Layout & language AEN
Sign in
Posted date: 17-Sep-2025 4:39:09 PM VN
Some new points of the:

Decree No. 214/2025/NĐ-CP⚠️ - The bidding process and contractor selection apply from 4/8/2025

on replacing of:
  • Decree No. 24/2024/NĐ-CP⛔ - Framework regulations on direct bidding and online bidding
Effective date: 04-Aug-2025
What's new
These are completely new regulations, only available in Decree No. 214/2025/ND-CP:
• Assessment of contractor reputation when participating in bidding: Article 20 of Decree No. 214/2025/ND-CP details the assessment of contractor's reputation in participating in bidding based on acts such as failing to negotiate contracts, withdrawing dossiers after the time of bid closing, etc. failing to take measures to ensure the performance of contracts... This regulation emphasizes the handling of irresponsible contractors during the bidding process.
• Bidding packages subject to short-list selection, bidding dossiers do not need to stipulate criteria for evaluation of capacity and experience and general standards: Article 37 of Decree No. 214/2025/ND-CP stipulates that "For bidding packages that have been prequalified, bidding dossiers do not need to stipulate criteria for evaluation of contractors' capacity and experience but must require contractors to update information on the contractor's capacity. Criteria for general assessment (in case of application of the method of combining technique and price) shall comply with the provisions of Article 38 of this Decree."
• Criteria for selecting members of expert groups and appraisal teams in the fields of national defense security, science and technology, and health: Article 21 of Decree No. 214/2025/ND-CP detailing the selection of members of expert groups and appraisal teams in specific fields such as national security and defense, science, technology and health, creating more flexible conditions in selecting personnel with appropriate expertise.
• Disclosure of goods quality: Clauses 5, 6, 7, Article 20 of Decree No. 214/2025/ND-CP detail the disclosure of information on the quality of goods used, especially for items such as drugs, testing supplies, and medical equipment.
• In case of inviting 01 contractor but failing to meet the requirements: Clause 2, Article 28, Clause 2, Article 40 of Decree No. 214/2025/ND-CP stipulates that, "for international bidding, in case of ineligibility to determine that the domestic contractor cannot participate in any part of the work of the bidding package, The investor may take the step of surveying the interest of contractors on the National Bidding Network System as follows: Posting a notice requesting domestic contractors to participate together with the bidding dossier so that domestic contractors can register one or several work items of the bidding package that such contractors can undertake within the time at least 05 working days; at the end of the registration period, in case there is no domestic contractor registered, the foreign contractor is not required to enter into a partnership or use a subcontractor who is a domestic contractor, in this case, the bidding dossier does not stipulate that the foreign contractor must enter into a partnership with a domestic contractor or use a domestic subcontractor;"
• Locking the contractor's account due to deliberately declaring wrong personnel and equipment: Clause 2, Article 29 of Decree No. 214/2025/ND-CP supplements the provision "In case the contractor deliberately declares key personnel and equipment mainly untruthfully in the bid dossier in order to falsify the results of contractor selection, it is not allowed to replace personnel. other equipment, the bid dossier of the contractor shall be disqualified and the contractor shall be considered as fraudulent under the provisions of Point b, Clause 4, Article 16 of the Bidding Law and shall be handled according to the provisions of Clause 1, Article 133 of this Decree."
• New regulations on trademark requirements by trademark group: Clause 5, Article 26 of Decree No. 214/2025/ND-CP stipulates that "... The bidding dossier should stipulate that the contractor may propose a construction method different from the construction method stated in the bidding dossier. For the contents of construction and installation work in the construction and installation bidding package, EC, the technical evaluation criteria shall be given to the requirements for trademarks according to the group of marks for raw materials, materials and other inputs (inputs for the construction in accordance with the law on construction of work items specified in the bidding dossier that are not a work item of the bidding package). Contractors are offered according to the marks of raw materials, supplies and other input factors as prescribed in the bidding documents or other marks of equal or better quality."
Changes
Below is a table comparing the detailed changes between Decree No. 214/2025/ND-CP and Decree No. 24/2024/ND-CP:
SpotlightOld (Decree No. 24/2024/ND-CP)New (Decree No. 214/2025/ND-CP)
Contractor Selection Master Planning Costs0.5% of the cost of preparing the feasibility study report but the minimum is 5,000,000 VND and the maximum is 40,000,000 VND (Clause 3, Article 12).0.5% of the cost of preparing the feasibility study report but the minimum is 5,000,000 VND and the maximum is 40,000,000 VND, plus the word appraisal (Clause 3, Article 14).
