Layout & language BEN
Sign in

red-check Regulations on project development and sample of electricity sale contract applicable to solar power projects English attachment

Circular No. 18/2020/TT-BCT dated July 17th, 2020 of the Ministry of Industry and Trade on project development and sample of electricity sale contract applicable to solar power projects
Posted: 28/7/2020 7:41:27 AM | Latest updated: 31/1/2023 8:30:27 AM (GMT+7) | Newsletter #:5013
Effective: 31-Aug-2020 Status: Added and/or amended

LuatVietnam This Circular prescribes development of grid-connected solar power projects, rooftop solar power system and sample of electricity sale contract applicable to grid-connected solar power projects and rooftop solar power system in Vietnam.

This Circular takes effect from August 31st, 2020 and replaces Circular No. 16/2017/TT-BCT⛔ dated September 12th, 2017 and Circular No. 05/2019/TT-BCT⛔ ated March 11th, 2019.

Amendement notes
  • Please be informed that the attached forms are neither translated nor included in the English file.
  • See more the abrogation of some regulations of this Circular at Circular No. 01/2023/TT-BCT dated January 19th, 2023.

Related document

Please sign in or register an account to view this information

Files attachment