Layout & language AEN
Sign in
Posted date: 5-Sep-2025 6:40:40 AM VN
Some amends and supplements of the

Law No. 50/2014/QH13⛔ - 2014 Construction Law

within:
  • Law No. 93/2025/QH15⚠️ - Law on Science, Technology and Innovation (2025)
  • Law No. 95/2025/QH15⚠️ - Railway Law 2025
  • Law No. 84/2025/QH15⚠️ - 2025 Law on Inspection
  • Law No. 61/2024/QH15⚠️ - 2024 Law on Electricity
  • Law No. 55/2024/QH15⚠️ - 2024 Law on Fire and Rescue
  • Law No. 47/2024/QH15⚠️ - 2024 Law on Urban and Rural Planning
  • Law No. 45/2024/QH15⚠️ - 2024 Law on Cultural heritage
  • Law No. 62/2020/QH14⛔ - Construction Law 2020 (amended version)
  • Law No. 40/2019/QH14⚠️ - 2019 Law on Architecture
  • Law No. 35/2018/QH14status2 - Amendments to 37 Laws pertaining to planning
  • Law No. 03/2016/QH14status2 - The new List of conditional business lines
  • Effected from: 01-Jan-2026
    Here is a detailed breakdown of the differences between the two texts:
    New Additions
    • Article 3: Supplementing Clause 15a on "Investment projects on construction of urban areas".
    • Article 3: Clause 46 is supplemented with the definition of "Danger zones in the construction of works".
    • Article 4: Clause 9 is supplemented on the fact that when formulating and implementing construction planning, construction investment, management and operation of construction works and development of construction materials, there must be technical and management solutions to ensure economical and efficient use of energy, natural resources and environmental protection.
    • Article 34: Point c is added after Point b, Clause 2 as follows:
    "c) Planning for zoning for construction of functional zones.".
    • Article 49: Point h is added after Point g, Clause 3 of the Law on Construction No. 50/2014/QH13 as follows:
    "h) Investment projects on preservation, restoration and restoration of historical-cultural relics and scenic spots".
    • Article 53: Clause 7 is supplemented on "Preliminary assessment of environmental impacts in accordance with the law on environmental protection and other contents in accordance with relevant laws." in the content of the pre-feasibility study report on construction investment.
    • Article 54: Point d1 is added after Point d, Clause 2 on "Housing construction investment projects, urban area construction investment projects, in addition to the contents specified at Points a, b, c and d of this Clause, must contain information on types of houses, the implementation of requirements on social housing (if any). For an investment project on construction of an urban area, there must be an explanation of the plan for synchronous construction of technical and social infrastructure of the project and connection with technical and social infrastructure outside the scope of the project or the plan for handing over the work".
    • Article 78: Point d is added after Point c, Clause 1 as follows:
    "d) For railway projects, the overall technical design (FEED) is formulated to replace the basic design in the feasibility study report; the selection of construction and installation contractors, contractors to perform EPC, EC, EP and turnkey contracts shall be carried out on the basis of the approved investment project; the investor may decide on the approval of the design steps after the FEED design.".
    • Article 78: Point b Clause 2 is added as follows:
    "b) Two-step design including basic design and construction drawing design; FEED design and construction drawing design, for the case specified at Point d, Clause 1 of this Article;".
    • Article 83a: Article 83a is added after Article 83, detailing the "Appraisal of construction designs implemented after basic design of specialized construction agencies" for specific works and the competence and contents of appraisal of specialized agencies.
    • Article 87a: Article 87a is added after Article 87, providing for "Rights and obligations of construction design verification organizations."
    • Article 89: Point i1 is added after Point i and Point k Clause 2 is amended as follows:
    "i1) Offshore works belonging to offshore wind power projects that have been assigned sea areas by competent authorities for project implementation;
    k) The work construction investor specified at Points b, e, g, h, i and i1 of this Clause, except for the detached houses specified at Point i of this Clause, shall send a notice of the time of commencement of construction and the construction design dossier as prescribed to the local state management agency in charge of construction for management.".
