Guidelines on method of formulation of electricity generation cost frame
Circular No. 57/2014/TT-BCT dated December 19, 2014 of the Ministry of Industry and Trade regulations on method and sequence of formulation and issuance of electricity generation cost frame
Posted: 25/12/2014 2:56:12 PM | Latest updated: 18/2/2025 2:12:29 PM (GMT+7) | Newsletter #:3640
Effective: 3-Feb-2015
Status: Expired on: 1-Feb-2025
This Circular regulates method and sequence of formulation and issuance of electricity generation cost frame.This Circular applies to generating units in possession of power plants connected to the national electricity system with total installed capacity more than 30 MW, power plants with installed capacity from 30 MW and under volunteering to join electricity market except multi-target strategic hydropower plants, oil-fired power plants, independent power plants using renewable energy (wind, geothermal heat, tides and biomass) and other power plants with private mechanism regulated by the Prime Minister, The Ministry of Industry and Trade or competent state management agencies
This Circular takes effect since February 03rd, 2015. To annul the provisions provided in Articles 3, 4, 5, 6, 7, 17, 18, Clause 1 Article 24, Clause 1 Article 25 of Circular No. 41/2010/TT-BCT⛔ dated December 14, 2010.
Effective notes
- See more the amendments, supplements at Circular No. 13/2017/TT-BCT⛔ dated August 3rd, 2017, Circular No. 57/2020/TT-BCT⛔ dated December 31st, 2020 and Circular No. 31/2022/TT-BCT⛔ dated November 8th, 2022.
- Article 4 of this Circular shall be abrogated from December 28th, 2022, according to the regulations at Circular No. 31/2022/TT-BCT⛔ dated November 8th, 2022.
- This Circular shall be expired from February 1st, 2025, replaced by Circular No. 09/2025/TT-BCT⚠️ dated February 1st, 2025.