Some amends and supplements of the
Circular No. 16/2025/TT-BCT⛔ - New regulations on registration to participate in the electricity market from February 1, 2025
within:
Effected from: 03-Jun-2025
New additions
◦ Article 3, Clause 1, Point b (amended Clause 2, Article 3 of Circular 16): Add a clear definition of "The amount of electricity output operated and mobilized corresponds to the maximum level according to the gas supply capacity..." in the concept of "undertaking".
◦ Article 3, Clause 2 (supplement Clause 19a, Article 3 of Circular 16): Add a specific definition of "Gas-fired thermal power plants are required to make maximum use of gas fuel sources", along with citations to relevant Decrees.
◦ Article 132, Clause 4 (supplement Clause 4, Article 132 of Circular 16): Clearly stipulates the responsibility of Vietnam Electricity Group or the electricity wholesaler in providing data on consumption to the Power System Operator and the electricity market.
◦ Article 132, Clause 5 (supplement Clause 5 Article 132 of Circular 16): Clearly stipulates the responsibilities of Power Generation Units and Fuel Supply Units in providing data on gas supply capacity and fuel requirements of Thermal Power Plants that are required to use maximum gas fuel sources for the Power System Operator and the electricity market.
◦ Article 133, Clause 4a (supplement Clause 4a, Article 133 of Circular 16): Specific regulations on the roadmap and mobilization methods for hydropower plants operating in coordination with multi-purpose strategic hydropower plants during the period of not directly participating in the electricity market (before June 1, 2026).
◦ Article 1, Clause 22: Add Appendix VI to Circular No. 16/2025/TT-BCT
◦ Article 1, Clause 17 (supplement Clause 4a, Article 133 of Circular 16): During the period of not directly participating in the electricity market, these hydropower plants are mobilized as power plants indirectly participating in the electricity market.
### Changes
| Focus | Old | New |
|---|---|---|
| Scope of adjustment of hydropower plants | b) Power plants with a designed capacity of 10 MW or more whose power purchase contracts based on avoided costs expire, including cascade (for hydropower) and power plants using other renewable energy... Article 4, clause 1 | b) Power plants with an installed capacity of 10 MW or more whose power purchase contracts based on avoided costs expire, including cascade hydropower plants and power plants using other renewable energy... Article 4, clause 1 |
| Type of BOT factory | This phrase is not included in the amendment Article 4, Clause 1 | "Design capacity" is changed to "Installed capacity" Article 4, Clause 1 |
| BOT plant type | Thermal power plants are required to make maximum use of gas fuel sources and are allowed by competent state agencies to indirectly participate in the electricity market; Article 4, paragraph 3 | Gas-fired thermal power plants are required to make maximum use of gas fuel sources Article 4, paragraph 3 |
| Scope of application of Article 11 | ...not completing registration to participate in the electricity market, power plants without a Power Purchase Agreement... Article 11, Clause 1 | ...not completing registration to participate in the electricity market (except for hydropower plants that coordinate operations with multi-purpose strategic hydropower plants as prescribed in Clause 4a, Article 133 of this Circular), power plants without a Power Purchase Agreement... Article 11, Clause 1 |
| Order of mobilization when overloaded, surplus source | a) Reduce the generating capacity of thermal power plants with variable costs in order from high to low Article 18, clause 3 | a) Reduce the generating capacity of thermal power plants with variable costs in order from high to low, except for thermal power plants of gas-fired thermal power plants that are required to make maximum use of gas fuel sources Article 18, clause 3 |
| Order of mobilization in case of overload or excess power | e) Reducing part or all of the wind power plant, grid-connected solar power plant (except for power plants under Point h, Clause 3 of this Article);... Article 18, Clause 3 | e) Reducing part or all of the wind power plant, grid-connected solar power plant (except for power plants under Point k, Clause 3 of this Article);... Article 18, Clause 3 |
| Order of mobilization when overloaded, excess source | Add more lines | g) Reduce the generation capacity of thermal power units of gas-fired thermal power plants that are required to use gas fuel to the maximum; h) Stop thermal power units of gas-fired thermal power plants that are required to use gas fuel to the maximum with variable costs in order from highest to lowest; Article 18, Clause 3 |
| Order of mobilization in case of overload or excess source | Proportional reduction | 4. For generators of power plants belonging to the same group at points e, g, i and k, Clause 3 of this Article, the reduction of generating capacity is carried out according to the principle of evenly distributing the capacity to be reduced according to the ratio of rated capacity, available capacity, announced capacity or forecast capacity (depending on the type of power source and dispatch method), regardless of price criteria Article 18, Clause 4 |
| Constraints in power system operation | Guarantee constraints | Constraints on underwriting Article 19, Clause 2 |
| Amendment and supplement to Article 32 | - Solutions to ensure stable, safe and reliable operation of the power system | - Solutions to ensure stable, safe and reliable operation of the power system. Water value and optimal water level of cascade hydropower plants and hydropower plants with reservoirs regulating for 2 or more days per week in the coming month; Article 42, Clause 1 |
### Abolished or expired
◦ Article 2, Clause 1: Abolish point c, Clause 1, Article 17 of Circular 16.
◦ Article 2, Clause 2: Abolish Clause 15, Article 54 of Circular 16.
◦ Article 2, Clause 3: Abolish Clause 15, Article 60 of Circular 16.
◦ Article 2, Clause 4: Abolish Clause 9, Article 13, Appendix II issued with Circular 16.
### General comments on the impact of the difference
◦ Focus on Gas-fired Power Plants: The amendments and supplements mainly focus on clarifying and prioritizing gas-fired power plants that are bound to make maximum use of gas fuel sources. This demonstrates efforts to ensure the utilization of domestic gas resources and optimize the operation of gas-fired power plants.
◦ Specifying and detailing regulations: Circular 36/2025/TT-BCT adds more detailed definitions and regulations, making the implementation and supervision of the electricity market clearer and more effective.
◦ Priority of power supply and system stability: Amendments to the order of power mobilization in case of overload and excess power show high priority for ensuring stable and reliable power supply for the system, especially in the context of increasing participation of renewable energy sources.
◦ Impact on market operations: These changes may affect market electricity prices and payments for power plants, especially gas-fired power plants. Relevant entities need to be aware of the new regulations to ensure compliance and optimize their operations in the electricity market.