    Changes
    • Article 3:
    ◦ Clause 1: Minor changes in wording, clarifying the purpose of the pre-feasibility study report.
    ◦ Clause 4: Amending the scope of management of the Ministry in charge of specialized construction works, emphasizing the management in accordance with the provisions of this Law.
    ◦ Clause 10: Minor changes in expression, focusing on the fact that the work is "built according to design".
    ◦ Clause 13: Addition of management boards of industrial parks, export processing zones, hi-tech parks and economic zones to the subjects of specialized agencies in charge of construction
    ◦ Clause 36: Changing and supplementing the definition of appraisal, more clearly defining the subjects of appraisal.
    • Article 4:
    ◦ Clause 1: Changes to be more in line with reality, adding "natural disaster prevention and control" and "response to climate change".
    ◦ Clause 6: Correction and clarification of responsibilities of organizations and individuals.
    ◦ Clauses 8 and 9: Clause 9 is supplemented with regulations on the efficient use of energy, natural resources and environmental protection when formulating and implementing construction planning.
    • Article 5: Change the entire contents, more details on the types and grades of construction works and assign the authority to provide detailed regulations to the Government and the Minister of Construction.
    • Article 7: Change the entire content, more detailed on the determination of the investor and based on the capital source.
    • Article 9: Point c Clause 2: Changes in insurance buyers, expansion of insurance purchase liability for third parties.
    • Article 10:
    ◦ Clause 1: Changes in incentives for activities, especially in disadvantaged areas affected by climate change.
    ◦ Clause 4 is added to encourage the application of advanced science and technology and information technology in construction investment activities.
    • Article 34:
    ◦ Clause 3: Supplementing the requirements for written consent of the construction planning management agency of the provincial-level People's Committee before the district-level People's Committee approves it.
    • Article 49: Changing the entire content of Article 49, classifying projects according to many different criteria.
    • Article 50: Clause 2: changes and clarifies the division of projects into component projects and investment phases.
    • Article 52: Change the entire content, more detailed on formulation of construction investment projects.
    • Article 56: Changing the entire content of Article 56 on the appraisal of construction investment feasibility study reports, construction investment economic-technical reports.
    • Article 57: Changes to the entire contents of the appraisal of the construction investment feasibility study report and the construction investment economic-technical report of the investment decider
    • Article 58: Changes to all contents of the appraisal of construction investment feasibility study reports of specialized construction agencies
    • Article 59: Change the entire content of the time for appraisal of the construction investment feasibility study report.
    • Article 60: Changes to the entire content of the competence to decide on construction investment.
    • Article 61: Changes in cases eligible for adjustment of construction investment projects using state capital, and at the same time add cases of adjustment of investment policies.
    • Article 62: Changes in the form of organization and management of construction investment projects.
    • Article 64: Clause 1: Minor changes in expression, affirming that the investor establishes a project management board for investment in the construction of a project.
    • Article 71: Changes the entire content of Article 71, detailing and delineating more clearly the rights and responsibilities of agencies and organizations that appraise and verify construction investment feasibility study reports and construction investment econo-technical reports.
    • Article 72:
    ◦ Point a, Clause 1: Changes in project approval.
    ◦ Point d, Clause 2: Point d, Clause 2 is abolished.
    • Article 78: Changes and supplements to Article 78 on General regulations on construction design.
    • Article 82: Changing all contents, more detailed regulations on the competence to appraise and approve technical designs, construction drawing designs and construction cost estimates.
    • Article 83: Changes to all contents on appraisal of construction designs implemented after basic design and construction cost estimates.
    • Article 85: Changes in the rights and obligations of investors in construction design.
    • Article 87: Changes in rights and responsibilities of agencies and organizations appraising construction designs and cost estimates.
    • Article 89: Changes and supplements to Article 89 on General regulations on issuance of construction permits.
    • Article 91: Clause 2 of Article 91 is amended as follows:
    "2. Conformity with land use purposes in accordance with the provisions of the land law.".
