Please sign in or register an account to view the full version.
Regulation on solid waste landfills
Circular No. 76/2025/TT-BNNMT dated 29/12/2025 of the Ministry of Agriculture and Environment on the promulgation of the National Technical Regulation on solid waste landfills (9 pages)
Posted: 5/1/2026 3:08:50 PM | Latest updated: 8/1/2026 10:27:25 AM (GMT+7) | Newsletter #:6359
Effective: 29-Jun-2026
Status: No amendments
The following are important and notable points in this Circular:
• Promulgating the National Technical Regulation on solid waste landfills (Article 1): This Circular promulgates the National Technical Regulation on solid waste landfills, code QCVN 96:2025/BNNMT. This defines a new technical standard that activities related to solid waste landfills must comply with.
• Technical and environmental protection requirements for solid waste landfills (Section 1.1.1): The regulation specifies the technical and environmental protection requirements that solid waste landfills must meet. This directly affects the cost of investment, operation and management of landfills.
• Subjects of application of the Regulation (Section 1.2): The Regulation applies to state agencies, organizations and individuals investing, building, operating and managing solid waste landfills and other relevant organizations and individuals. This determines the scope of subjects subject to the regulation of the Regulation.
• Requirements for selection of landfill sites (Section 2.1): The location must be in accordance with the planning, must not be located in water source protection corridors, sanitary protection zones, flooded areas and must ensure an environmentally safe distance. This limits location options and can increase the cost of finding the right location.
• Requirements for the design and construction of landfills (Section 2.2): Detailed regulations on rainwater collection systems, leachate, exhaust gas treatment, groundwater monitoring and maximum height of landfills. This affects the technical design and cost of landfill construction.
• Landfill Operation Requirements (Section 2.3): Regulations on waste spreading, compaction, covering, periodic inspections, operation logs, and odour mitigation measures. This affects the operational process and the cost of landfill management.
• Landfill closure requirements (Section 2.4): Regulations on mulch, slope and buffer when closing landfills. This affects the cost and process of closing the yard.
• Requirements for groundwater quality monitoring (Section 2.5): Regulations on the frequency and parameters of groundwater quality monitoring. This affects monitoring costs and reporting responsibilities.
• Effective time of Circular (Article 2): The Circular takes effect from June 29, 2026. All solid waste landfill construction, operation and management activities from this point forward need to comply with the new regulations.
• Transitional regulations for ongoing establishments and projects (Article 3):
◦ Landfills in operation or under construction: Continue to operate to the approved capacity if the construction acceptance test is completed before 31/12/2028, but must comply with the regulations on operation (Section 2.3) and closure (Section 2.4) of QCVN 96:2025/BNNMT (Article 3.1.a).
◦ Landfills of ongoing projects: If the construction acceptance test is completed after 01/01/2029, it must meet all the requirements of QCVN 96:2025/BNNMT, except for the requirement on site selection (Section 2.1) (Article 3.1.b).
◦ New landfills of investment projects: Deployed and constructed after the effective date of the Circular must apply all provisions in QCVN 96:2025/BNNMT (Article 3.2).
◦ Early application is encouraged: Establishments and projects that are being implemented are encouraged to apply QCVN 96:2025/BNNMT from the effective date of the Circular (Article 3.3).
The Circular takes effect from June 29, 2026.
Related document |
|
| Please sign in or register an account to view this information | |
Files attachment |