New regulations on technical requirements for power transmission and distribution systems
This Circular details the Law on Electricity in 2024 on: technical requirements in the power transmission system and power distribution system; conditions, technical requirements and connection order; operating the power transmission system and power distribution system; requirements for the system of metering, collection of metering data and system of management of metering data; responsibilities of units.
The Circular takes effect from February 1, 2025.
Replacing Circular No. 25/2016/TT-BCT⛔ dated 30/11/2016, Circular No. 30/2019/TT-BCT⛔ dated 18/11/2019, Circular No. 39/2015/TT-BCT⛔ dated 18/11/2015, Circular No. 39/2022/TT-BCT⛔ dated 30/12/2022, Circular 42/2015/TT-BCT⛔ dated 01/12/2015.
Related document |
|
| Please sign in or register an account to view this information | |
Files attachment |