    • Article 93: To amend and supplement Point a, Clause 1, Article 93 as follows:
    "a) Conformity with land use purposes according to the approved land use planning and architectural management regulations promulgated by competent state agencies;".
    • Article 94: Changes and supplements to the conditions for granting construction permits with a definite term.
    • Article 95: Changes and supplements to dossiers of application for new construction permits.
    • Article 96: Clause 4 of Article 96 is amended as follows:
    "4. For works of historical-cultural relics and scenic spots and scenic spots that have been ranked, there must be written approval of the necessity of construction and the scale of the works of the state management agency in charge of culture.".
    • Article 102: Changes in the process and time for issuance, re-issuance, adjustment and extension of construction permits.
    • Article 103: Changes in the competence to grant, adjust, extend, re-grant and revoke construction permits
    • Article 106: Changes to the notice of construction commencement date
    • Article 107: Changes in conditions for commencement of construction of works
    • Article 110: Changes to requirements on the use of building materials
    • Article 112: Changes in the rights and obligations of investors in the construction of works
    • Article 113: Changes in the rights and obligations of construction contractors
    • Article 115: Changes in the content of safety in the construction of works.
    • Article 118: Changes in cases of demolition of construction works and Responsibilities of the parties in the demolition of construction works
    • Article 123: Clause 4 and Clause 5 of Article 123 are amended as follows:
    "4. Construction works belonging to projects of national importance, large-scale and technically complex works; the project has a great impact on safety and community benefits; works using public investment capital must be inspected for acceptance during the construction process and upon completion of the construction of the work. Responsibilities for organizing the inspection of the acceptance test are prescribed as follows:
    a) The Council established by the Prime Minister shall organize the inspection of the acceptance test of construction works of national importance, large-scale and technically complex works;
    b) Specialized construction agencies shall inspect the acceptance test of investors for construction works other than those specified at Point a of this Clause.
    5) The Government shall provide detailed regulations on quality management, acceptance and settlement of incidents of construction works and large-scale and technically complex works.".
    • Article 124: Supplementing requirements on synchronization of technical and social infrastructure for investment projects on construction of urban areas upon handover of works.
    • Article 126: Amendments and supplements to Clauses 4 and 5 on requirements for maintenance of construction works
    • Article 130: Amendments and supplements to emergency works
    • Article 131: Amendments and supplements to temporary works
    • Article 132: Clause 2: Minor changes in expression, emphasizing the role of the State in cost management.
    • Article 136: Elaborating the application and reference to the system of construction norms and announcing the construction price index.
    • Article 137: Changes in payment and settlement of construction investment projects.
    • Article 148: Amendments to the capacity conditions of organizations and individuals engaged in construction activities.
    • Article 152: Changes in conditions of project management consultancy organizations and construction investment project management boards.
    • Article 154: Changes in conditions for organization of design and verification of work construction designs.
    • Article 157: Changes in conditions of work construction organization
    • Article 158: Expanding the subjects of independent practitioners within the scope of regulation.
    • Article 159: Changes in the management and supervision of construction capacity
    • Article 160: Clause 6 of Article 160 is amended as follows:
    "6. To manage the issuance, re-issuance, adjustment, conversion and revocation of permits, certificates, certifications and other results of settlement of administrative procedures in construction investment activities.".
    • Article 161: Article 161 is amended as follows:
    "Article 161. Responsibilities of the Government
    1. To perform the unified state management of construction investment activities nationwide; assign and decentralize state management to ministries, branches, localities and ministries managing specialized construction works; direct ministries, sectors and localities to implement the law on construction; direct the settlement of important, complicated issues and obstacles in the process of management of construction investment activities.
    2. To promulgate or submit to competent agencies for promulgation legal documents on construction; promulgate, direct the formulation and implementation of policies, strategies and plans to ensure effective construction investment, improvement of labor productivity, energy and resource saving, sustainable development; regulating the implementation of construction investment projects invested by domestic agencies, organizations and individuals abroad and the construction and management of the national information system and database on construction activities.".
    • Article 162: Changes in Responsibilities of the Ministry of Construction.
