Posted date: 4-Feb-2026 6:45:00 AM VN
Summary of Violations and Penalties under

Decree No. 45/2022/NĐ-CP⛔ - New regulations on penalties for administrative offences against environmental protection applicable from August 25th, 2022

Effective date: 25-Aug-2022
💡 Acts subject to penalties shall be regarded as prohibited or mandatory acts.
Behavior and Penalties
(Articles 9 - 55)
ViolationMinimumMaximum
Violation of regulations on environmental registration implementation (Article 9)
Investment projects and facilities not subject to environmental impact assessment reporting requirements violate environmental registration content
- Failure to implement, improper implementation, or incomplete implementation of commitments or plans for waste collection, management, and treatment as stated in the environmental registration (excluding ordinary solid waste and hazardous waste).500,000 VND1,000,000 VND
- Failure to submit environmental registration within the deadline; failure to register all details regarding waste and treatment plans; failure to re-register as required.3,000,000 VND5,000,000 VND
Projects and facilities that are required to prepare environmental impact assessment reports and fall under the approval authority of the Provincial People's Committee or the Ministry of National Defense, Ministry of Public Security, and have environmental criteria equivalent to investment projects and facilities under the approval authority of the Provincial People's Committee that violate the environmental registration content
- Failure to implement, improper implementation, or incomplete implementation of commitments or plans for waste collection, management, and treatment as stated in the environmental registration (excluding ordinary solid waste and hazardous waste).5,000,000 VND10,000,000 VND
- Failure to submit environmental registration within the deadline; failure to register all details regarding waste and treatment plans; failure to re-register environmental registration as required.10,000,000 VND15,000,000 VND
Investment projects and facilities that require environmental impact assessment reports and fall under the approval authority of the Ministry of Natural Resources and Environment or the Ministry of National Defense/Ministry of Public Security for projects with environmental criteria equivalent to those under the approval authority of the Ministry of Natural Resources and Environment that violate the environmental registration content
- Failure to implement, improper implementation, or incomplete implementation of commitments or plans for waste collection, management, and treatment as stated in the environmental registration (excluding ordinary solid waste and hazardous waste).VND 15,000,000VND 20,000,000
- Failure to submit environmental registration within the deadline; failure to register all details regarding waste and treatment plans; failure to re-register environmental registration as required.20,000,000 VND30,000,000 VND
Violation of regulations on environmental impact assessment (Article 10)
Implementing decisions approving the results of environmental impact assessment reports under the authority of the Provincial People's Committee or the Ministry of National Defense, Ministry of Public Security for projects with environmental criteria equivalent to projects under the authority of the Provincial People's Committee
- Failure to provide written notification of the completion of environmental protection works as required to the agency that approved the environmental impact assessment report before officially putting the project into operation, in the case of investment projects not subject to environmental permits;10,000,000 VND15,000,000 VND
◦ Failure to publicly disclose the approved environmental impact assessment report as required by regulations. | 15,000,000 VND | 20,000,000 VND |
◦ Failure to adjust or supplement the content of the investment project and the environmental impact assessment report to conform with the environmental protection requirements stated in the decision approving the results of the environmental impact assessment report. | 20,000,000 VND | 30,000,000 VND |
| - Failure to properly or fully implement any of the contents of the decision approving the results of the environmental impact assessment report as prescribed, except for cases of: violations of regulations on environmental monitoring and surveillance; prevention and response to waste incidents and regulations at points d, e, g of this clause; | 30,000,000 VND | 40,000,000 VND |
| - Failure to implement the content of the decision approving the results of the environmental impact assessment report as prescribed, except in the following cases: violations of regulations on environmental monitoring and supervision; prevention and response to waste incidents, except in cases specified in points e and g of this clause; | 40,000,000 VND | 50,000,000 VND |
| - Failure to report to the competent state agency as required for consideration and approval during the environmental permit issuance process for investment projects subject to environmental permit requirements in case of changes as stipulated in point b, clause 4, Article 37 of the Law on Environmental Protection; | 50,000,000 VND | 60,000,000 VND |