Cost of maintaining a name and portfolio330,000 VND for 01 year (Point a, Clause 9, Article 12)330,000 VND for 01 year (including VAT) (Point a, Clause 9, Article 14).
Bid Submission Costs330,000 VND for 01 bidding package for open bidding, limited bidding, online bidding according to the normal process; 220,000 VND for 01 bidding package for competitive bidding (Point b, Clause 9, Article 12)330,000 VND for 01 bidding package (including VAT) for open bidding, limited bidding, online bidding according to the normal process; 220,000 VND for 01 bidding package (including VAT) for competitive bidding (Point b, Clause 9, Article 14)
Contractor information on the national procurement systemOrganizations and individuals that deliberately post information specified in Articles 7 and 8 of the Bidding Law but the content of this information is not true shall be blocked from their accounts for a period of 12 months from the date of detection of this act. (Clause 4, Article 23)Organizations and individuals that deliberately update account information as prescribed in Clause 2 of this Article or post information specified in Articles 7 and 8 of the Bidding Law but the content of this information is not true shall be blocked from their accounts for a period of 12 months from the date of detection of this act. (Clause 4, Article 23)
The time to prepare Bids for bidding packages is not more than 10 billion VND and not more than 20 billion VNDBidding dossiers shall be issued on the National Bidding Network System. The minimum time for preparing bids is 18 days for domestic bidding and 35 days for international bidding; for construction and installation and mixed bidding packages with a bidding package price of not more than VND 20 billion, bidding packages for procurement of non-consultancy goods and services with a bidding package price of not more than VND 10 billion, the time for preparing bids is at least 09 days for domestic bidding. 18 days for international bidding;Bidding dossiers shall be issued on the National Bidding Network System. The minimum time for preparing bids is 18 days for domestic bidding and 35 days for international bidding; for construction and installation and mixed bidding packages with a bidding package price of not more than VND 20 billion, bidding packages for procurement of non-consultancy goods and services with a bidding package price of not more than VND 10 billion, the time for preparing bids is at least 09 days for domestic bidding. 18 days for international bidding; in case the bidding package is eligible for the application of the form of contractor appointment as prescribed in Clause 1, Article 78 of this Decree but the investor decides to apply the form of open bidding to select contractors, the time limit for preparing the bid dossier is at least 09 days from the first date the bidding dossier is issued to the effective date bidding point.
Amendment of Bid DocumentsIn case of modification of the bidding dossier after issuance, the investor must post the amendment decision together with the amended bidding dossier and the amended contents of the bidding dossier on the National Bidding Network System. The amendment of the bidding dossier shall be carried out at least 10 days before the date of bid closing; For construction and installation and mixed bidding packages with a bidding package price of not more than VND 20 billion, bidding packages for procurement of non-consultancy goods and services with a bidding package price of not more than VND 10 billion, the amendment of bidding dossiers shall be carried out at least 03 working days before the bid closing date. In case of failure to ensure sufficient time, the time for bid closure must be extended;In case of modification of the bidding dossier after issuance, the investor must post the amendment decision together with the amended bidding dossier and the amended contents of the bidding dossier on the National Bidding Network System. The amendment of the bidding dossier shall be carried out at least 10 days before the date of bid closing; For construction and installation and mixed bidding packages with a bidding package price of not more than VND 20 billion, bidding packages for procurement of non-consultancy goods and services with a bidding package price of not more than VND 10 billion, the amendment of bidding dossiers shall be carried out at least 03 working days before the bid closing date. In case of failing to ensure sufficient time, the time for bid closure must be extended;
Market Analysis & Consultationb) The market consultation shall be conducted in one or more of the following ways: refer to the latest market consultation results for similar goods and services; posting market consultation questions on appropriate media; researching catalogues and product introduction documents of manufacturers, suppliers, distributors, agents; refer to the experience of other investors who have conducted market consultations, consultation on the results of contractor selection for bidding packages for procurement of similar goods and services; organize market consultation conferences with potential contractors on the basis of publicity and transparency; organizing information surveys from production and business units; consulting experts in relevant fields, print newspapers, magazines, specialized market analysis publications, information