◦ More flexibility in dispatching Modifications from "design capacity" to "installed capacity" or the requirement to sign additional contract appendices will help the operating unit operate more easily by closely monitoring the actual electrical equipment.
Hope this analysis provides you with insight and useful information!
Posted date: 23-Oct-2025 23 2025 3:25PM
VN
Some new points of the:
Circular No. 16/2025/TT-BCT⛔ - New regulations on registration to participate in the electricity market from February 1, 2025
on replacing of:
- Circular No. 21/2024/TT-BCT⛔ - Regulations on registration to participate in the electricity market, applicable from 25/11/2024
Effective date: 01-Feb-2025
What's new
The following provisions are completely new, only in Circular No. 16/2025/TT-BCT and not in Circular No. 21/2024/TT-BCT:
◦ Article 2. Applicable subjects: Add the applicable subjects as "6. Large electricity users participating in the direct electricity purchase and sale mechanism."
◦ Article 4. Responsibilities of power generation units in participating in the electricity market:
◦ Clause 1.a: Add "(including BOT power plants whose contracts have expired and are transferred to Vietnam, hydropower plants jointly operated with multi-purpose strategic hydropower plants as prescribed in Point b, Clause 4, Article 51 of the Electricity Law)".
◦ Clause 1.c: Add "Renewable energy power plants participating in the direct electricity trading mechanism through the national grid".
◦ Clause 3.h: Add "Hydropower plants operating under the avoided cost mechanism with valid contracts".
◦ Article 11. Mobilizing power plants that have not directly participated in the electricity market: Clearly stipulates the cases and methods of mobilizing power plants that have not completed registration to participate in the electricity market, do not have a power purchase contract, do not have an electricity price, or do not have an agreement on a commercial operation date.
◦ Article 17. Determination of contracted electricity output: Detailed regulations on determining contracted electricity output, especially in cases where the payment output ratio according to the contract price cannot be agreed upon, adjusting the contracted electricity output per month/cycle.
◦ Article 18. Principles of operation and mobilization of power sources when overload or excess power occurs: Specific regulations on the order of reducing mobilization of different types of power plants when overload or excess power occurs in the power system.
◦ Article 29. Determining the minimum annual and minimum monthly contracted electricity output for thermal power plants with power purchase contracts with Vietnam Electricity Group:
◦ Clause 1.b: Supplement "For thermal power plants, offshore wind power plants, and new energy power plants that are subject to the long-term minimum contract power output mechanism according to the Regulations on power development planning, power grid development plans, investment in power project construction and bidding to select investors for power business projects and the Regulations on renewable energy and new energy power development issued by the Government shall be implemented as follows:
◦ Determine the total minimum contract electricity output for year N as prescribed in Point a of this Clause;
◦ In case the total minimum contracted electricity output in year N is lower than the long-term minimum contracted electricity output, the total minimum contracted electricity output in year N is adjusted to the long-term minimum contracted electricity output specified in the power purchase contract.
◦ Clause 2.c: Supplement "For thermal power plants, offshore wind power plants, new energy power plants that are subject to the long-term minimum contract power output mechanism according to the Regulations on power development planning, power grid development plans, investment in power project construction and bidding to select investors for power business projects and the Regulations on development of renewable energy and new energy power issued by the Government shall be implemented as follows:
◦ Determine the minimum contract electricity output for month M in year N according to the provisions at points a and b of this clause;
◦ In case the total minimum contract output of month M in year N is lower than the long-term minimum contract output determined for month M, the total minimum contract electricity output of month M in year N will be adjusted by the corresponding long-term minimum contract electricity output determined in the power purchase contract (if any).
◦ Article 50. Bidding for groups of cascade hydropower plants: Detailed regulations on the bidding method for groups of cascade hydropower plants, including the designation of a representative bidding unit.
◦ Article 71. Payment for exported and imported electricity:
◦ Payment regulations for exported and imported electricity according to contract.
◦ Article 74. Responsibility for collecting and managing metering data in the electricity market:
◦ Clearly stipulate that the power system and electricity market operators synchronize and send metering data to the shared metering data warehouse of Vietnam Electricity Group.
◦ Article 77. Confirmation of electricity output according to meter readings:
◦ Requires digital signature to verify meter readings.
◦ Article 88. Electricity output of power plants serving payment in the electricity market:
◦ Clause 1.a: Add "(Qbp)".
◦ Clause 2.c: "In case there is no dispatch order in transaction cycle i, Qdd is determined according to the formula: Qddi = Average mobilized capacity (MW) x ∆T",
◦ Detailed regulations on calculating the difference in generated electricity output compared to the output mobilized according to the dispatch order.
◦ Article 89. Adjusting the electricity output of power plants for payment in the electricity market: Stipulates the principles for adjusting the additional electricity output (Qconi) and the electricity output paid according to the offered price for plants with an offered price higher than the ceiling price of the electricity market (Qbpi).
◦ Article 99. Payment for renewable energy power plants directly participating in the electricity market:
◦ Regulations on payment for renewable energy power plants participating in the electricity market, including cases with power purchase contracts with large electricity users participating in the direct power purchase mechanism and cases not participating in the direct power purchase mechanism.
◦ Article 111. Handling of payment errors:
◦ Regulations for handling payment errors.