| - Construction, installation of equipment, pipelines or other discharge lines for discharging untreated waste into the environment; failure to operate or infrequent operation or improper operation of waste treatment facilities; failure to construct or improper construction of waste treatment facilities, noise and vibration mitigation works, light control, and heat radiation control as prescribed during the construction and implementation phases of projects that generate waste, noise, vibration, light, and heat radiation. | 60,000,000 VND | 80,000,000 VND |
| Implementing decisions approving the results of environmental impact assessment reports under the authority of the Ministry of Natural Resources and Environment, or implementing decisions approving the results of environmental impact assessment reports under the authority of the Ministry of National Defense or the Ministry of Public Security for investment projects with environmental criteria equivalent to projects under the authority of the Ministry of Natural Resources and Environment. | | |
| - Failure to provide written notification of the completion of environmental protection works as required to the agency that approved the environmental impact assessment report before officially putting the project into operation, in the case of investment projects not subject to environmental permits; | 15,000,000 VND | 20,000,000 VND |
◦ Failure to publicly disclose the approved environmental impact assessment report as required by regulations. | 20,000,000 VND | 30,000,000 VND |
◦ Failure to adjust or supplement the content of the investment project and the environmental impact assessment report to conform with the environmental protection requirements stated in the decision approving the results of the environmental impact assessment report. | 30,000,000 VND | 40,000,000 VND |
| - Failure to properly or fully implement any of the contents of the decision approving the results of the environmental impact assessment report as prescribed, except for the following cases: violations of regulations on environmental monitoring and supervision; prevention and response to waste incidents and regulations at points d, e, g of this clause; | 40,000,000 VND | 50,000,000 VND |
| - Failure to implement the content of the decision approving the results of the environmental impact assessment report as prescribed, except in the following cases: violations of regulations on environmental monitoring and supervision; prevention and response to waste incidents, except in cases specified in points e and g of this clause; | 50,000,000 VND | 60,000,000 VND |
| - Failure to report to the competent state agency as required for consideration and approval during the environmental permit issuance process for investment projects subject to environmental permit requirements in case of changes as stipulated in point b, clause 4, Article 37 of the Law on Environmental Protection; | 60,000,000 VND | 80,000,000 VND |
| - Construction, installation of equipment, pipelines or other discharge lines for discharging untreated waste into the environment; failure to operate or infrequent operation or improper operation of waste treatment facilities; failure to construct or improper construction of waste treatment facilities, noise and vibration mitigation works, light control, and heat radiation control as prescribed during the construction and implementation phases of projects that generate waste, noise, vibration, light, and heat radiation. | 80,000,000 VND | 100,000,000 VND |
| Violation of environmental permit regulations (Article 11) | | |
| Environmental permits under the licensing authority of the District People's Committee or environmental permits under the licensing authority of the Ministry of National Defense or the Ministry of Public Security where the equivalent subject falls under the licensing authority of the District People's Committee, except for cases stipulated in Articles 15, 29, 30, 31, 35 and 38 of this Decree | | |
| - Failure to report to the licensing authority for review and resolution in case of changes compared to the content of the issued license as prescribed; submitting the application for an environmental license after the prescribed deadline; | 5,000,000 VND | 10,000,000 VND |
◦ Failure to publicly display environmental permits as required. | 10,000,000 VND | 15,000,000 VND |
| - Failure to properly or fully implement any of the contents of the environmental permit, except in the following cases: violations of regulations on environmental monitoring; prevention and response to waste incidents; and cases specified in points a, b, d, e, and g of this clause; | VND 15,000,000 | VND 20,000,000 |
| - Failure to inspect wastewater treatment facilities and equipment to determine the cause of pollution or failure to renovate and upgrade wastewater treatment facilities as required in cases where the reported pollution data is inaccurate or in cases of violations regarding the discharge of wastewater, dust, and exhaust gases exceeding environmental technical standards; | 20,000,000 VND | 25,000,000 VND |
| - Providing inaccurate or untruthful information about the completion results of works and environmental protection measures in the environmental permit application report for investment projects that have received approval for the environmental impact assessment report before going into trial operation as prescribed; failing to renew or adjust the environmental permit as prescribed; failing to implement the contents of the environmental permit as prescribed, except in cases of: violations of regulations on environmental monitoring; prevention and response to waste incidents and cases specified in points a, b, c, e and g of this clause; | 25,000,000 VND | 30,000,000 VND |