on the Internet and other appropriate forms;b) The market consultation shall be conducted in one or more of the following ways: referring to the latest market consultation results for goods, similar services; posting market consultation questions on appropriate media; researching catalogues and product introduction documents of manufacturers, suppliers, distributors, agents; refer to the experience of other investors who have conducted market consultations, consultation on the results of contractor selection for bidding packages for procurement of similar goods and services; organize market consultation conferences with potential contractors on the basis of publicity and transparency; organizing information surveys from production and business units; consulting experts in relevant fields, print newspapers, magazines, specialized market analysis publications, information on the Internet and other appropriate forms; Based on the size and nature of the bidding package, the market analysis and consultation include information on the availability of goods and services in the bidding package on the market; costs that may arise in case it is necessary to apply innovative and creative solutions; the content of the warranty clause, the type of contract usually applied to the procurement of similar goods and services of other investors; provisions of law (if any) for goods and services in bidding packages; the ability to apply sustainable bidding, procurement of environmentally friendly services, information on goods and services using recycled and energy-saving materials; the ability to participate in bidding of potential contractors who are small and micro enterprises, innovative start-up enterprises, enterprises employing many female workers, laborers who are war invalids, people with disabilities, ethnic minorities; supply chain analysis (the ability to supply supplies, materials, goods and services for the performance of contracts); the ability to organize the selection of contractors but only allow goods of Vietnamese origin to be offered for bidding under the provisions of Point e, Clause 3, Article 10 and Clause 1, Article 56 of the Bidding Law and other necessary information;
Evaluation of technical dossiersb) Contractors with capacity and experience to meet the requirements for technical consideration and evaluation. (Clause 3, Article 32)b) The contractor has the capacity and experience to meet the requirements for technical consideration and evaluation. For procurement of goods, contractors being individuals or groups of individuals bidding for their innovative products that meet the provisions of Clause 4, Article 6 of this Demon are not required to meet a number of criteria specified in Clause 3, Article 10 of this Decree. (Clause 3, Article 32)
Technical Document Evaluation(5). For bidding packages organized for domestic bidding, the expert team shall evaluate the contents of key personnel, main construction equipment of the construction and installation bidding package, PC, construction and installation part in the EC bidding package on the basis of the contractor's commitment in the bid form without evaluating according to the declared contents, documents attached to the bid dossier. After the financial assessment, the first-ranked contractor shall be evaluated in detail on key personnel and construction equipment according to the declaration and attached documents of the contractor in the bid dossier. In case the contents of the declaration and attached documents of the contractor are not satisfactory, the investor shall request the contractor to clarify the bid dossier in order to supplement or change key personnel and construction equipment mainly compared to the declared contents and documents attached in the bid dossier. The addition or change of each key personnel and main construction equipment that cannot meet the requirements is carried out a maximum of 02 times to ensure that the contractor has key personnel and main construction equipment that meets the requirements of the bidding dossier as committed in the bidding application. In case the contractor fails to supplement or replace key personnel and main construction equipment or after clarification, supplementation or replacement, the contractor fails to arrange key personnel and main construction equipment to meet the requirements of the bidding dossier as committed in the bidding application, the contractor will be disqualified and assessed for its prestige when participating bidding under the provisions of Article 20 of this Decree shall have their accounts locked for a period of 03 months from the date the investor publicizes the contractor's name on the National Procurement Network System.(2). In case the key personnel (except for the key personnel performing the consultancy work (E) in the EPC, EP, EC, turnkey bidding packages), the main equipment proposed by the contractor in the bid dossier does not meet the requirements or fails to prove the ability to mobilize personnel (including the case of personnel mobilized for other contracts with the working time coincides with the time of implementation of this bidding package), the investor shall allow the contractor to supplement or replace it. Contractors are only allowed to supplement and replace each key personnel and equipment position only once within an appropriate period of time.