◦ Article 131. Regulations on duties, powers and responsibilities of the Electricity Market Transaction Operation Engineer:
### Changes
Below is a comparison table of changes between Circular No. 16/2025/TT-BCT and Circular No. 21/2024/TT-BCT for provisions with differences:
| Focus | Old (Circular 21/2024/TT-BCT) | New (Circular 16/2025/TT-BCT) |
|---|---|---|
| Explanation of terms (Article 3) | - The number of explained terms is less.- There is no term "Direct electricity trading mechanism, state electricity management agency, large electricity customers, load block, exceeding gas fuel limit,..." | - The number of explained terms is more, adding important terms such as: "Direct electricity trading mechanism, state electricity management agency, large electricity customers, load block, exceeding gas fuel limit,..." |
| Subjects of application (Article 2) | Applicable to units participating in the electricity market such as: Electricity wholesale buyers, power generation units, Power system and electricity market operators, power transmission units, Vietnam Electricity Group | Add the subject "6. Large electricity users participating in the direct electricity purchase and sale mechanism" |
| Responsibilities of the Power System and Electricity Market Operator (Article 4.4) | Report to the Electricity Regulatory Authority | Report to the State Electricity Management Agency |
| Types of Ancillary Services (Article 22.1) | Secondary frequency control, fast start, voltage regulation and black start. | Secondary frequency control, fast start, voltage regulation, black start, must-run operation reserve. |
| Determining monthly contract electricity output (Article 39) | Only apply the formula QcM = α × QdkM (QcM: Monthly contracted electricity output of the power plant (kWh); QdkM: Planned output according to the power system operation method updated next month of the power plant and converted to the delivery point (kWh); α: Proportion of electricity output paid according to the contract price applied for year N (%). | Apply QcM = Max {QcttM; α × QdkM} (QcM: Monthly contracted electricity output of the power plant (kWh); QcttM: Minimum monthly contracted electricity output of the power plant (kWh) determined according to the provisions of Clause 2, Article 29 of this Circular; QdkM: Monthly planned output of coal-fired thermal power plants according to the power system operation method updated in the first month of each quarter (January, April, July and October) or of gas turbine plants according to the system operation method January and July power system or offshore wind power plant, new energy power according to monthly power system operation method and converted to delivery point (kWh); α: Proportion of power output paid according to contract price applicable to year N (%). |
| Procedures for approving the next month's electricity market operation plan (Article 42.5) | The Electricity Regulatory Authority appraises and approves the monthly electricity market operation plan | The state electricity management agency is responsible for appraising and approving the monthly electricity market operation plan |
| Real-time operation (Article 64.1) | Decision on directive compliance with the Regulations on power transmission system issued by the Ministry of Industry and Trade. | Decision on directive compliance with the Regulations on dispatching, operation, handling, troubleshooting, black start and restoration of the national power system issued by the Ministry of Industry and Trade. |
| Determining market electricity price (Article 81) | Scheduling market electricity price calculation in the model | Not considering thermal power plants that do not participate in market price in off-grid cycles. |
| Data reconciliation (Article 76.2.c) | - Before 12:00 on day D+4, relevant units shall check and compare metering data - Accept feedback on metering data reconciliation on the electricity market electronic information page. | - Before 12:00 on day D+4, relevant units shall check and compare metering data, detect occurrences and events leading to output differences - Refuse to accept feedback on occurrences related to metering data of day D in case there is feedback from units on the electricity market electronic information page before 12:00 on day D+4 |
| Duration, effectiveness, and repeal of the Circular (Article 133) | 1. This Circular takes effect from November 25, 2024. 2. This Circular replaces Circular No. 45/2018/TT-BCT dated November 15, 2018 of the Minister of Industry and Trade regulating the operation of the competitive wholesale electricity market and amending and supplementing a number of articles of Circular No. 56/2014/TT-BCT dated December 19, 2014 of the Ministry of Industry and Trade regulating the method of determining electricity generation prices and the procedure for checking electricity purchase and sale contracts; Circular No. 24/2019/TT-BCT dated November 14, 2019 of the Minister of Industry and Trade amending and supplementing a number of articles of Circular No. 45/2018/TT-BCT dated November 15, 2018 of the Minister of Industry and Trade regulating the operation of the competitive wholesale electricity market and amending and supplementing a number of articles of Circular No. 56/2014/TT-BCT dated December 19, 2014 of the Minister of Industry and Trade regulating the method of determining electricity generation prices and procedures for checking electricity purchase and sale contracts, effective from January 1, 2020. 3. This Circular annuls Article 1 and Clause 3, Article 10 of Circular No. 12/2024/TT-BCT dated August 1, 2024 of the Minister of Industry and Trade regulating the amendment and supplement of a number of circulars Circular of the Minister of Industry and Trade related to the dispatch and operation of the national power system and the electricity market. 4. During the implementation process, if any problems arise, organizations and individuals are responsible for reporting to the Ministry of Industry and Trade for appropriate supplementation and amendment | 1. This Circular takes effect from February 1, 2025. 2. Circular No. 21/2024/TT-BCT dated October 10, 2024 of the Minister of Industry and Trade regulating the operation of the competitive wholesale electricity market is annulled. 3. The data and information including: ceiling price of electricity market, best new power plant, market capacity price, annual contract power output adjustment coefficient and power rate paid according to contract price approved by the Ministry of Industry and Trade in the 2025 Electricity Market Operation Plan will continue to be applied for the remaining months of 2025. 4. The Electricity Market Operation Plan for February 2025 approved by the Electricity Regulatory Authority according to the provisions of Circular No. 21/2024/TT-BCT will continue to be applied. 5. During the implementation process, if any problems arise, organizations and individuals are responsible for reporting to the Ministry of Industry and Trade for appropriate amendments and supplements. |
### Removal points
The following concepts and provisions are no longer mentioned in Circular No. 16/2025/TT-BCT, i.e. this Circular no longer regulates those issues:
◦ In the explanation of terms in Article 3 of Circular 21/2024/TT-BCT, there is no term: "Factory providing auxiliary services must develop and start up quickly according to the annually published list".