◦ No environmental permit was reissued as required. | 30,000,000 VND | 35,000,000 VND |
| - Failure to operate, infrequent operation, or improper operation of wastewater treatment facilities; construction of wastewater treatment facilities not in accordance with the environmental permit; | 35,000,000 VND | 40,000,000 VND |
◦ Construction, installation of equipment, pipelines or other discharge lines for discharging untreated waste into the environment; failure to construct environmental protection facilities as required. | 40,000,000 VND | 50,000,000 VND |
| Environmental permits under the authority of the Provincial People's Committee or environmental permits under the authority of the Ministry of National Defense or the Ministry of Public Security where the equivalent subject falls under the authority of the Provincial People's Committee, except for cases stipulated in Articles 15, 29, 30, 31, 35 and 38 of this Decree | | |
| - Failure to report to the licensing authority for review and resolution in case of changes compared to the content of the issued license as prescribed; submitting the application for an environmental license after the prescribed deadline; | 10,000,000 VND | 15,000,000 VND |
◦ Failure to publicly display environmental permits as required. | 15,000,000 VND | 20,000,000 VND |
| - Failure to properly or fully implement any of the contents of the environmental permit as prescribed, except for the following cases: violations of regulations on environmental monitoring, prevention and response to waste incidents, and cases specified in points a, b, d, e, and g of this clause; | 20,000,000 VND | 30,000,000 VND |
| - Failure to inspect wastewater treatment facilities and equipment to determine the cause of pollution or failure to renovate and upgrade wastewater treatment facilities as required in cases where the reported pollution data is inaccurate or in cases of violations regarding the discharge of wastewater, dust, and exhaust gases exceeding environmental technical standards; | 80,000,000 VND | 100,000,000 VND |
| - Providing inaccurate or untruthful information about the completion results of works and environmental protection measures in the environmental permit application report for investment projects that have received approval for the environmental impact assessment report before going into trial operation as prescribed; failing to renew or adjust the environmental permit as prescribed; failing to implement the contents of the environmental permit as prescribed, except in cases of: violations of regulations on environmental monitoring; prevention and response to waste incidents and cases specified in points a, b, c, e and g of this clause; | 100,000,000 VND | 150,000,000 VND |
◦ No environmental permit was reissued as required. | 150,000,000 VND | 170,000,000 VND |
| - Failure to operate, infrequent operation, or improper operation of wastewater treatment facilities; construction of wastewater treatment facilities not in accordance with the environmental permit; | 170,000,000 VND | 200,000,000 VND |
◦ Construction, installation of equipment, pipelines or other discharge lines for discharging untreated waste into the environment; failure to construct environmental protection facilities as required. | 400,000,000 VND | 500,000,000 VND |
| Enforcement of environmental permits under the licensing authority of the Ministry of Natural Resources and Environment or environmental permits under the licensing authority of the Ministry of National Defense or the Ministry of Public Security where the equivalent subject falls under the licensing authority of the Ministry of Natural Resources and Environment, except as stipulated in Articles 15, 29, 30, 31, 35 and 38 of this Decree | | |
| - Failure to report to the licensing authority for review and resolution in case of changes compared to the content of the issued license as prescribed; submitting the application for an environmental license after the prescribed deadline; | 15,000,000 VND | 20,000,000 VND |
| - Failure to publicly disclose environmental permits as required; | 20,000,000 VND | 30,000,000 VND |
| - Providing inaccurate or untruthful information about waste in the application for an environmental permit as prescribed; failing to properly or fully implement one of the contents of the environmental permit as prescribed, except in the following cases: violations of regulations on environmental monitoring, prevention and response to waste incidents, and cases specified in points a, b, d, e, and g of this clause; | 30,000,000 VND | 40,000,000 VND |
◦ Failure to inspect wastewater treatment facilities and equipment to determine the cause of pollution or failure to renovate and upgrade wastewater treatment facilities as required in cases where the reported pollution data is inaccurate or in cases of violations regarding the discharge of wastewater, dust, and exhaust gases exceeding environmental technical standards; | 100,000,000 VND | 150,000,000 VND |