    • Article 163: Changes in responsibilities of ministries and ministerial-level agencies.
    • Article 164: Changes in Responsibilities of People's Committees at all levels.
    Annulment or lapse
    • Article 3: Abolishing Clause 29 on the definition of "Detached houses"
    • Article 81: Abolishing the entire Article 81 on "Examination and selection of architectural designs of construction works".
    • Article 48: Clause 2 of Article 48 is annulled, thereby abolishing the responsibility of the Ministry of Construction to direct and coordinate the management of inter-provincial regional construction planning, including: a) Determining the list of programs and plans for implementation of plannings and projects prioritized for investment in the construction of technical infrastructure systems, regional social infrastructure; b) Attract and coordinate investment capital sources for the development of the system of technical and social infrastructure works at the regional level; c) Review, adjust, examine and inspect the implementation of inter-provincial regional construction plannings; d) Assume the prime responsibility for, and coordinate with the presidents of relevant provincial-level People's Committees in, periodically reporting to the Prime Minister on the implementation of the planning on construction of inter-provincial regions according to the planning implementation period.
    • Article 63: Clause 1 of Article 63 is annulled, thereby annulling the provision that "Ministers, heads of ministerial-level agencies, presidents of provincial-level People's Committees, presidents of district-level People's Committees, competent representatives of state-owned enterprises shall decide on the establishment of specialized construction investment project management boards, Regional construction investment project management boards to manage a number of projects of the same specialty, work route or in the same area."
    • Article 140: Point h, Clause 3, Article 140 is annulled, thus abolishing the type of contract "h) Construction contracts using state capital only apply the types of contracts specified at Points a, b, c and d of this Clause or a combination of these types of contracts."
    • Article 148: Clause 4 of Article 148 is annulled, thereby annulling the provision that "Organizations participating in construction activities are classified into Grade I, Grade II and Grade III shall be assessed and granted certificates of competency by competent state agencies in charge of construction. The Ministry of Construction shall issue a certificate of competency of grade I; The Department of Construction shall issue certificates of competency of class II and III. Organizations participating in construction activities must register their business lines in accordance with law."
    • Article 150: Article 150 is annulled, thereby abolishing the regulation "Conditions for organization of construction planning design 1. Having sufficient conditions for the capacity to formulate appropriate construction planning designs.2. Individuals who assume the title of chief and chief designer of construction planning projects must have practice certificates and competencies suitable to each type of construction planning."
    • Chapter II: Abolishing Chapter II, the provisions on "CONSTRUCTION PLANNING" from Articles 13 to 48.
    • Article 159: Clause 2 of Article 159 is annulled, thereby annulling the regulation "Individuals who practice independently in construction activities are responsible for registering information about their practice capacity with the Department of Construction of the place where they permanently reside."
    Overview Comments on the Impact of Differences
    The difference between the two documents shows that the process of amending, supplementing and perfecting the Law on Construction aims to:
    • Concretization and clarification of regulations: Many provisions are interpreted in more detail, supplementing definitions, scope of application, conditions and responsibilities of relevant parties.
    • Strengthen state management: Focus on managing investment costs, managing work quality, labor safety, and environmental protection.
    • Decentralization and authorization: Provincial-level People's Committees are more decentralized and authorized in the issuance of permits and management of construction activities in the area.
    • Reform of administrative procedures: Abolish cumbersome regulations, simplify processes, and reduce the time to carry out procedures.
    • In line with reality: The new regulations are adjusted to be more in line with the reality of construction activities, especially in large, complex projects using state capital.
    • Focus on quality and safety: Uphold the responsibility of subjects participating in construction activities in ensuring the quality of works, occupational safety and environmental protection.
    • Synchronous planning system: Construction activities must comply with planning according to the law on urban and rural planning.
    • Improve management capacity: Promote the application of information technology in construction management.