Change analysis
Found 644 posts
Export list to Excel
-
Decree No. 319/2026/NĐ-CP - Mandatory roadmap for installing cruise monitoring devices and cameras on vehicles
Effective date:: 01-Jul-2027 -
Law No. 13/2026/QH16 - Law on Prevention and Control of the Proliferation of Weapons of Mass Destruction
Effective date:: 01-Jul-2027 -
Law No. 15/2026/QH16 - Law Amending the Law on State Compensation Liability (2026)
Effective date:: 01-Mar-2027 -
Decree No. 419/2026/NĐ-CP - New penalties in the mineral sector, effective from January 15, 2027
Effective date:: 15-Jan-2027 -
Decree No. 415/2026/NĐ-CP - New penalty levels in the field of science and technology transfer
Effective date:: 05-Jan-2027 -
Decree No. 399/2026/NĐ-CP - The minimum wage from January 1, 2027 will increase by at least 310,000 VND/month
Effective date:: 01-Jan-2027 -
Decree No. 372/2026/NĐ-CP - Regulations on attaching identifiers and product traceability
Effective date:: 01-Jan-2027 -
Decree No. 384/2026/NĐ-CP - Criteria for determining the origin of Vietnam for goods circulated in the country
Effective date:: 01-Jan-2027 -
Decree No. 401/2026/NĐ-CP - Sanctioning levels in the field of digital technology industry (applied from 22/12/2026)
Effective date:: 22-Dec-2026 -
Decree No. 391/2026/NĐ-CP - New fines in the field of betting and prize games, applicable from 5/12/2026
Effective date:: 05-Dec-2026 -
Decree No. 393/2026/NĐ-CP - Conditions for exemption and issuance of work permits for foreigners from 5/12/2026
Effective date:: 05-Dec-2026 -
Circular No. 145/2026/TT-BTC - New regulations on clearing and settlement of securities transactions
Effective date:: 16-Nov-2026 -
Decree No. 379/2026/NĐ-CP - Renewal of standards and norms for the use of public cars
Effective date:: 16-Nov-2026 -
Decree No. 374/2026/NĐ-CP - Regulations on bidding within the framework of free trade agreements
Effective date:: 14-Nov-2026 -
Decree No. 363/2026/NĐ-CP - Penalties for violations in the field of data
Effective date:: 11-Nov-2026 -
Decree No. 385/2026/NĐ-CP - New regulations on control of administrative procedures
Effective date:: 10-Oct-2026 -
Decree No. 328/2026/NĐ-CP - Regulations on measures to prevent and handle fake news
Effective date:: 05-Oct-2026 -
Decree No. 316/2026/NĐ-CP - Amendments to the financial regime for state-owned banks
Effective date:: 01-Oct-2026 -
Decree No. 377/2026/NĐ-CP - Amendments to regulations on bidding for PPP projects and settlement of BT projects
Effective date:: 01-Oct-2026 -
Decree No. 376/2026/NĐ-CP - Renewal of the organizational structure and powers of the Ministry of Finance
Effective date:: 01-Oct-2026 -
Circular No. 138/2026/TT-BTC - New guidelines on corporate bond offering and trading
Effective date:: 01-Oct-2026 -
Decree No. 365/2026/NĐ-CP - Conditions for rice import and export business from October 1, 2026
Effective date:: 01-Oct-2026 -
Law No. 06/2026/QH16 - Amendment to the Law on Emulation and Commendation (2026)
Effective date:: 01-Oct-2026 -
Circular No. 65/2026/TT-BGDĐT - Changes in criteria for recognition of foreign diplomas
Effective date:: 26-Sep-2026 -
Decree No. 312/2026/NĐ-CP - Policies that combine economic development with security
Effective date:: 22-Sep-2026 -
Circular No. 47/2026/TT-BKHCN - Training program for product evaluation and certification experts
Effective date:: 20-Sep-2026 -
Circular No. 33/2026/TT-BNNMT - Amendments to regulations on certification of origin of exported aquatic products
Effective date:: 19-Sep-2026 -
Decree No. 302/2026/NĐ-CP - Regulations and conditions for establishment of the Goods Exchange
Effective date:: 15-Sep-2026 -
Decree No. 349/2026/NĐ-CP - Many major changes in contractor selection from September 9, 2026
Effective date:: 09-Sep-2026 -
Decree No. 292/2026/NĐ-CP - Renewal of the List of prohibited goods and import and export restrictions
Effective date:: 05-Sep-2026 -
Circular No. 154/2026/TT-BCA - Regulations on issuance of identification codes and chemical traceability
Effective date:: 04-Sep-2026 -
Decree No. 285/2026/NĐ-CP - Amendments to the competence of administrative sanctions in the field of sports
Effective date:: 01-Sep-2026 -
Decree No. 284/2026/NĐ-CP - Regulations on administrative sanctions on digital asset transactions
Effective date:: 01-Sep-2026 -
Decree No. 337/2026/NĐ-CP - New regulations on the right to access information of people and businesses
Effective date:: 01-Sep-2026 -
Decree No. 339/2026/NĐ-CP - Sharply increase fines in the fields of construction, housing and real estate
Effective date:: 26-Aug-2026 -
Decree No. 275/2026/NĐ-CP - Increasing the level of sanctions in the field of chemicals and explosives
Effective date:: 25-Aug-2026 -
Decree No. 274/2026/NĐ-CP - New regulations on bidding for business investment projects
Effective date:: 21-Aug-2026 -
Decree No. 330/2026/NĐ-CP - Penalties for violations of cyber security and personal data protection
Effective date:: 19-Aug-2026 -
Decree No. 246/2026/NĐ-CP - Increasing the level of sanctions for violations related to fishery exploitation
Effective date:: 18-Aug-2026 -
Decree No. 323/2026/NĐ-CP - Process of receiving and settling international investment disputes
Effective date:: 17-Aug-2026 -
Decree No. 318/2026/NĐ-CP - Regulations on derivative contracts when opening bankruptcy procedures
Effective date:: 12-Aug-2026 -
Decree No. 219/2026/NĐ-CP - Increasing the fine level for many violations in the field of hydrometeorology
Effective date:: 08-Aug-2026 -
Decree No. 211/2026/NĐ-CP - Increasing fines in the field of animal husbandry
Effective date:: 05-Aug-2026 -
Decree No. 214/2026/NĐ-CP - Increasing the level of sanctions in the field of cultivation and plant quarantine
Effective date:: 05-Aug-2026 -
Decree No. 308/2026/NĐ-CP - Enterprises may set up human resource training funds
Effective date:: 05-Aug-2026 -
Decree No. 204/2026/NĐ-CP - New fines in the field of veterinary medicine (applied from August 1, 2026)
Effective date:: 01-Aug-2026 -