| - Providing inaccurate or untruthful information about the completion results of works and environmental protection measures in the environmental permit application report for investment projects that have received approval for the environmental impact assessment report before going into trial operation as prescribed; failing to renew or adjust the environmental permit as prescribed; failing to implement the contents of the environmental permit as prescribed, except in cases of: violations of regulations on environmental monitoring; prevention and response to waste incidents and cases specified in points a, b, c, e and g of this clause; | VND 150,000,000 | VND 200,000,000 |
◦ No environmental permit was reissued as required. | 200,000,000 VND | 220,000,000 VND |
| - Failure to operate, infrequent operation, or improper operation of wastewater treatment facilities; construction of wastewater treatment facilities not in accordance with the environmental permit; | 220,000,000 VND | 250,000,000 VND |
◦ Construction, installation of equipment, pipelines or other discharge lines for discharging untreated waste into the environment; failure to construct environmental protection facilities as required. | 800,000,000 VND | 1,000,000,000 VND |
| Violation of regulations on trial operation of wastewater treatment facilities of investment projects (Article 12) | | |
| Investment projects falling under the environmental permit issuance authority of the District People's Committee or under the licensing authority of the Ministry of National Defense or the Ministry of Public Security, where the equivalent subject falls under the licensing authority of the District People's Committee | | |
| - Failure to notify the competent state agency of the plan for trial operation of the wastewater treatment facility or project components as required; lack of an operation logbook or failure to fully record information on the trial operation of the wastewater treatment facility as required; failure to coordinate with the provincial-level environmental protection agency where the project is implemented for inspection and supervision during the trial operation as required; | 10,000,000 VND | 15,000,000 VND |
| - Failure to cease operations, reduce the capacity of the investment project, or review waste treatment facilities and equipment, and waste treatment system operating procedures to determine the cause of pollution; or failure to renovate, upgrade, or construct additional waste treatment facilities to meet environmental protection requirements as prescribed in cases where waste discharged into the environment does not meet environmental technical standards for waste during the trial operation of the waste treatment facility; | 15,000,000 VND | 20,000,000 VND |
| - Failure to prepare and submit trial operation reports for investment projects and facilities to the competent authority for environmental permit issuance as required. | 25,000,000 VND | 30,000,000 VND |
| - Failure to conduct trial operation or re-trial operation of wastewater treatment facilities as prescribed; conducting trial operation of wastewater treatment facilities beyond the prescribed time without written notification of extension of the trial operation period; failure to implement, incorrect implementation, or incomplete implementation of the wastewater monitoring program (regarding parameters, locations, and monitoring frequency) or coordinating with an organization not qualified to operate environmental monitoring services to monitor wastewater and evaluate the effectiveness of wastewater treatment facilities during trial operation as prescribed; failure to monitor and supervise the results of automatic and continuous monitoring of wastewater, dust, and exhaust gases, or failure to connect and transmit data to the provincial-level specialized environmental protection agency where the project is implemented in cases where automatic wastewater, dust, and exhaust gas monitoring is required; | 30,000,000 VND | 40,000,000 VND |
| - Failure to immediately cease trial operation of the wastewater treatment facility or failure to promptly report to the environmental permit issuing authority or competent state agency in case of causing an environmental incident or environmental pollution. | 40,000,000 VND | 50,000,000 VND |
| Investment projects falling under the environmental permit issuance authority of the Provincial People's Committee or under the licensing authority of the Ministry of National Defense or the Ministry of Public Security, where the equivalent subject falls under the licensing authority of the Provincial People's Committee | | |
| - Failure to notify the competent state agency of the plan for trial operation of the wastewater treatment facility or project components as required; lack of an operation logbook or failure to fully record information on the trial operation of the wastewater treatment facility as required; failure to coordinate with the provincial-level environmental protection agency where the project is implemented for inspection and supervision during the trial operation as required; | 15,000,000 VND | 20,000,000 VND |
| - Failure to cease operations, reduce the capacity of the investment project, or review waste treatment facilities and equipment, and waste treatment system operating procedures to determine the cause of pollution; or failure to renovate, upgrade, or construct additional waste treatment facilities to meet environmental protection requirements as prescribed in cases where waste discharged into the environment does not meet environmental technical standards for waste during the trial operation of the waste treatment facility; | 20,000,000 VND | 30,000,000 VND |