    In summary, the amendments and supplements in Law No. 62/2020/QH14, Law No. 45/2024/QH15, Law No. 55/2024/QH15, Law No. 47/2024/QH15, Law No. 61/2024/QH15, Law No. 95/2025/QH15, Law No. 84/2025/QH15, Law No. 93/2025/QH15, Law No. 03/2016/QH14, Law No. 35/2018/QH14, Law No. 40/2019/QH14 aims to improve the effectiveness, effective state management in the field of construction, and at the same time create more favorable conditions for organizations and individuals to participate in construction activities. The abolition of some provisions helps to eliminate regulations that are no longer relevant or make it difficult to implement. The new regulations aim to build a sustainable, safe and effective construction industry.
    Posted date: 5-Sep-2025 5 2025 6:40AM VN
    Some new points of the:

    Law No. 50/2014/QH13⛔ - 2014 Construction Law

    on replacing of:
    Effective date: 01-Jan-2015
    Below is a detailed comparison between the Construction Law No. 50/2014/QH13 (Law No. 50/2014/QH13) and the Construction Law No. 16/2003/QH11 (Law No. 16/2003/QH11), pointing out the new points, changes and points removed in the new Law (Law No. 50/2014/QH13).
    What's New
    The completely new provisions only in the Law on Construction 2014 (Law No. 50/2014/QH13) include:
    Supervision and evaluation of construction investment projects of the community (Article 8*): Stipulating that investment projects on infrastructure construction using state capital, contributed capital of the community and funding capital of domestic organizations and individuals must be supervised by the community, organized by the Vietnam Fatherland Front.
    Insurance in construction investment activities (Article 9*): Specifying types of insurance in construction investment activities (construction insurance, consultancy professional liability insurance, insurance for supplies and materials, civil liability insurance, warranty insurance) and the responsibility to purchase compulsory insurance.
    Incentive policies in construction investment activities (Article 10*): Encouraging the application of advanced science and technology, using new materials, saving energy, protecting the environment, preserving historical relics, creating conditions for the construction of social housing and investment in construction in mountainous areas, the socio-economic region is extremely difficult.
    International cooperation in construction investment activities (Article 11*): Encouraging the expansion of international cooperation, technology transfer, and protection of Vietnamese construction brands abroad.
    • Work information system (Article 4.3): Requirements for application of work information system in construction investment activities.
    Construction planning permit (Article 47*): Regulations on construction planning permits in specific functional zones as a basis for making detailed planning or project formulation when there is no approved zoning planning or detailed construction planning.
    • Risk management (Article 66.1): Adding risk management content to the management content of construction investment projects.
    • Management of the work information system (Article 66.1): Supplementing the management of the work information system to the management of construction investment projects.
    • Ensuring the need to access and use convenient and safe works for people with disabilities, the elderly and children in public works and high-rise buildings. (Article 4.3).
    Changes
    The Law on Construction 2014 (Law No. 50/2014/QH13) has important changes compared to the Law on Construction 2003 (Law No. 16/2003/QH11) as follows:
    Classification of construction investment projects (Article 5, Article 49*): The 2014 Law classifies works by type and grade, the type of work is determined according to the use function, the grade of the work is determined according to the scale, purpose, importance, shelf life, materials used and technical requirements for the construction of the work, etc at the same time, classify construction investment projects according to their scale, nature, type of construction works and capital sources. The 2003 Law only classifies construction works into types and grades of works.
    Conditions for commencement of construction of works (Article 107*):
    ◦ The 2014 Law requires that there is a construction site to be handed over in whole or in part according to the construction schedule, have an approved construction drawing design, have a construction contract, be allocated sufficient capital according to the construction schedule, take measures to ensure safety, etc environmental protection.
    ◦ The 2003 Law does not have clear and detailed regulations like the 2014 Law.
    Contents of the construction investment feasibility study report (Article 54*) compared to the contents of the work construction investment project (Article 37, Law No. 16/2003/QH11): The 2014 Law more clearly stipulates the basic design, the requirement to show the main technical parameters in accordance with the standards, technical regulations apply.
    Competence to appraise construction investment projects (Article 57*): The 2014 Law provides in more detail the competence to appraise construction investment projects according to each source of capital (state capital, non-budget state capital, other capital) and type of project (of national importance, groups A, B, C), there is a clear decentralization of competence to appraise the basic design and other contents of the construction investment feasibility study report. The 2003 Law only provides for the general appraisal of work construction investment projects (Article 39).