Decree No. 296/2026/NĐ-CP - Amendments to enterprise registration declaration procedures
Effective date:: 23-Jul-2026 -
Decree No. 288/2026/NĐ-CP - Increase in fines for violations related to beneficial owners
Effective date:: 21-Jul-2026 -
Decree No. 186/2026/NĐ-CP - Supplementing sanctioning regulations related to trade names
Effective date:: 15-Jul-2026 -
Circular No. 05/2026/TT-NHNN - Increase the deposit insurance payment limit to VND 350 million
Effective date:: 13-Jul-2026 -
Decree No. 279/2026/NĐ-CP - New powers of the Ministry of Education and Training (applicable from 12/7/2026)
Effective date:: 12-Jul-2026 -
Circular No. 30/2026/TT-BYT - New regulations on inscribing nutritional ingredients on food labels
Effective date:: 10-Jul-2026 -
Decree No. 183/2026/NĐ-CP - Increasing administrative fines in the field of dike protection
Effective date:: 10-Jul-2026 -
Decree No. 208/2026/NĐ-CP - Air transport business conditions as of July 1, 2026
Effective date:: 01-Jul-2026 -
Decree No. 165/2026/NĐ-CP - New regulations on disease prevention activities
Effective date:: 01-Jul-2026 -
Decree No. 169/2026/NĐ-CP - Aggravating fines in the field of customs and import and export
Effective date:: 01-Jul-2026 -
Circular No. 15/2026/TT-BYT - New regulations on disease prevention activities
Effective date:: 01-Jul-2026 -
Law No. 8/2026/QH16 - Law amending the Law on Vietnam's diplomatic missions abroad
Effective date:: 01-Jul-2026 -
Decree No. 94/2026/NĐ-CP - New regulations on driving license training and exams
Effective date:: 01-Jul-2026 -
Decree No. 253/2026/NĐ-CP - New regulations on PIT declaration and calculation from July 1, 2026
Effective date:: 01-Jul-2026 -
Decree No. 254/2026/NĐ-CP - New regulations on the use of e-invoices from July 1, 2026
Effective date:: 01-Jul-2026 -
Decree No. 252/2026/NĐ-CP - New regulations on tax declaration and tax refund
Effective date:: 01-Jul-2026 -
Decree No. 265/2026/NĐ-CP - New sanctioning levels on thrift and anti-waste
Effective date:: 01-Jul-2026 -
Circular No. 27/2026/TT-BNNMT - List of risky products in the agricultural sector
Effective date:: 01-Jul-2026 -
Circular No. 86/2026/TT-BTC - New regulations on tax declaration and payment for imports and exports
Effective date:: 01-Jul-2026 -
Law No. 129/2025/QH15 - Law on Public Employees 2025: Expanding business and practice rights for public employees
Effective date:: 01-Jul-2026 -
Law No. 128/2025/QH15 - Law on Enforcement of Temporary Detention and Detention in 2025
Effective date:: 01-Jul-2026 -
Decree No. 200/2026/NĐ-CP - New regulations on offering corporate bonds (applicable from 5/6/2026)
Effective date:: 05-Jun-2026 -
Circular No. 14/2026/TT-BKHCN - New regulations on assessment and announcement of standard and regulation conformity
Effective date:: 25-May-2026 -
Circular No. 13/2026/TT-BKHCN - New regulations on announcement and application of standards
Effective date:: 24-May-2026 -
Decree No. 114/2026/NĐ-CP - Amendments to the competence to impose administrative penalties in the field of prices
Effective date:: 20-May-2026 -
Decree No. 102/2026/NĐ-CP - Amendments to regulations on sanctions in the field of competition
Effective date:: 20-May-2026 -
Circular No. 22/2026/TT-BNNMT - Many procedures in the field of agriculture and environment are simplified
Effective date:: 19-May-2026 -
Decree No. 98/2026/NĐ-CP - Increasing the level of sanctions in the field of social protection
Effective date:: 16-May-2026 -
Circular No. 05/2026/TT-BYT - List of chemicals banned from use in disinfectant and bactericidal preparations
Effective date:: 15-May-2026 -
Decree No. 81/2026/NĐ-CP - Renewing regulations on administrative sanctions in the field of railway traffic
Effective date:: 15-May-2026 -
Decree No. 86/2026/NĐ-CP - Tightening conditions for trading in prize-winning electronic games
Effective date:: 15-May-2026 -
Decree No. 90/2026/NĐ-CP - New fines in the field of health and pharmacy
Effective date:: 15-May-2026 -
Decree No. 87/2026/NĐ-CP - Increase in fines in the field of advertising and culture
Effective date:: 15-May-2026 -
Decree No. 80/2026/NĐ-CP - Amendments to sanctioning regulations in the field of maritime and waterway traffic
Effective date:: 15-May-2026 -
Decree No. 85/2026/NĐ-CP - New regulations on supplementary pension insurance
Effective date:: 10-May-2026 -
Decree No. 82/2026/NĐ-CP - Amendments to regulations on administrative sanctions related to seas and islands
Effective date:: 04-May-2026 -
Decree No. 79/2026/NĐ-CP - New fines in the field of national border protection
Effective date:: 02-May-2026 -
Decree No. 76/2026/NĐ-CP - Amendments to sanctioning levels for violations related to gender equality
Effective date:: 01-May-2026 -
Decree No. 71/2026/NĐ-CP - Increasing the level of sanctions for violations in the field of atomic energy
Effective date:: 01-May-2026 -
Law No. 111/2025/QH15 - Law on Deposit Insurance 2025 Law No. 06/2012/QH13 - Law of Deposit Insurance
Effective date:: 01-May-2026 -
Decree No. 69/2026/NĐ-CP - Amendments to fine levels and sanctioning competence on fire prevention and fighting
Effective date:: 20-Apr-2026 -
Decree No. 96/2026/NĐ-CP - New regulations on investment conditions and investment incentives
Effective date:: 31-Mar-2026 -
Circular No. 20/2026/TT-BTC - New regulations on conditions for accounting expenses when calculating CIT
Effective date:: 12-Mar-2026 -
Decree No. 31/2026/NĐ-CP - Levels of administrative sanctions in the field of archives
Effective date:: 08-Mar-2026 -
Decree No. 68/2026/NĐ-CP - New tax declaration and payment policy for business households and individuals
Effective date:: 05-Mar-2026 -
Circular No. 18/2026/TT-BTC - Changing the tax calculation method for business households
Effective date:: 05-Mar-2026 -
Law No. 121/2025/QH15 - Law on Supervisory Activities of the National Assembly in 2025
Effective date:: 01-Mar-2026 -
Decree No. 336/2025/NĐ-CP - Many road traffic violations will see increased fines starting March 1, 2026.