Evaluation Guidelines(2). In case the bidding package is organized by domestic bidding, the expert team shall evaluate the contents of key personnel, main construction equipment of the construction and installation bidding package, PC, construction and installation part in the EC bidding package on the basis of the contractor's commitment in the bid application without evaluating according to the declared contents. documents attached to the bid dossier. After the financial assessment, the first-ranked contractor shall be evaluated in detail on key personnel and construction equipment according to the declaration and attached documents of the contractor in the bid dossier. In case the contents of the declaration and attached documents of the contractor are not satisfactory, the investor shall request the contractor to clarify the bid dossier in order to supplement or change key personnel and construction equipment mainly compared to the declared contents and documents attached in the bid dossier. The addition or change of each key personnel and main construction equipment that cannot meet the requirements is carried out a maximum of 02 times to ensure that the contractor has key personnel and main construction equipment that meets the requirements of the bidding dossier as committed in the bidding application. In case the contractor fails to supplement or replace key personnel and main construction equipment or after clarification, supplementation or replacement, the contractor fails to arrange key personnel and main construction equipment to meet the requirements of the bidding dossier as committed in the bidding application, the contractor will be disqualified and assessed for its prestige when participating bidding under the provisions of Article 20 of this Decree shall have their accounts locked for a period of 03 months from the date the investor publicizes the contractor's name on the National Procurement Network System. In case the contractor deliberately declares key personnel and main equipment untruthfully in the bid dossier in order to falsify the contractor selection results, it is not allowed to replace other personnel and equipment, the bid dossier of the contractor is disqualified and the contractor will be considered fraudulent according to the provisions of Point b, Clause 4, Article 16 of the Law on Auction and shall be handled according to the provisions of Clause 1, Article 133 of this Decree. (Article 29)
Capacity conditions for bidding packages requiring technology transferb) For transferred technologies on the list of industries eligible for investment incentives, the list of technologies encouraged for transfer as prescribed by law, apart from the incentives specified at Point a of this Clause, they are not required to meet the requirements for certification of successful operation, The time the product has been used ensures the quality requirement is confirmed by the user. In case the technology transferor commits to the investor to take responsibility for the quality of the products produced by the contractor at the request of the investor, the contractor receiving the technology transfer may use the documents and test results of the technology transferor for the transferred technology object to prove the verifiability and the conformity of the type of manufactured goods for the contents transferred under the technology transfer contract or the technology transfer certificate specified in Clause 4 of this Article issued by a competent agency; (Clause 1, Article 10)b) For the transferred technologies on the list of industries eligible for investment incentives, the list of technologies encouraged for transfer as prescribed by law, in addition to the incentives specified at Point a of this Clause, they are not required to meet the requirements for certification of successful operation, The time the product has been used ensures the quality requirement is confirmed by the user. In case the technology transferor commits to the investor to take responsibility for the quality of the products produced by the contractor at the request of the investor, the contractor receiving the technology transfer may use the documents and test results of the technology transferor for the transferred technology object to prove the verifiability and the conformity of the type of manufactured goods for the contents transferred under the technology transfer contract or the technology transfer certificate specified in Clause 4 of this Article issued by a competent agency; c) Requirements on capacity, experience, quality of goods, technical requirements and other requirements of the bidding package other than those specified at Points a and b of this Clause shall be specified on the same evaluation ground for all participating contractors. In case of necessity, the investor may request additional contractors to enjoy incentives, including: increasing the warranty period, strengthening quality control during production and ex-factory testing, providing operation, maintenance services and other contents to ensure the reliability of goods during operation. (Clause 1, Article 10)
Removal points
• Conditions for ensuring competition in the assessment of eligibility and requirements for capacity and experience: Decree No. 24/2024/ND-CP clearly stipulates these conditions, Decree No. 214/2025/ND-CP does not repeat them.
• Incentives for domestic contractors in the cases specified at Point g, Clause 1, Article 10 of the Bidding Law: Clause 2, Article 9 of Decree 214/2025/ND-CP no longer stipulates "Domestic contractors in the cases specified at Point g, Clause 1, Article 10 of the Bidding Law when bidding for products, services produced or provided by contractors that do not have to meet the conditions on competition assurance in the assessment of eligibility and requirements on capacity and experience within 05 years from the date of recognition by competent agencies.", compared to Article 9, Decree 24/2024/ND-CP.
• Energy labels, eco-labels, etc. and equivalent products: Clause 1, Article 11 of Decree No. 214/2025/ND-CP stipulates that products and services certified as eco-labels, energy labels and equivalent as prescribed by law are entitled to incentives as prescribed in Clause 3, Article 10 of the Law on Bidding. compared to Clause 1, Article 11 of Decree No. 24/2024/ND-CP without this provision.
• Combination of technique and price, technique-based method for bidding packages applying the single-stage one-envelope contractor selection method: Clause 7, Article 26 of Decree No. 24/2024/ND-CP stipulates that "The combination of technique and price and technique-based methods shall not be used for bidding packages applying the method of house selection single-stage bidding with one dossier bag. For bidding packages that need to be considered on the basis of focusing on technical factors, the investor can stipulate that the minimum technical required score is not lower than 80% of the total maximum technical score.", Decree 214/2025/ND-CP does not have similar provisions.
• Cancellation of the decision approving contractor selection results: Point dd, Clause 2, Article 140, Decree No. 214/2025/ND-CP is no longer regulated compared to Decree No. 24/2024/ND-CP

ai-luatvietnam-icon-24 Change analysis

Found 644 posts Export list to Excel