| - Failure to prepare and submit trial operation reports for investment projects and facilities to the competent authority for environmental permit issuance as required. | 40,000,000 VND | 60,000,000 VND |
| - Failure to conduct trial operation or re-trial operation of wastewater treatment facilities as prescribed; conducting trial operation of wastewater treatment facilities beyond the prescribed time without written notification of extension of the trial operation period; failure to implement, incorrect implementation, or incomplete implementation of the wastewater monitoring program (regarding parameters, locations, and monitoring frequency) or coordinating with an organization not qualified to operate environmental monitoring services to monitor wastewater and evaluate the effectiveness of wastewater treatment facilities during trial operation as prescribed; failure to monitor and supervise the results of automatic and continuous monitoring of wastewater, dust, and exhaust gases, or failure to connect and transmit data to the provincial-level specialized environmental protection agency where the project is implemented in cases where automatic wastewater, dust, and exhaust gas monitoring is required; | 60,000,000 VND | 80,000,000 VND |
◦ Failure to immediately cease trial operation of the wastewater treatment facility or failure to promptly report to the environmental permit issuing authority or competent state agency in case of causing an environmental incident or environmental pollution. | 80,000,000 VND | 100,000,000 VND
| Investment projects falling under the environmental permit granting authority of the Ministry of Natural Resources and Environment or under the licensing authority of the Ministry of National Defense or the Ministry of Public Security, where the equivalent subject falls under the licensing authority of the Ministry of Natural Resources and Environment | | |
| - Failure to notify the competent state agency of the plan for trial operation of the wastewater treatment facility or project components as required; lack of an operation logbook or failure to fully record information on the trial operation of the wastewater treatment facility as required; failure to coordinate with the provincial-level environmental protection agency where the project is implemented for inspection and supervision during the trial operation as required; | 20,000,000 VND | 30,000,000 VND |
| - Failure to cease operations, reduce the capacity of the investment project or facility, or review waste treatment facilities and equipment, or waste treatment system operating procedures to determine the cause of pollution; or failure to renovate, upgrade, or construct additional waste treatment facilities to meet environmental protection requirements as prescribed in cases where waste discharged into the environment does not meet environmental technical standards for waste during the trial operation of the waste treatment facility; | 30,000,000 VND | 40,000,000 VND |
| - Failure to prepare and submit trial operation reports for the investment project to the competent authority for environmental permit issuance as required. | 60,000,000 VND | 80,000,000 VND |
| - Failure to conduct trial operation or re-trial operation of wastewater treatment facilities as prescribed; conducting trial operation of wastewater treatment facilities beyond the prescribed time without written notification of extension of the trial operation period; failure to implement, incorrect implementation, or incomplete implementation of the wastewater monitoring program (regarding parameters, locations, and monitoring frequency) or coordinating with an organization not qualified to operate environmental monitoring services to monitor wastewater and evaluate the effectiveness of wastewater treatment facilities during trial operation as prescribed; failure to monitor and supervise the results of automatic and continuous monitoring of wastewater, dust, and exhaust gases, or failure to connect and transmit data to the provincial-level specialized environmental protection agency where the project is implemented in cases where automatic wastewater, dust, and exhaust gas monitoring is required; | 80,000,000 VND | 100,000,000 VND |
◦ Failure to immediately cease trial operation of the wastewater treatment facility or failure to promptly report to the environmental permit issuing authority or competent state agency in case of causing an environmental incident or environmental pollution. | 100,000,000 VND | 120,000,000 VND |
| Violation of environmental protection regulations in the absence of a decision approving the results of the environmental impact assessment report as prescribed (Article 13) | | |
| Investment projects and facilities that require environmental impact assessment reports and fall under the approval authority of the Provincial People's Committee or the Ministry of National Defense, Ministry of Public Security, and have environmental criteria equivalent to investment projects and facilities under the approval authority of the Provincial People's Committee, when implementing construction or operation, violate regulations on environmental protection, except for acts specified in Article 14 of this Decree | | |