Effective date:: 01-Mar-2026 -
Decree No. 357/2025/NĐ-CP - Real estate will be labeled with electronic identification codes from March 1, 2026
Effective date:: 01-Mar-2026 -
Circular No. 47/2025/TT-BNNMT - Announcing the new Regulation on national topographic maps at the scale of 1:10,000
Effective date:: 16-Feb-2026 -
Decree No. 342/2025/NĐ-CP - Tightening regulations on advertising from February 15, 2026
Effective date:: 15-Feb-2026 -
Circular No. 56/2025/TT-BYT - New regulations on occupational disease examination for employees
Effective date:: 15-Feb-2026 -
Decree No. 348/2025/NĐ-CP - Changes in sanctioning authority in the tourism sector from February 15, 2026
Effective date:: 15-Feb-2026 -
Circular No. 136/2025/TT-BTC - Amendments to a number of regulations for securities investment funds
Effective date:: 12-Feb-2026 -
Decree No. 340/2025/NĐ-CP - New fines in the field of currency and banking (applied from 9/2/2026)
Effective date:: 09-Feb-2026 -
Circular No. 121/2025/TT-BTC - Amendments to many important regulations on customs procedures and policies
Effective date:: 01-Feb-2026 -
Circular No. 115/2025/TT-BTC - Amendments to regulations on offering and repurchase of shares
Effective date:: 28-Jan-2026 -
Circular No. 08/2026/TT-BNNMT - New regulations on management of irrigation works
Effective date:: 26-Jan-2026 -
Decree No. 30/2026/NĐ-CP - New regulations on energy labeling on vehicles and equipment
Effective date:: 21-Jan-2026 -
Decree No. 28/2026/NĐ-CP - Renewal of the List of narcotic substances and precursors
Effective date:: 19-Jan-2026 -
Decree No. 24/2026/NĐ-CP - List of basic chemicals and chemicals subject to control (applicable from 17/1/2026)
Effective date:: 17-Jan-2026 -
Decree No. 25/2026/NĐ-CP - New regulations on safety requirements for chemical projects
Effective date:: 17-Jan-2026 -
Decree No. 26/2026/NĐ-CP - New regulations on conditions for production, trading and use of chemicals
Effective date:: 17-Jan-2026 -
Circular No. 01/2026/TT-BCT - Renewal of chemical licensing and declaration processes, forms
Effective date:: 17-Jan-2026 -
Decree No. 310/2025/NĐ-CP - Amending many regulations on administrative sanctions in the field of tax and invoices
Effective date:: 16-Jan-2026 -
Decree No. 19/2026/NĐ-CP - New regulations on appraisal and supervision of projects of national importance
Effective date:: 14-Jan-2026 -
Circular No. 03/2026/TT-BNNMT - List of seafood and aquatic products subject to compulsory quarantine from 13/1/2026
Effective date:: 13-Jan-2026 -
Decree No. 306/2025/NĐ-CP - Supplementing and increasing penalties for many violations in securities trading
Effective date:: 09-Jan-2026 -
Decree No. 292/2025/NĐ-CP - Cases of agricultural land use tax exemption extended until the end of 2030
Effective date:: 01-Jan-2026 -
Decree No. 316/2025/NĐ-CP - New regulations on investment and construction of nuclear power plants
Effective date:: 01-Jan-2026 -
Decree No. 318/2025/NĐ-CP - New regulations on registration of employee information
Effective date:: 01-Jan-2026 -
Circular No. 99/2025/TT-BTC - Replacing the Enterprise Accounting Regime, effective from January 1, 2026
Effective date:: 01-Jan-2026 -
Circular No. 101/2025/TT-BTC - Renewing the special accounting regime for insurance brokerage enterprises
Effective date:: 01-Jan-2026 -
Circular No. 28/2025/TT-BKHCN - Standard information format on digital signature certificates
Effective date:: 01-Jan-2026 -
Decree No. 337/2025/NĐ-CP - Conditions for concluding electronic labor contracts
Effective date:: 01-Jan-2026 -
Resolution No. 111/2025/UBTVQH15 - Criteria for urban classification from January 1, 2026
Effective date:: 01-Jan-2026 -
Decree No. 332/2025/NĐ-CP - Regulations on the framework of radiation safety control and assurance
Effective date:: 01-Jan-2026 -
Decree No. 360/2025/NĐ-CP - New regulations on excise tax from January 1, 2026
Effective date:: 01-Jan-2026 -
Decree No. 2/2026/NĐ-CP - Increasing the fine level for violations in the field of charges and fees
Effective date:: 01-Jan-2026 -
Decree No. 352/2025/NĐ-CP - Conditions for employment service business as of January 1, 2026
Effective date:: 01-Jan-2026 -
Decree No. 362/2025/NĐ-CP - Officially abolishing the license fee from January 1, 2026
Effective date:: 01-Jan-2026 -
Decree No. 366/2025/NĐ-CP - New regulations on the establishment of state-contributed enterprises
Effective date:: 01-Jan-2026 -
Decree No. 356/2025/NĐ-CP - New regulations on personal data protection and transfer
Effective date:: 01-Jan-2026 -
Law No. 77/2025/QH15 - Amended Law on Economical Use of Energy (applicable from 2026)
Effective date:: 01-Jan-2026 -
Law No. 74/2025/QH15 - Employment Law 2025: Expanding the eligibility for unemployment insurance contributions
Effective date:: 01-Jan-2026 -
Law No. 150/2025/QH15 - Specialized Court Law at the International Financial Center
Effective date:: 01-Jan-2026 -
Decree No. 364/2025/NĐ-CP - Road toll collection and exemption policy from January 1, 2026
Effective date:: 01-Jan-2026 -
Decree No. 374/2025/NĐ-CP - New regulations on unemployment insurance (applicable from January 1, 2026)
Effective date:: 01-Jan-2026 -
Decree No. 353/2025/NĐ-CP - Conditions for testing new digital technology products and services
Effective date:: 01-Jan-2026 -
Circular No. 01/2026/TT-BNNMT - New regulations on quarantine of animal products from 2026
Effective date:: 01-Jan-2026 -
Decree No. 371/2025/NĐ-CP - Officially sanctioning the act of using e-cigarettes from 31/12/2025
