red-check Procedures for project appraisal and acceptance of construction works in Ho Chi Minh City from 7/10/2023

Quyết định số 4588/QĐ-UBND ngày 7/10/2023 của UBND TP. HCM về việc công bố danh mục thủ tục hành chính lĩnh vực Hoạt động xây dựng; Quản lý chất lượng công trình xây dựng thuộc phạm vi chức năng quản lý của Sở Xây dựng (8 trang)
Posted: 9/10/2023 12:44:52 PM | Latest updated: 18/9/2024 2:30:27 PM (GMT+7) | Newsletter #:5801
Effective: 7-Oct-2023 Status: Added and/or amended

LuatVietnam This Decision replaces 03 procedures under the jurisdiction of the Department of Construction of Ho Chi Minh City, applicable from October 7, 2023, including:

1. Appraisal of construction designs implemented after basic design/adjustment of construction designs implemented after basic design

2. Appraisal of the construction investment feasibility study report/adjustment of the construction investment feasibility study report

3. Inspection of the acceptance of work completion by local construction agencies

For details, see the instructions in the attached Appendix.

The Decision takes effect from the date of signing.

To annul the contents of disclosure for procedures with the order A.A1. I.1, A.A1. I.2, B.B1. I.1 in the List of administrative procedures issued together with Decision No. 4261/ QD-UBNDstatus2 dated September 23, 2023.

Amendement notes
  • Annulment of the announcement of procedures in the order of I.1 and I.2 in the list of administrative procedures issued together with this Decision from December 27, 2023, according to the provisions of Decision No. 5964/ QD-UBNDstatus2 dated December 27, 2023.
  • To annul the contents of disclosure for orderly procedures II.1 in the list of administrative procedures issued together with this Decision from September 18, 2024, according to the provisions of Decision No. 3849/ QD-UBND dated September 18, 2024.