Law No. 08/2017/QH14⚠️ - 2017 Law on irrigation

Effective date: 01-Jul-2018
Limitations
Strictly prohibited acts Article 8
It is strictly forbidden to commit acts such as construction in contravention of planning, dumping garbage, illegal discharge of wastewater, destruction of works, illegal exploitation of sand and gravel, exceeding the permitted load, obstructing inspection, arbitrarily operating or opposing emergency response orders and encroaching on land within the protection scope of irrigation works.
Restriction of activities in the work protection zone Article 44
All activities such as new construction, gathering materials, drilling and surveying, discharging wastewater, planting perennial trees, providing services, or circulating motor vehicles within the scope of protection of irrigation works must have permits from competent state agencies.
Regulations on boundaries of protected vicinity Article 40
The scope of the adjacent area to protect the work must comply with specific limits from the base of the dam (from 20m to 300m depending on the level of the work), from the foot of the outer roof of the canal (depending on the flow and type of canal) or from the culvert to each side of 50m.
Limit to existing works in the protected area Article 48
Existing works within the scope of protection if they do not affect safety may continue to be used but absolutely must not be expanded in scale or changed in structure; if they are affected, they must be remedied, dismantled or relocated.
Need to know
Mandatory regulations on economical use of water Article 5
Organizations and individuals are obliged to use water economically, efficiently and for the right purposes; at the same time, in planning, investment and operation, solutions to prevent water loss, water reuse and advanced irrigation for crops must be applied.
Mandatory requirements when investing in the construction of dams and reservoirs Article 18
Investors in the construction of dams and reservoirs are required to design to facilitate safety management, install monitoring and warning systems, and at the same time make natural disaster response plans and operation procedures and submit them to competent agencies for approval before storing water.
Strictly comply with the operating procedures Article 24
Organizations and individuals operating irrigation works are required to operate in accordance with the process approved by competent state agencies or self-establish and publicize small irrigation works.
Responsibility to ensure the safety of dams and reservoirs Article 45
Ensuring the safety of dams and reservoirs is the highest priority in management and exploitation; exploitation owners are required to carry out safety registration, monitoring, inspection and assessment of the current status periodically before the rainy season and strictly comply with flood control plans.
Obligation to protect irrigation works Article 42
When detecting acts of infringement or dam incidents, all organizations and individuals are responsible for immediately reporting them to the authorities; in which, the exploitation owner and the People's Committee at all levels must actively inspect and prevent violations and prepare forces and materials for timely rescue.
Conditions for changing the use purpose of the work Article 47
The change of use purpose of existing irrigation works is required to be approved by the agency that has approved the investment project, in accordance with the planning, ensuring the harmony of interests of the parties and the investor must compensate if causing damage.