Effective date:: 31-Dec-2025 -
Decree No. 290/2025/NĐ-CP - Increasing administrative penalties in the field of water resources
Effective date:: 25-Dec-2025 -
Circular No. 41/2025/TT-BYT - Renewing professional standards for doctors and nurses
Effective date:: 18-Dec-2025 -
Circular No. 102/2025/TT-BTC - Amending some financial safety indicators for securities companies
Effective date:: 15-Dec-2025 -
Decree No. 282/2025/NĐ-CP - Increasing administrative penalties in the field of security and order
Effective date:: 15-Dec-2025 -
Decree No. 313/2025/NĐ-CP - New regulations on receipt and use of foreign aid capital
Effective date:: 08-Dec-2025 -
Circular No. 28/2025/TT-BXD - Economic and technical characteristics of ship inspection services
Effective date:: 01-Dec-2025 -
Circular No. 29/2025/TT-BXD - Economic and technical characteristics of ship inspection services
Effective date:: 01-Dec-2025 -
Circular No. 36/2025/TT-BKHCN - Framework regulations on appraisal and performance of science-technology contracts
Effective date:: 26-Nov-2025 -
Circular No. 16/2025/TT-BNV - Service contract and labor contract templates applicable to state agencies and units
Effective date:: 16-Nov-2025 -
Decree No. 273/2025/NĐ-CP - New regulations on inspection activities in the People's Public Security
Effective date:: 20-Oct-2025 -
Decree No. 236/2025/NĐ-CP - Regulations on global minimum tax declaration and payment from fiscal year 2024
Effective date:: 15-Oct-2025 -
Decree No. 265/2025/NĐ-CP - New regulations on the use of Science and Technology Development Fund of enterprises
Effective date:: 14-Oct-2025 -
Decree No. 269/2025/NĐ-CP - Framework regulations on investment in smart urban development
Effective date:: 14-Oct-2025 -
Circular No. 34/2025/TT-NHNN - New regulations on gold trading (effective from October 10, 2025)
Effective date:: 10-Oct-2025 -
Decree No. 259/2025/NĐ-CP - Framework regulations on import and export of strategic commercial goods
Effective date:: 10-Oct-2025 -
Decree No. 258/2025/NĐ-CP - New regulations on management of parks, trees and water surfaces
Effective date:: 09-Oct-2025 -
Law No. 93/2025/QH15 - Law on Science, Technology and Innovation (2025)
Effective date:: 01-Oct-2025 -
Decree No. 249/2025/NĐ-CP - Remuneration mechanism for experts in science and technology projects
Effective date:: 19-Sep-2025 -
Decree No. 205/2025/NĐ-CP - Supplementing many preferential policies for the supporting industry sector
Effective date:: 01-Sep-2025 -
Decree No. 228/2025/NĐ-CP - Regulations on new penalties in the field of independent audit
Effective date:: 18-Aug-2025 -
Decree No. 167/2025/NĐ-CP - Amending many regulations on customs declaration procedures
Effective date:: 15-Aug-2025 -
Decree No. 218/2025/NĐ-CP - Sanctions from August 5, 2025 in the field of defense and cipher
Effective date:: 05-Aug-2025 -
Law No. 68/2025/QH15 - Law on Investment of State Capital in Enterprises in 2025
Effective date:: 01-Aug-2025 -
Decree No. 135/2025/NĐ-CP - Mechanism for evaluating the performance of banks with 100% capital held by the State
Effective date:: 01-Aug-2025 -
Decree No. 113/2025/NĐ-CP - Framework regulations on the development and updating of archival data
Effective date:: 21-Jul-2025 -
Decree No. 204/2025/NĐ-CP - Procedures for advance and payment of procedural expenses from July 11, 2025
Effective date:: 11-Jul-2025 -
Decree No. 186/2025/NĐ-CP - New regulations on procurement and use of public assets
Effective date:: 01-Jul-2025 -
Circular No. 12/2025/TT-BXD - New regulations on tonnage and loading limits on vehicles
Effective date:: 01-Jul-2025 -
Decree No. 165/2025/NĐ-CP - Regulation on data management, processing and use
Effective date:: 01-Jul-2025 -
Circular No. 12/2025/TT-BNV - New regulations on sickness, maternity, and retirement benefits from July 1, 2025
Effective date:: 01-Jul-2025 -
Decree No. 181/2025/NĐ-CP - New regulations on VAT declaration and deduction apply from July 1, 2025
Effective date:: 01-Jul-2025 -
Circular No. 69/2025/TT-BTC - New guidance on VAT calculation rates and how to determine the refundable VAT amount
Effective date:: 01-Jul-2025 -
Decree No. 178/2025/NĐ-CP - New regulations on the formulation of types of planning
Effective date:: 01-Jul-2025 -
Decree No. 118/2025/NĐ-CP - Framework regulations on settlement of administrative procedures apply from July 1, 2025
Effective date:: 01-Jul-2025 -
Decree No. 127/2025/NĐ-CP - Regulation on decentralization of authority to manage public assets from July 1, 2025
Effective date:: 01-Jul-2025 -
Decree No. 151/2025/NĐ-CP - Regulation on decentralization of land management from July 1, 2025
Effective date:: 01-Jul-2025 -
Decree No. 158/2025/NĐ-CP - New regulations on compulsory social insurance payment (applied from July 1, 2025)
Effective date:: 01-Jul-2025 -
Decree No. 155/2025/NĐ-CP - Norms for the use of working offices of State agencies apply from July 1, 2025
Effective date:: 01-Jul-2025 -
Circular No. 09/2025/TT-BTP - New powers of the Department of Justice from July 1, 2025
Effective date:: 01-Jul-2025 -
Decree No. 86/2025/NĐ-CP - New regulations on application of trade remedies
Effective date:: 01-Jul-2025 -
Decree No. 105/2025/NĐ-CP - New regulations on fire prevention and fighting, applied from July 1, 2025
Effective date:: 01-Jul-2025 -
Decree No. 106/2025/NĐ-CP - Acts and fines in the field of fire prevention and fighting apply from July 1, 2025
Effective date:: 01-Jul-2025 -
