operation of reservoirs and inter-reservoirs.
Regulations on the formulation and adjustment of real-time reservoir and inter-reservoir operation processes (Article 51*): Regulations on the formulation and adjustment of operation processes based on technical infrastructure to ensure real-time operating conditions.
Responsibility for building a system of decision-making support tools for regulating and distributing water resources on the basis of digital technology (Article 46*): Requirements and responsibilities for building a system of decision-making support tools.
Water source status framework (Article 42*): Classification of water source status (normal, water shortage, severe water shortage) and corresponding response measures.
Water resource exploitation quota (Article 42*): Regulations on deciding on water resource exploitation quotas.
Requirements for information and data for the formulation and publication of water source scenarios in river basins (Article 41*): Detailed requirements for information and data.
List of inter-provincial river basins subject to general planning (Article 20*): List in detail the inter-provincial river basins subject to general planning.
Measurement of river and stream cross-sections (Article 8*): Regulations on periodic measurement of river and stream cross-sections to serve water resource management.
Assessment of landslides in beds, banks and river banks (Article 8*): Regulations on the assessment of landslides in rivers, banks and rivers to serve the management.
Investigation and survey in service of formulation and adjustment of groundwater protection plans and water source protection corridors (Article 8*): Regulations on investigation and survey activities for the formulation of groundwater protection plans.
Water sources subject to protection corridors (Article 21*): Detailed regulations on types of water sources subject to protection corridors.
Showing the scope of the water source protection corridor on the cadastral map (Article 27*): Regulations on showing the scope of the corridor on the cadastral map.
Roadmap for implementation of water resources accounting (Article 75*): Clearly define the roadmap for implementation of water resources accounting in the periods to 2027, 2030 and 2035.
Coordinating and supervising activities of exploitation, use and protection of water resources, prevention, control and remedy of harms caused by water (Article 67*): Specific contents and requirements.
Changes
Decree No. 53/2024/ND-CP (Decree No. 53/2024/ND-CP) has significant changes compared to previous provisions in Decree No. 112/2008/ND-CP, Decree No. 120/2008/ND-CP, Decree No. 43/2015/ND-CP, Decree No. 167/2018/ND-CP:
Basic survey of water resources (Article 4*):
◦ Changes in requirements for basic survey activities: emphasizing inheritance, thrift, budget efficiency and updating data in the National Water Resources Information System and Database.
Investigation and assessment of water resources (Article 5*):
◦ Clearly delineate the responsibilities of the Ministry of Natural Resources and Environment and provincial-level People's Committees in organizing the investigation and assessment of water resources.
Water Resources Inventory (Article 6*):
◦ Supplementing regulations on the Ministry of Natural Resources and Environment proposing the Prime Minister to consider and decide on the inventory of a number of indicators with major changes or proposing the use of the results of the preceding inventory period.
Report on national water resources and report on exploitation and use of water resources (Article 7*):
◦ Providing more detailed regulations on the content of reports, responsibilities for making reports of ministries, sectors and localities.
General provisions on formulation, appraisal, approval and adjustment of specialized technical plannings on water resources (Article 10*):
◦ Clearer regulations on the composition of the appraisal council and the time for formulation of planning tasks.
Dossier of submission for planning approval (Article 18*):
◦ Request for additional strategic environmental assessment reports for the inter-provincial river basin master plan.
Review and adjustment of planning (Article 19*):
◦ More specific regulations on cases of partial adjustment of the inter-provincial river basin planning.
Scope of water source protection corridors for rivers, streams, canals and canals (Article 24*):
◦ Adjust and clarify the scope of water source protection corridors, especially in cases with different functions, embankments, dikes, railways, roads and waterways.
Formulation, announcement and adjustment of the list of water sources subject to the establishment of protection corridors (Article 26*):
◦ Provide more detailed regulations on the content of the List, the process of preparation, consultation, approval and publication.
Planting of water source protection corridor markers for dams, hydropower and irrigation reservoirs (Article 28*):
◦ Specific regulations on types of hydropower reservoirs subject to landmarking, plans for landmark planting, order of appraisal and approval procedures and funding for implementation.
Planting of water source protection corridor markers for other water sources (Article 29*):
◦ Clearly stipulate the conditions for marker planting, the contents of the landmark planting plan and the implementation fund.
Determination of groundwater extraction threshold (Article 32*):
◦ Supplementing regulations on groundwater exploitation thresholds expressed in the limit of the amount of water that can be exploited by each aquifer and the limit of the exploited water level.
◦ Detailed regulations on the extraction water level limit of aquifers in different areas.
Classification of prohibited zones and restricted areas for groundwater exploitation (Article 33*):
◦ More detailed classification of restricted zones (Restriction 1, Restriction 2, Mixed Restriction) and zoning criteria.
Principles for zoning of prohibited zones and restricted areas for groundwater exploitation (Article 34*):
◦ Supplementing the principle "Do not expand the scope of zoning of areas where groundwater exploitation is prohibited and restricted beyond the scope specified in this Decree".
Accounting of water resources (Articles 70-75*):
◦ Decree No. 53/2024/ND-CP more specifically stipulates the roadmap and responsibilities for water resources accounting, an important activity to assess the economic value of water resources and use them effectively.
Regulation and distribution of water resources (Articles 40 - 46*):
*Decree No. 53/2024/ND-CP has more specific and detailed regulations on water source scenarios, plans, plans for regulating and distributing water resources, conditioning activities, water source status framework and responsibilities of stakeholders.
National water resources information system and database (Articles 76-84*):
◦ Decree No. 53/2024/ND-CP has more specific regulations on components, information, data and responsibilities for building, managing and operating the national water resources information system and database.
Regulations on monitoring and supervision of water resources and water quality (Articles 85-94*):
◦ Decree No. 53/2024/ND-CP has more detailed regulations on regimes, parameters, norms for water resources monitoring, objects, forms of monitoring and exploitation and requirements for measuring, connecting and transmitting data.
Removal points
Decree No. 53/2024/ND-CP (Decree No. 53/2024/ND-CP) no longer mentions a number of provisions in Decree No. 112/2008/ND-CP, Decree No. 120/2008/ND-CP, Decree No. 43/2015/ND-CP, Decree No. 167/2018/ND-CP, which means that these provisions have been abolished or replaced:
• Solutions to overcome consequences caused by sand and gravel mining (from Decree 23/2020/ND-CP): Specific regulations on construction and non-construction solutions to overcome problems caused by sand and gravel mining have been removed. This may imply that these solutions will be stipulated in another document or under general regulations on environmental protection and natural disaster prevention and control.
• Financial obligations for water resource use and exploitation activities (from Decree 112/2008/ND-CP): Regulations on financial obligations for water resource use and exploitation activities have been eliminated, possibly because they have been specified in other legal documents on natural resource taxes and charges.
• River basin office (from Decree 120/2008/ND-CP): The establishment and operation of river basin offices are no longer regulated.
• Organizational structure of the River Basin Committee (from Decree 120/2008/ND-CP): There are no more detailed regulations on the organizational structure of the River Basin Committee.
• Principles of coordination of operation in the flood and dry seasons; responsibilities of units, management and operation of dams and relevant local authorities (from Decree 112/2008/ND-CP): Decree No. 53/2024/ND-CP focuses more on real-time inter-reservoir operation processes, emphasizing flexibility and efficiency based on data and decision-making support tools, while discarding general principles.

ai-luatvietnam-icon-24 Change analysis

Found 644 posts Export list to Excel