VNENSign in

stop-check Procedures for issuance of permits for circulation of fire-resistant materials and components English attachment

Decision No. 68/ QD-BXD⛔ dated January 16, 2026 of the Ministry of Construction on the announcement of newly issued administrative procedures in the field of construction materials within the scope of state management of the Ministry of Construction (10 pages)
Posted: 28/1/2026 12:50:42 PM | Latest updated: 7/5/2026 2:47:55 PM (GMT+7) | Newsletter #:6376
Effective: 16-Feb-2026 Status: Expired on: 4-May-2026
This Decision is announced with guidance on procedures for issuance of licenses for circulation of fire prevention and fire-resistant materials and components (based on the provisions of Decree No. 105/2025/ND-CP⚠️ and Circular No. 63/2025/TT-BXD).
The detailed content is as follows:
1. Procedure:
• a) Submission of dossiers: Organizations and individuals shall submit dossiers of application for circulation permits to specialized construction agencies in provinces and cities.
• b) Receipt of dossiers:
◦ Submit 01 set of dossier in the form of: directly; online through the public service portal; or via postal service.
◦ The receiving department checks the composition and validity of the dossier.
◦ Handling of cases:
◦ Complete and valid dossier: receive and make an appointment to return the results.
◦ Missing or invalid dossiers: instructions to supplement, complete or refuse to receive (with a request or rejection form).
◦ For dossiers submitted through the public service portal: receive and notify or request for correction and supplementation within 08 working hours.
• c) Processing of dossiers:
◦ Within 05 working days from the date of receipt of a complete and valid dossier, the specialized construction agency shall consider and grant a circulation permit (according to Form No. 03). The license is an electronic version and a paper copy (the paper version is only issued when applying online).
◦ In case of refusal to grant a license, a written reply clearly stating the reason is required.
2. How to do it:
• Submit directly at the Public Administration Service Center in the province or city.
• Via public postal services.
• Online via the Public Service Portal.
3. Composition, number of dossiers:
• a) Components of the dossier:
◦ For domestically produced and assembled materials and components:
◦ Written application for a license (Form 01).
◦ Test results are in accordance with standards and regulations.
◦ Factory certificate.
◦ Technical documents (if any).
◦ For imported materials and components:
◦ Written application for a license (Form 02).
◦ Certification of quality, test results of conformity with standards and regulations (carried out by foreign testing organizations accredited by ISO/IEC 17025; in case there are no test results of foreign testing organizations, test results conducted by Vietnamese conformity assessment organizations may be used in accordance with the law on product quality products and goods and the law on standards and technical regulations.).
◦ Certificate of origin.
◦ Technical documents (if any).
• b) Number of dossiers: 01 set (electronic dossier or paper dossier - original or photocopy enclosed with the original for comparison).
4. Processing time: 05 working days from the date of receipt of a complete and valid dossier.
5. Subjects of implementation: Organizations and individuals.
6. Agency:
• Competent agencies: Specialized construction agencies in provinces and cities.
• Agencies directly addressing: Specialized agencies in charge of construction in provinces and cities.
7. Result: License for circulation of materials and components (Form No. 03).
8. Fees and charges: None.
9. Name of application form, declaration, result:
• Form 01: Application for a license (for domestically produced materials).
• Form 02: Information on imported materials.
• Form 03: Circulation permit.
10. Requirements and conditions: Documents are valid as prescribed.
The Decision takes effect from February 16, 2026.
 
Effective notes
Expire from May 4, 2026, replaced by Decision No. 649/ QD-BXD dated May 4, 2026.

Related document

Please sign in or register an account to view this information

Files attachment