Law No. 51/2024/QH15 - Law on amendments to the Law on Health insurance, applicable from July 01, 2025
Effective date:: 01-Jul-2025 -
Decree No. 150/2025/NĐ-CP - List of Departments and Departments in the provinces applicable from 16/6/2025
Effective date:: 16-Jun-2025 -
Circular No. 01/2025/TT-NHNN - Procedures for granting operation licenses to people's credit funds
Effective date:: 15-Jun-2025 -
Decree No. 77/2025/NĐ-CP - New regulations on nationalization of certain types of property
Effective date:: 01-Apr-2025 -
Decree No. 80/2025/NĐ-CP - New regulations on implementation of legal normative documents
Effective date:: 01-Apr-2025 -
Circular No. 29/2024/TT-BGDĐT - New regulations on provision of extra classes from February 14, 2025
Effective date:: 14-Feb-2025 -
Decree No. 15/2025/NĐ-CP - New regulations on management and operation of railway infrastructure property
Effective date:: 03-Feb-2025 -
Circular No. 12/2025/TT-BCT - New regulations on determining electricity price and model power purchase agreement
Effective date:: 01-Feb-2025 -
Law No. 58/2024/QH15 - 2024 Law on Public Investment Law No. 39/2019/QH14 - 2019 Law on Public Investment
Effective date:: 01-Jan-2025 -
Decree No. 162/2024/NĐ-CP - New requirements for founding shareholders and founding members of banks
Effective date:: 20-Dec-2024 -
Law No. 47/2024/QH15 - 2024 Law on Urban and Rural Planning Law No. 30/2009/QH12 - Law on urban planning (2009)
Effective date:: 01-Jul-2025 -
Law No. 38/2024/QH15 - 2024 Law on National Defense and Security Industry and Industrial Mobilization
Effective date:: 01-Jul-2025 -
Law No. 33/2024/QH15 - 2024 Law on Achieves Law No. 01/2011/QH13 - Law on archives
Effective date:: 01-Jul-2025 -
Law No. 42/2024/QH15 - 2024 Law on management and use of weapons, explosive materials and support instruments
Effective date:: 01-Jan-2025 -
Law No. 35/2024/QH15 - 2024 Law on Road Law No. 23/2008/QH12 - Road Traffic Law 2009
Effective date:: 01-Jan-2025 -
Decree No. 141/2024/NĐ-CP - Occupations that require mandatory HIV testing before recruitment
Effective date:: 15-Dec-2024 -
Circular No. 19/2024/TT-BYT - List of new HS codes of imported, exported medical equipment
Effective date:: 16-Nov-2024 -
Decree No. 123/2024/NĐ-CP - Fines for violations in the field of land apply from 4/10/2024
Effective date:: 04-Oct-2024 -
Circular No. 36/2024/TT-NHNN - Guidelines on classification of debts with regard to cooperative banks
Effective date:: 15-Aug-2024 -
Circular No. 14/2024/TT-NHNN - Criteria for classification of nonperforming loans at microfinance institutions
Effective date:: 12-Aug-2024 -
Decree No. 60/2024/NĐ-CP - Regulations on development and management of markets
Effective date:: 01-Aug-2024 -
Decree No. 104/2024/NĐ-CP - Cases eligible for capital advance from the Land Development Fund from August 1, 2024
Effective date:: 01-Aug-2024 -
Circular No. 40/2024/TT-NHNN - Conditions for provision of payment intermediary services from July 17, 2024
Effective date:: 17-Jul-2024 -
Decree No. 87/2024/NĐ-CP - New sanctions in the field of prices, applied from 12/7/2024
Effective date:: 12-Jul-2024 -
Decree No. 69/2024/NĐ-CP - New regulations on issuance of electronic identification and authentication
Effective date:: 01-Jul-2024 -
Circular No. 18/2024/TT-NHNN - From July 01, 2024: It is allowable to issue electronic bank cards
Effective date:: 01-Jul-2024 -
Circular No. 31/2024/TT-NHNN - New regulations on classification of debts of banks, finance companies
Effective date:: 01-Jul-2024 -
Decree No. 52/2024/NĐ-CP - Payment forms to be considered cashless payments from July 01, 2024
Effective date:: 01-Jul-2024 -
Law No. 26/2023/QH15 - 2023 Law on Identification Law No. 59/2014/QH13 - Law on Citizen identification
Effective date:: 01-Jul-2024 -
Law No. 28/2023/QH15 - 2023 Law on Water Resources Law No. 17/2012/QH13 - 2012 Law on Water resources
Effective date:: 01-Jul-2024 -
Law No. 24/2023/QH15 - 2023 Law on Telecommunications Law No. 41/2009/QH12 - 2019 Law on Telecommunications
Effective date:: 01-Jul-2024 -
Law No. 16/2023/QH15 - 2023 Law on Prices Law No. 11/2012/QH13 - 2012 Law on Prices
Effective date:: 01-Jul-2024 -
Law No. 17/2023/QH15 - 2023 Law on Cooperative Law No. 23/2012/QH13 - Foreigners may become members of cooperatives
Effective date:: 01-Jul-2024 -
Circular No. 71/2023/TT-BCA - Environmental Police Wastewater Inspection Process
Effective date:: 01-Feb-2024 -
Law No. 22/2023/QH15 - 2023 Law on Bidding Law No. 43/2013/QH13 - Law on Bidding (2014)
Effective date:: 01-Jan-2024 -
Resolution No. 107/2023/QH15 - Regulations on payment of global minimum tax in Vietnam
Effective date:: 01-Jan-2024 -
Decree No. 96/2023/NĐ-CP - Regulations on issuance of license to practice medicine applicable from 2024
Effective date:: 01-Jan-2024 -
Law No. 06/2022/QH15 - 2022 Law on emulation and Commendation of Vietnam
Effective date:: 01-Jan-2024 -
Decree No. 74/2023/NĐ-CP - Amendments to some Decrees on activities in the maritime sector
Effective date:: 27-Nov-2023 -
Circular No. 17/2023/TT-BGDĐT - New Regulation on Exams for the Selection of Excellent Student at National Level
Effective date:: 25-Nov-2023 -
Decree No. 17/2023/NĐ-CP - Regulations on copyright, applicable from April 26th, 2023
Effective date:: 26-Apr-2023 -
Circular No. 25/2022/TT-BLĐTBXH - List of personal protective equipment must be provided for employees
Effective date:: 01-Apr-2023 -
Decree No. 35/2022/NĐ-CP - New regulations on establishment of industrial parks and economic zones
Effective date:: 15-Jul-2022