Promulgation of technical regulations on hydropower works
Circular No. 59/2025/TT-BCT dated 2/12/2025 of the Ministry of Industry and Trade on the promulgation of the National Technical Regulation on Hydropower Projects (47 pages)
Posted: 17/12/2025 8:52:38 AM | Latest updated: 21/12/2025 6:47:44 PM (GMT+7)
Effective: 1-Jun-2026
Status: No amendments
The following are the important points specified in the Circular:
• Promulgation of the National Technical Regulation on Hydropower Works (Article 1): This Circular promulgates the National Technical Regulation, symbol QCVN 27:2025/ BCT, stipulating mandatory technical requirements when building, repairing, upgrading or expanding hydropower projects. Compliance with this regulation is mandatory to ensure the safety and efficiency of hydropower projects.
• Scope of regulation (1.1): This Regulation stipulates the requirements for the investment stages (project preparation, project implementation, construction completion) and inspection and assessment of work safety in the construction and operation stages according to regulations, regardless of investment capital sources. This clearly defines the scope of application of the regulation, including works using state capital and private capital.
• Subjects of application (1.2): This Regulation applies to organizations and individuals involved in the activities specified at Point 1.1. This includes developers, contractors, design consultants, state management agencies and other stakeholders.
• Hydropower project classification (2.1): Hydropower projects are classified into 5 levels (especially, I, II, III, IV) depending on their size and importance. The building grade determines various technical requirements. (2.1.1.1)The grade of hydropower works shall be considered to be raised to one level (except for special-grade works) if an incident occurs in one of the main work items that may cause damage to important works related to national defense and security, urban areas or important political and economic centers. (2.1.2.4)
Major works of special grade, grade I and grade II must be equipped with monitoring equipment to assess the sustainability of the works, promptly detect damages and defects, if any, in order to decide on measures to repair, prevent incidents and improve operating conditions. (2.2.10)
• Requirements for environmental protection (2.6.1.3): The design and construction of reservoirs must meet environmental protection requirements according to current regulations. Adverse impacts must be analyzed and assessed and protective or mitigation measures must be taken. This emphasizes the importance of environmental protection during the construction and operation of hydropower projects.
• Responsibilities of organizations and individuals (4): Relevant organizations and individuals are responsible for implementing the provisions of this Regulation and are subject to inspection by state management agencies. The Electricity Department, the Department of Industrial Safety and Environment Engineering - the Ministry of Industry and Trade shall, according to their assigned functions, tasks and powers, disseminate and guide the implementation of this Regulation.
The Circular takes effect from June 1, 2026.