    Adjustment of construction investment projects (Article 61*): The Law 2014 specifies the cases in which construction investment projects using state capital are adjusted (due to natural disasters, environmental incidents, bringing higher efficiency, planning changes, and increased construction price index).
    Form of project management organization (Article 62*): The 2014 Law stipulates the forms of project management organization including specialized and regional project management units, single-project project management units, hiring project management consultants or investors using affiliated professional apparatus. The 2003 Law does not specify but only provides general provisions on the content and form of project management (Article 45).
    Project implementation progress management (Article 67*): The 2014 Law stipulates that the construction schedule of works under projects funded by the state budget must not exceed the construction time approved by the investment decider.
    Conditions for issuance of construction permits (Articles 91, 92, 93, 94*): The Law 2014 stipulates in more detail the conditions for granting construction permits for works in urban areas, non-urban areas, detached houses and construction permits with a definite term, classified by area (urban, rural areas, areas with detailed planning, areas without detailed planning).
    Dossier of application for a construction permit (Articles 95, 96, 97*): The Law 2014 provides more detailed and complete regulations on the dossier of application for a new construction permit, repair, renovation and relocation of works, including specific works (religious works, monuments, etc.). monumental paintings, advertising works, works of diplomatic missions).
    Prohibited acts (Article 12*): The Law on Construction 2014 adds a number of prohibited acts compared to the Law on Construction 2003 such as:
    ◦ The construction investment decision is not in accordance with the provisions of this Law.
    ◦ Formulating, appraising and approving designs and cost estimates of construction works using state capital in contravention of the provisions of this Law.
    ◦ The investor selects a contractor who does not meet the capacity conditions to carry out construction activities.
    ◦ Producing and using construction materials that are harmful to public health and the environment.
    ◦ Giving and receiving bribes in construction investment activities; taking advantage of other legal entities to participate in construction activities; mediation, collusion to falsify the results of project formulation, survey, design and construction supervision of works.
    ◦ Abuse of position and power in violation of the law on construction; covering up and delaying the handling of violations of the construction law.
    ◦ Obstructing construction investment activities in accordance with the law.
    • Safety in construction (Article 115): The Law on Construction 2014 stipulates in more detail and specifically the responsibilities of investors and construction contractors in ensuring safety during construction.
    • Management and supervision of construction activity capacity (Article 159): Supplementing regulations on organizations participating in construction activities shall be responsible for registering information about their construction activity capacity with the Ministry of Construction and the Department of Construction of the locality where the organization's head office is located.
    • Construction price index (Article 136.4): Supplementing regulations on the Ministry of Construction announcing the national construction price index, provincial-level People's Committees announcing the construction price index in their localities.
    Removal Points
    The provisions and concepts in the Law on Construction 2003 (Law No. 16/2003/QH11) but not mentioned in the Law on Construction 2014 (Law No. 50/2014/QH13) include:
    • Unit price for construction planning (Article 12.2): Regulations on unit price for construction planning
    • Management of boundary markers in the field, management of the synchronous construction of urban technical infrastructure works (Article 34.1): These two contents of construction planning management have been removed.
    • The project management board must be responsible before the law and the investor (Article 45.3): Instead of stipulating that the project management board must be responsible before the law and the investor, the Construction Law 2014 only provides for the responsibility of the project management board in fulfilling the investor's obligations on project management within the scope of the commission rights (Article 69.2a).
    • Deadline for payment and settlement of investment capital (Article 81.2): Removing specific regulations on the time limit for payment and settlement of investment capital, but only stipulating that it must comply with the provisions of the law on investment capital management.
    • Contract bonuses, penalties for breach of contract (Article 110.2): Regulations on contract bonuses, penalties for breach of contract for works using state capital and bonus sources are abolished.

    ai-luatvietnam-icon-24 Change analysis

    Found 644 posts Export list to Excel