Layout & language BEN
Sign in

red-check New regulations on technical requirements for power transmission and distribution systems

Circular No. 05/2025/TT-BCT dated February 1, 2025 of the Ministry of Industry and Trade regulating the system of power transmission, electricity distribution and electricity metering (203 pages)
Posted: 14/2/2025 10:02:55 AM | Latest updated: 18/8/2025 4:52:19 PM (GMT+7) | Newsletter #:6137
Effective: 1-Feb-2025 Status: Added and/or amended

LuatVietnam This Circular details the Law on Electricity in 2024 on: technical requirements in the power transmission system and power distribution system; conditions, technical requirements and connection order; operating the power transmission system and power distribution system; requirements for the system of metering, collection of metering data and system of management of metering data; responsibilities of units.

The Circular takes effect from February 1, 2025.

Replacing Circular No. 25/2016/TT-BCT⛔ dated 30/11/2016, Circular No. 30/2019/TT-BCT⛔ dated 18/11/2019, Circular No. 39/2015/TT-BCT⛔ dated 18/11/2015, Circular No. 39/2022/TT-BCT⛔ dated 30/12/2022, Circular 42/2015/TT-BCT⛔ dated 01/12/2015.

Amendement notes
See more amendments and supplements in Circular No. 46/2025/TT-BCT dated August 6, 2025.

Related document

Please sign in or register an account to view this information

Files attachment